Talon Resources Targets Ontario Gold Growth After AIM Move and Eagle Lake Acquisition, CEO Says. Watch here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksGriffin Mining Regulatory News (GFM)

Share Price Information for Griffin Mining (GFM)

Share Price is delayed by 15 minutes
Get Live Data
317.00    6.00 (1.93%)
Bid:
316.00
Ask:
325.00
Spread: 9.00 (2.848%)
Market Cap: £559.80m
GFM Live PriceLast checked at - London Stock Exchange

Intraday Griffin Mining Share Chart

Gold Drill Results & Progress

27 Sep 2005 07:00

Griffin Mining Ld27 September 2005 GRIFFIN MINING LIMITED 60 St James's Street, London SW1A 1LE, United Kingdom Telephone: + 44 (0)20 7629 7772 Facsimile: + 44 (0)20 7629 7773 E mail: griffin@griffinmining.com 27th September 2005 UNDERGROUND GOLD DRILLING RESULTS PRACTICAL COMPLETION OF CAIJIAYING MINE AND PROCESSING PLANT PRODUCTION UPGRADE STUDY COMMISSIONED Griffin Mining Limited ("Griffin"or "the Company") is pleased to announce that afurther exciting gold intersection has been obtained from the undergrounddrilling program at its Caijiaying mine in China, and that the Company hascommissioned a study to investigate upgrading production at Caijiaying. Underground Gold Drilling Results The Company is pleased to announce a further high grade intersection in onedrill hole of: 22.7 metres at 8.36 grams per tonne; 3.5 metres at 4.56 grams per tonne: and 3.9 metres at 5.28 grams per tonne. This follows the previous announcement by the Company of significant goldintercepts in one of the underground drill holes of: 8.8 metres at 19.2 grams per tonne; and 6.2 metres at 14.2 grams per tonne. The latest drill hole is located at the southern end of Zone III at Caijiayingsome 210 metres south of the previous intersection mentioned above. Bothintersections occur at a similar level with few drill holes between them.Further infill drilling will be undertaken to define the ore reserves in thisarea of the mine. RC Drilling The reverse circulation ("RC") drilling programme from surface at Caijiaying isprogressing well with approximately 75% of the planned programme completed. Dueto the current lack of capacity in the support services for the mining industry,assay results have been severely delayed with no meaningful results having yetbeen received. The Company will release such results as soon as they becomeavailable. Practical Completion of Caijiaying Mine and Processing Plant The Caijiaying mine and processing plant has now reached practical completionless than 3 months after production began in June of this year. The mine hasbeen consistently producing ore in excess of the required rate of 3,850 tonnesper week in the past month. The process plant has now been fully commissionedfor zinc production and has achieved its design specification level with respectto the recovery rate (92%) and initial production of 45.4 tonnes per day. Thefeasibility study head grade of over 10% zinc is now being fed into the mill. Asat the end of August over 50,000 tonnes of ore have been accumulated at surfacein stockpiles ready for processing. With the zinc circuit fully operational, thegold circuit is now being prepared for commissioning. Production Upgrade Study Commissioned With the exceptional mining and production results obtained to date, the Companyhas commissioned the relevant studies with a view to upgrading production atCaijiaying by the summer of next year. Griffin Mining Chairman Mladen Ninkov commented: "Caijiaying continues to provide ample evidence that the long term view held bythe Company that Caijiaying will develop into a long term, highly profitable,world class ore body and mining operation is valid and continues to strengthenwith each passing day. This is a continuing just reward for the loyalshareholders of the Company." Further information Mladen Ninkov - Chairman Telephone: +44(0)20 7629 7772Roger Goodwin - Finance DirectorGriffin Mining Limited Andrew Smith/Martin Eales Telephone:+44(0)20 7523 8350Collins Stewart Limited Hugo de Salis Telephone: +44(0) 20 7242 4477St Brides Media & Finance Ltd Griffin Mining Limited's shares are quoted on the Alternative Investment Market (AIM) of the London Stock Exchange (symbol GFM). The Company's news releases are available on the Company's web site: www.griffinmining.com This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
15th Dec 20237:00 amRNSCONFINEMENT OF JOINT VENTURE DIRECTOR
5th Dec 20237:00 amRNSTransaction in Own Shares
30th Nov 20237:00 amRNSTransaction in Own Shares
29th Nov 202312:05 pmRNSRECEIPT OF FURTHER DIVIDENDS FROM CHINA
21st Nov 20237:00 amRNSTransaction in Own Shares
20th Nov 20238:22 amRNSTransaction in Own Shares
16th Nov 20237:00 amRNSTransaction in Own Shares
14th Nov 20238:51 amRNSTransaction in Own Shares
8th Nov 20237:00 amRNSTransaction in Own Shares
31st Oct 20237:00 amRNSTransaction in Own Shares
26th Oct 20237:00 amRNSTransaction in Own Shares
23rd Oct 20239:57 amRNSTransaction in Own Shares
12th Oct 20237:00 amRNS3rd Quarter Results
11th Oct 20237:00 amRNSTransaction in Own Shares
10th Oct 20237:00 amRNSCommissioning of Solar Farm at the Caijiaying Mine
6th Oct 20237:00 amRNSTransaction in Own Shares
5th Oct 20237:00 amRNSTransaction in Own Shares
28th Sep 20237:00 amRNSTransaction in Own Shares
27th Sep 20237:00 amRNSTransaction in Own Shares
22nd Sep 20239:59 amRNSUPDATE TO SHARE BUY-BACK PROGRAMME
20th Sep 20237:00 amRNSTransaction in Own Shares
12th Sep 20237:00 amRNSUNAUDITED INTERIM RESULTS
20th Jul 202310:22 amRNSTransaction in Shares 20 JULY 2023
13th Jul 20237:00 amRNSTrading Statement 13th July
10th Jul 20237:00 amRNSResult of AGM
22nd Jun 20232:00 pmRNSNotice of AGM
9th May 20237:00 amRNS2022 Final Results
17th Apr 20237:00 amRNSFIRST QUARTER PRODUCTION
30th Mar 202310:25 amRNSREPLACEMENT ISSUE OF SHARES
29th Mar 202312:40 pmRNSISSUE OF SHARES
6th Mar 20237:00 amRNSAPPROVAL OF CAIJIAYING ZONE II MINE PLAN
31st Jan 20237:00 amRNSCAPITAL SHARE STRUCTURE RATIONALIZATION
13th Jan 20237:00 amRNSFOURTH QUARTER & FULL YEAR PRODUCTION NUMBERS 2022
30th Dec 20227:00 amRNSCAPITAL SHARE STRUCTURE RATIONALIZATION PROGRAM
18th Nov 20227:00 amRNS4TH QUARTER OPERATIONAL GUIDANCE
4th Nov 20227:00 amRNSRECOMMENCEMENT OF OPERATIONS
24th Oct 20227:00 amRNSRecommencement of Caijiaying Mine Operations
20th Sep 20227:00 amRNSCESSATION OF EXPLOSIVES PRODUCTION & DELIVERY
24th Aug 202212:09 pmRNSRECEIPT OF DIVIDENDS FROM CHINA
16th Aug 20227:00 amRNSUnaudited Interim Results
15th Jul 20223:29 pmRNSRESULTS OF ANNUAL GENERAL MEETING
7th Jul 20228:36 amRNSREPLACEMENT RECORD SECOND QUARTER PRODUCTION
7th Jul 20227:00 amRNSRECORD SECOND QUARTER PRODUCTION
17th Jun 20227:00 amRNSANNUAL GENERAL MEETING
13th May 20227:00 amRNS2021 FINAL RESULTS
5th May 20224:10 pmRNSANNUAL GENERAL MEETING
19th Apr 20227:00 amRNSFirst Quarter Production
11th Apr 20227:00 amRNSAnnual General Meeting
1st Apr 20221:36 pmRNSAGM & PROPOSED CHANGE OF DIRECTORS
18th Mar 20227:00 amRNSSTART OF CAIJIAYING MINE OPERATIONS

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.