The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksNighthawk Energy Regulatory News (HAWK)

  • There is currently no data for HAWK

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling and Project Update

31 May 2007 07:03

Nighthawk Energy plc31 May 2007 NIGHTHAWK ENERGY PLC DRILLING AND PROJECT UPDATE The directors of Nighthawk Energy plc ("Nighthawk" or the "Company") (AIM: HAWK)are pleased to announce a significant expansion of the appraisal and developmentdrilling programme at the Devon oil field (formerly known as the VogelBartlesville project). The Company holds an 80 per cent. interest in thiswaterflood project and the operator, Running Foxes Petroleum Inc. ("RunningFoxes"), a 20 per cent. interest. The Devon oil field is located in Bourbon County, Kansas, within the CherokeeBasin, a prolific shallow oil and gas producing area. The current drilling istargeting Bartlesville channel sandstones located from 350 to 500 feet. Nighthawk has previously announced the results of the first four wells of thecurrent appraisal and development programme, all of which confirmed the presenceof oil saturated sandstones. These wells have been completed, logged and casedas future producers. In addition, the original project area of 160 acres hasbeen extended through land acquisition to 960 acres. A further 11 wells have now been completed, logged and cased as futureproducers. The net oil pays of the new wells range from 8 to 20 feet. Five ofthe recent wells were drilled on the Graham lease to the north of the original160 acre Vogel lease, demonstrating the extension of the reservoir. No waterzone has been encountered in any of the wells drilled to date. Two wells on the recently acquired acreage to the south of the Vogel leaseindicated the reservoir is present and is thicker than on the Vogel lease. Due to the drilling success on the recently acquired acreage, the originalprogramme of 12 appraisal wells has now been increased to 40 with the objectiveof delineating the extent of the reservoir. Drilling is expected to beconcluded in July 2007. Following the conclusion of the appraisal programme, a pilot production projectof five test wells, including both injectors and producers, will commence in thethird quarter of 2007. The oil in place over the original 160 acres of the project when acquired inMarch 2007 was estimated 3.1 million barrels of oil (gross). Following therecent land acquisition and appraisal drilling on the new acreage, Running Foxesnow estimates the oil in place to be in excess of 10 million barrels of oil(gross). David Racher B.Sc (Hons) Geology, who is a consultant to Nighthawk, has reviewedand approved the technical information contained in this announcement. For information in respect of the waterflood process. please visitwww.nighthawkenergy.net where an animation of the process can be viewed on theVogel Bartlesville page. For further information please contact: Nighthawk Energy plc 01271 882160David Bramhill, Managing Director office@nighthawkenergy.netwww.nighthawkenergy.net Hanson Westhouse Limited 0113 246 2610Tim Feather tim.feather@hansonwesthouse.comMatthew Johnson matthew.johnson@hansonwesthouse.com Bishopsgate Communications Limited 020 7562 3350Dominic Barretto dominic@bishopsgatecommunications.comFran Read fran@bishopsgatecommunications.com Notes for Editors Nighthawk is a hydrocarbon production and development company focused onbuilding a portfolio of assets in the US. Nighthawk floated on AIM in March2007 having raised a total of £10 million. Nighthawk also holds a 37.5 per cent. working interest in the producing CiscoSprings oil and gas project in Grand County,Utah. Running Foxes, a privatelyowned Denver-based company, is the operator and majority owner of the project. At the time of Nighthawk's admission to AIM, Oilfield Production ConsultantsLimited ("OPC"), estimated the following reserves, net to Nighthawk, in theCisco Springs project: P90 P50 P10 Gas (BCF) 74.9 94.2 116.2Oil (MMBBLS) 0.3 0.6 1.1 The Cisco Springs project area presently covers approximately 18,000 acres. Amajor drilling and development programme is in progress with 390 well sitesidentified on the current acreage. Approximately 60 new wells are planned inthe next two years. In addition, Nighthawk holds an 80 per cent. interest in the Devon oil fieldwaterflood project in Kansas. An appraisal and development programme is inprogress to determine the reservoir characteristics in preparation for floodingthe reservoir and production. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
31st Aug 20114:35 pmRNSPrice Monitoring Extension
25th Aug 20114:27 pmRNSChange of Adviser
17th Aug 20114:35 pmRNSPrice Monitoring Extension
12th Aug 20114:40 pmRNSSecond Price Monitoring Extn
12th Aug 20114:35 pmRNSPrice Monitoring Extension
9th Aug 20112:13 pmRNSHolding(s) in Company
4th Aug 20114:40 pmRNSSecond Price Monitoring Extn
4th Aug 20114:35 pmRNSPrice Monitoring Extension
3rd Aug 20117:00 amRNSQ2 Production and Operations Update
27th Jul 20114:36 pmRNSPrice Monitoring Extension
19th Jul 20117:00 amRNSAppointment of Chief Operating Officer
13th Jul 20114:35 pmRNSPrice Monitoring Extension
11th Jul 20114:40 pmRNSSecond Price Monitoring Extn
11th Jul 20114:35 pmRNSPrice Monitoring Extension
6th Jul 20117:00 amRNSChange of Registered Office
4th Jul 20114:35 pmRNSPrice Monitoring Extension
29th Jun 20114:04 pmRNSDirector/PDMR Shareholding
28th Jun 20113:14 pmRNSDirector/PDMR Shareholding
14th Jun 20114:35 pmRNSPrice Monitoring Extension
14th Jun 20119:41 amRNSDirectorate Change
9th Jun 20114:35 pmRNSPrice Monitoring Extension
7th Jun 20114:35 pmRNSPrice Monitoring Extension
2nd Jun 20114:35 pmRNSPrice Monitoring Extension
1st Jun 20117:00 amRNSGrant of Options
26th May 20117:00 amRNSDirector/PDMR Shareholding
18th May 20117:00 amRNSJolly Ranch Q1 2011 Production & Operations Update
9th May 20114:35 pmRNSPrice Monitoring Extension
9th May 20117:00 amRNSAppointment of CFO
28th Apr 20117:00 amRNSJolly Ranch Reserves Report
30th Mar 201111:23 amRNSHolding(s) in Company
29th Mar 20117:00 amRNSHalf Yearly Report
8th Mar 20117:00 amRNSJolly Ranch Operations Update & Drilling Schedule
4th Mar 201111:10 amRNSElectronic Communication with Shareholders
1st Mar 20117:00 amRNSTotal Voting Rights
8th Feb 20117:00 amRNSJolly Ranch Quarterly Production Update
1st Feb 20117:00 amRNSDraw down of funds and issue of equity
24th Jan 20117:00 amRNSJolly Ranch Reservoir Simulation Study
6th Jan 20117:00 amRNSJolly Ranch Operations Update
31st Dec 201012:35 pmRNSPrice Monitoring Extension
30th Dec 20104:40 pmRNSSecond Price Monitoring Extn
30th Dec 20104:35 pmRNSPrice Monitoring Extension
21st Dec 20104:35 pmRNSPrice Monitoring Extension
6th Dec 20104:35 pmRNSPrice Monitoring Extension
3rd Dec 20103:16 pmRNSDirector/PDMR Shareholding
3rd Dec 20102:36 pmRNSTotal Voting Rights
1st Dec 20101:12 pmRNSResult of AGM
29th Nov 20107:00 amRNSStrategic Review
11th Nov 20107:00 amRNSDraw down of funds and issue of equity
20th Oct 20107:00 amRNSFinal Results
14th Oct 20107:00 amRNSGBP25 million Equity Financing Facility

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.