Less Ads, More Data, More Tools Register for FREE

Pin to quick picksGriffin Mining Regulatory News (GFM)

Share Price Information for Griffin Mining (GFM)

Share Price is delayed by 15 minutes
Get Live Data
322.00    -2.00 (-0.62%)
Bid:
322.00
Ask:
324.00
Spread: 2.00 (0.621%)
Market Cap: £568.63m
GFM Live PriceLast checked at - London Stock Exchange

Intraday Griffin Mining Share Chart

Gold Drill Results & Progress

27 Sep 2005 07:00

Griffin Mining Ld27 September 2005 GRIFFIN MINING LIMITED 60 St James's Street, London SW1A 1LE, United Kingdom Telephone: + 44 (0)20 7629 7772 Facsimile: + 44 (0)20 7629 7773 E mail: griffin@griffinmining.com 27th September 2005 UNDERGROUND GOLD DRILLING RESULTS PRACTICAL COMPLETION OF CAIJIAYING MINE AND PROCESSING PLANT PRODUCTION UPGRADE STUDY COMMISSIONED Griffin Mining Limited ("Griffin"or "the Company") is pleased to announce that afurther exciting gold intersection has been obtained from the undergrounddrilling program at its Caijiaying mine in China, and that the Company hascommissioned a study to investigate upgrading production at Caijiaying. Underground Gold Drilling Results The Company is pleased to announce a further high grade intersection in onedrill hole of: 22.7 metres at 8.36 grams per tonne; 3.5 metres at 4.56 grams per tonne: and 3.9 metres at 5.28 grams per tonne. This follows the previous announcement by the Company of significant goldintercepts in one of the underground drill holes of: 8.8 metres at 19.2 grams per tonne; and 6.2 metres at 14.2 grams per tonne. The latest drill hole is located at the southern end of Zone III at Caijiayingsome 210 metres south of the previous intersection mentioned above. Bothintersections occur at a similar level with few drill holes between them.Further infill drilling will be undertaken to define the ore reserves in thisarea of the mine. RC Drilling The reverse circulation ("RC") drilling programme from surface at Caijiaying isprogressing well with approximately 75% of the planned programme completed. Dueto the current lack of capacity in the support services for the mining industry,assay results have been severely delayed with no meaningful results having yetbeen received. The Company will release such results as soon as they becomeavailable. Practical Completion of Caijiaying Mine and Processing Plant The Caijiaying mine and processing plant has now reached practical completionless than 3 months after production began in June of this year. The mine hasbeen consistently producing ore in excess of the required rate of 3,850 tonnesper week in the past month. The process plant has now been fully commissionedfor zinc production and has achieved its design specification level with respectto the recovery rate (92%) and initial production of 45.4 tonnes per day. Thefeasibility study head grade of over 10% zinc is now being fed into the mill. Asat the end of August over 50,000 tonnes of ore have been accumulated at surfacein stockpiles ready for processing. With the zinc circuit fully operational, thegold circuit is now being prepared for commissioning. Production Upgrade Study Commissioned With the exceptional mining and production results obtained to date, the Companyhas commissioned the relevant studies with a view to upgrading production atCaijiaying by the summer of next year. Griffin Mining Chairman Mladen Ninkov commented: "Caijiaying continues to provide ample evidence that the long term view held bythe Company that Caijiaying will develop into a long term, highly profitable,world class ore body and mining operation is valid and continues to strengthenwith each passing day. This is a continuing just reward for the loyalshareholders of the Company." Further information Mladen Ninkov - Chairman Telephone: +44(0)20 7629 7772Roger Goodwin - Finance DirectorGriffin Mining Limited Andrew Smith/Martin Eales Telephone:+44(0)20 7523 8350Collins Stewart Limited Hugo de Salis Telephone: +44(0) 20 7242 4477St Brides Media & Finance Ltd Griffin Mining Limited's shares are quoted on the Alternative Investment Market (AIM) of the London Stock Exchange (symbol GFM). The Company's news releases are available on the Company's web site: www.griffinmining.com This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
3rd Jun 20267:00 amRNSSHARE BUY BACK PROGRAMME
28th May 20267:00 amRNSANNUAL GENERAL MEETING
12th May 20267:00 amRNS2025 FINAL RESULTS
21st Apr 20267:00 amRNSZone II Production Commenced
14th Apr 20269:43 amRNSStandard form for notification of major holdings
10th Mar 20267:00 amRNSCaijiaying Mine Achieves 100% Renewable Energy Use
18th Feb 20267:00 amRNSCorrection To: Announcement of 12th February 2026
12th Feb 20267:00 amRNSDrilling/Production Report
19th Jan 20267:00 amRNSRenewal of Caijiaying Mining Licence to 2054
3rd Dec 20259:03 amRNSCaijiaying Zone II Update
2nd Dec 20253:13 pmRNSHolding(s) in Company
12th Nov 20257:00 amRNSTransaction in Own Shares
10th Nov 20257:00 amRNSSHARE DEALINGS
7th Nov 20257:00 amRNSTransaction in Own Shares
6th Nov 20257:00 amRNSTransaction in Own Shares
5th Nov 20257:00 amRNSTransaction in Own Shares
10th Oct 20254:25 pmRNSShare Dealings
10th Oct 202510:16 amRNSSHARE DEALINGS
23rd Sep 20259:45 amRNSAmendment - Result of Share Buyback
23rd Sep 20257:00 amRNSResult of Share Buyback
22nd Sep 20257:00 amRNSShare Buyback via Reverse Accelerated Bookbuild
19th Sep 20254:30 pmRNSShare Buyback via Reverse Accelerated Bookbuild
18th Sep 20257:00 amRNSTemporary Reduction in Throughput
15th Sep 20255:50 pmRNSStandard form for notification of major holdings
9th Sep 20257:00 amRNSUNAUDITED INTERIM RESULTS
28th Jul 20257:00 amRNSRECEIPT OF $30 MILLION OF DIVIDENDS FROM CHINA
25th Jul 20257:00 amRNSTransaction in Own Shares
22nd Jul 20257:00 amRNSTransaction in Own Shares
10th Jul 20257:00 amRNSRECORD GOLD & SILVER PRODUCTION
3rd Jul 20257:00 amRNSResult of AGM
25th Jun 20257:00 amRNSTransaction in Own Shares
18th Jun 20257:00 amRNSSHARE BUY BACK PROGRAMME
12th Jun 20257:00 amRNSANNUAL GENERAL MEETING
5th Jun 20257:00 amRNS2024 Final Results
17th Apr 20257:00 amRNSFIRST QUARTER PRODUCTION 2025
15th Apr 20259:04 amRNSEXCEPTIONAL GOLD MINERALIZATION AT CAIJIAYING MINE
25th Mar 20255:20 pmRNSStandard form for notification of major holdings
13th Feb 20253:11 pmRNSHolding(s) in Company
31st Jan 20257:00 amRNSDISRUPTED LAST QUARTER & FULL YEAR PRODUCTION 2024
20th Jan 20257:00 amRNSRENEWABLE ENERGY
2nd Jan 20257:00 amRNSRECOMMENCEMENT OF OPERATIONS AT CAIJIAYING MINE
31st Dec 20247:00 amRNSCANCELLATION AND ISSUE OF NEW SHARES
8th Nov 20247:00 amRNSTransaction in Own Shares
6th Nov 20247:00 amRNSCHANGE OF AUDITORS
4th Nov 20247:00 amRNSTransaction in Own Shares
30th Oct 20247:00 amRNSRE-INSTITUTION OF SHARE BUY-BACK PROGRAMME
25th Oct 20247:00 amRNSTHIRD QUARTER PRODUCTION RESULTS
14th Oct 20247:00 amRNSMining Contractor Fatality at Caijiaying Mine
12th Sep 20247:00 amRNSUNAUDITED INTERIM RESULTS
7th Aug 20242:13 pmRNSUpdate to Share Buy Back Programme

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.