Less Ads, More Data, More Tools Register for FREE

Pin to quick picksFresnillo Regulatory News (FRES)

Share Price Information for Fresnillo (FRES)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 628.00
Bid: 625.00
Ask: 626.00
Change: 2.00 (0.32%)
Spread: 1.00 (0.16%)
Open: 615.50
High: 631.00
Low: 614.50
Prev. Close: 626.00
FRES Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Results of AMC Prefeasibility Study on Juanicipio

14 Jun 2012 15:01

RNS Number : 3975F
Fresnillo PLC
14 June 2012
 



 

 

 

 

Fresnillo Plc

28 Grosvenor Street

London W1K 4QR

United Kingdom

www.fresnilloplc.com

 

Fresnillo PLC Reports Results of AMC Prefeasibility Study on Juanicipio Property

 

Highlights

·; The Prefeasibility Study has been completed in respect of Juanicipio property

·; The study anticipates a 15 year mine life with an average annual payable production of approximately 10,3 million ounces of silver and 29,200 ounces of gold.

·; Cash cost of US$6.61 per ounce of silver equivalent and US$-0.03 per silver ounce, net of by-product credits.  

·; After-tax NPV of US$1.2 billion at a 5% discount rate and US$23.39 per ounce silver price. 

·; The study was prepared on the basis that the project will be developed on a standalone basis

 

Fresnillo PLC today reports the results of a prefeasibility study received by Minera Juanicipio S.A. de C.V., its 56% owned joint venture with MAG Silver Corp. (44%) (TSX: MAG and NYSE: MVG), in respect of the Juanicipio property located in the Fresnillo District, Zacatecas State, Mexico.

 

 

The study was completed by AMC Mining Consultants (Canada) Ltd. and is based on an assumed initial processing capacity of approximately 850,000 tonnes per annum, (ramping up to a maximum rate of 950,000 tonnes per annum), at the stand-alone project. The AMC study recommends long-hole open stoping and cemented paste backfill as the primary mining method, with processing consisting of a comminution circuit followed by the sequential flotation of a lead -silver concentrate, and zinc concentrate and pyrite (gold) concentrate.

 

 

The study anticipates three and a half years of pre-production development from the start of construction to mill start-up, followed by a mine life of approximately 15 years with average annual payable production of approximately 10.3 million ounces of silver, 29.2 thousand ounces of gold, 11.2 thousand tonnes of lead and 18.2 thousand tonnes of zinc in concentrates at a cash cost of US$6.61 per ounce of silver equivalent.

 

 

The after-tax net present value would be US$1.2 billion at a 5% discount rate , according to the AMC study. The after-tax net present value does not take into account the cost of the mandatory profit sharing to employees (MPSE) under Mexican Federal Labor Law, which Fresnillo complies with at its Mexican operations. The MPSE is required to be paid at a rate equivalent to 10% over income subject to profit sharing (taxable income adjusted for certain items). MPSE is deductible for income tax purposes.

 

 

 

 

 

 

 

Summary of Assumptions and Economic Analysis(1,2)

(All amounts in US$ unless otherwise indicated)

 

Item

Unit

Base Case

Item

Unit

Base Case

Initial Throughput

tpa

850,000

Mining Costs

$/t milled

$43.92

Silver Grade

g/t

416

Milling Costs

$/t milled

$19.18

Gold Grade

g/t

1.3

Unit G&A Costs

$/t milled

$3.46

Lead Grade

%

1.4%

Cash Cost

$/oz AgEq

$6.61

Zinc Grade

%

2.7%

Initial Capital

$ mm

$302

LOM Payable Silver

moz

153

Sustain. Capital

$ mm

$267

LOM Payable Gold

koz

430

NPV (After-tax)

$ mm

$1,233

LOM Payable Lead

mlbs

361

IRR (After-tax)

%

43%

LOM Payable Zinc

mlbs

584

Payback (Pre-tax)

Years

3

Corporate Tax

%

28%

 

 

(1) The AMC Base Case utilizes a discount rate of 5% and three year trailing average metal prices for silver ($23.39 per ounce), gold ($1,257 per ounce), lead ($0.95 per pound) and Zinc ($0.91 per pound) to December 31, 2011.
(2) Source: AMC Mining Consultants (Canada) Ltd.

 

 

AMC was engaged by Minera Juanicipio in July 2010 to prepare the prefeasibility study. The scope of the AMC study includes, among other things: the resource estimate and model developed by Strathcona Mineral Services dated November 2011; a geotechnical assessment and mining options study; a detailed mine design with detailed schedules based on chosen mining methods; a metallurgical and processing review; a capital and operating cost estimate; and an economic assessment and sensitivity analysis of cash flows, pay back, mine life, NPV and IRR.

 

While the results of the AMC study are promising, as anticipated by us, it constitutes a preliminary study that, by definition, is preliminary in nature and, among other things, includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. The estimates produced in the study have a level of accuracy in the order of +/- 25%. There can therefore be no certainty that the results reflected in the AMC Study will be realised. It is also important to note that mineral resources that are not mineral reserves do not have demonstrated economic viability.

 

Fresnillo intends to complete a full review of the study and the recommendations made by AMC. The Technical Committee of the Joint Venture, which comprises Fresnillo and MAG Silver representatives, will then discuss and evaluate the implications of the AMC study and recommend to the Board the appropriate next steps. As Fresnillo has previously said, the AMC study was prepared on the basis that the Juanicipio project will be developed on a standalone basis. There are no plans to integrate the project with any of Fresnillo's properties in the area.

 

 

 

For further information, please visit our website: www.fresnilloplc.com or contact:

 

 

Fresnillo plc

London Office Tel: +44 (0)20 7399 2470

Arturo Espínola, Head of Investor Relations

 

Mexico City Office

Gabriela Mayor Tel: +52 55 52 79 3203

 

Brunswick Group Tel: +44 (0)20 7404 5959

Carole Cable

David Litterick

 

About Fresnillo plc

 

Fresnillo is the world's largest primary silver producer and Mexico's second largest gold producer, listed on the London and Mexican Stock Exchanges under the symbol FRES. Fresnillo has seven operating mines, all of them in Mexico - Fresnillo, Saucito, Cienega, San Ramón (a satellite of the Ciénega gold mine),Herradura, Soledad-Dipolos and Noche Buena (new gold mine at Herradura District);two development projects - Saucito II, and Dynamic leaching to treat high grade gold ore from Herraduraand Soledad-Dipolos mine; and five advanced exploration prospects - San Julián, Centauro Deep, Juanicipio, Orysivo and Las Casas as well as a number of other long term exploration prospects. In total, has mining concessions covering approximately 2.1 million hectares in Mexico. Fresnillo has a strong and long tradition in mining, a proven track record of exploration success, reserve replacement, mine development, efficient mine operations with productioncosts in the lowest quartile of the cost curve for both silver and gold. 

 

Fresnillo's goal is to maintain the Group's position as the world'slargest primary silver company, producing 65 million ounces of silver and 500,000 ounces of gold by 2018.

 

This announcement contains forward looking statements. All statements, other than statements of historical fact are forward looking statements. By their nature, forward looking statements involve risks and uncertainties because they relate to events and depend on circumstances that will or may occur in the future. Actual results, performance or achievements may, for various reasons, be materially different from any future results, performance or achievements expressed or implied by such forward looking statements. A number of factors could cause results, performance or achievements to differ materially from those expressed or implied by the forward looking statements including, without limitation, general economic and business conditions, industry trends, competition, commodity prices, changes in regulation and currency fluctuations.

The forward looking statements reflect knowledge and information available at the date of preparation of this announcement. Except as required by the UK Listing Rules and applicable law, the Board of Fresnillo plc does not undertake any obligation to update or change any forward looking statements to reflect events occurring after the date of this announcement.

 

 

 

 

THIS PRESS RELEASE REFERS TO THE STUDY COMPLETED BY AMC MINING CONSULTANTS (CANADA) INC. (THE "AMC STUDY") AS A "PREFEASIBILITY STUDY". THE AMC STUDY CONSTITUTES A PREFEASIBILITY STUDY FOR PURPOSES OF FRESNILLO PLC and MINERA JUANICIPIO S.A. de C.V., ALTHOUGH FRESNILLO UNDERSTANDS THAT IT DOES NOT CONSTITUTE A PREFEASIBILITY STUDY FOR CANADIAN PURPOSES UNDER NATIONAL INSTRUMENT 43-101 - STANDARDS OF DISCLOSURE FOR MINERAL PROJECTS.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCBKQDNNBKDNAD
Date   Source Headline
3rd May 201712:37 pmRNSConversion Rate for 2016 Final Dividend
26th Apr 20177:00 amRNS1Q17 Production Report
21st Apr 20174:26 pmRNSAnnual Financial Report and AGM Notice
11th Apr 201711:24 amRNSAppointment of Independent Non-executive Director
3rd Apr 201710:23 amRNSTr-1: Notification of major interest in shares
21st Mar 201711:33 amRNSTr-1: Notification of major interest in shares
14th Mar 20172:04 pmRNSTr-1: Notification of major interest in shares
13th Mar 201712:16 pmRNSTr-1: Notification of major interest in shares
28th Feb 20177:00 amRNSFull Year 2016 Preliminary Results
25th Jan 20177:00 amRNS4Q16 Production Report
12th Oct 20167:00 amRNSProduction report for the 3 months ended 30 Sep 16
1st Sep 20167:00 amRNSHolding(s) in Company
18th Aug 20167:00 amRNSRestart of leaching plant at San Julián
16th Aug 20169:12 amRNSConversion rate for 2016 Interim Dividend
10th Aug 20168:04 amRNSResignation of Non-Executive Director
4th Aug 20163:39 pmRNSHolding(s) in Company
2nd Aug 20167:00 amRNSInterim results for the six months to 30 June 2016
21st Jul 20163:35 pmRNSHolding(s) in Company
20th Jul 20167:00 amRNSProduction Report for the 3 months ended 30 Jun 16
1st Jul 20164:28 pmRNSUpdate on San Julián
15th Jun 20168:00 amRNSReport on Payments to Governments
10th May 20167:00 amRNSConference Presentation
4th May 20167:00 amRNSResult of AGM
3rd May 20167:00 amRNSAnnual General Meeting Statement
27th Apr 20167:00 amRNSBoard Change
26th Apr 201610:27 amRNSConversion Rate for Final Dividend
21st Apr 20164:26 pmRNSBoard Changes
13th Apr 20167:00 amRNSProduction Report for the 3 months ended 31 Mar 16
8th Apr 20168:27 amRNSResignation of Non-Executive Director
1st Apr 201611:53 amRNSAnnual Financial Report & AGM Notice
1st Mar 20167:00 amRNSFinancial Results for the Year Ended 31 Dec 2015
26th Feb 20167:00 amRNSBoard Change
20th Jan 20167:00 amRNSProduction Report for the 3 months ended 31 Dec 15
9th Dec 20153:06 pmRNSIncident at the Saucito mine
4th Dec 201510:15 amRNSHolding(s) in Company
14th Oct 20156:25 pmRNSHolding(s) in Company
14th Oct 20157:00 amRNSProduction Report for the 3 months ended 30 Sep 15
18th Aug 201511:19 amRNSConversion Rate for Interim Dividend
4th Aug 20157:00 amRNSInterim Results for the six months to 30 June 2015
22nd Jul 20157:00 amRNSProduction Report for the 3 months ended 30 Jun 15
18th May 20155:16 pmRNSResult of AGM
18th May 201511:11 amRNSEurope midday: Stocks waver in a tight range; eyes still on Greece
18th May 20159:04 amBUSMarket overview: FTSE 100 finishes up just 0.1%
18th May 20157:00 amRNSAnnual General Meeting Statement
6th May 201510:43 amRNSConversion Rate for Final Dividend
15th Apr 20156:26 pmRNSNotice of AGM
15th Apr 20157:00 amRNSProduction Report for the 3 months ended 31 Mar 15
4th Mar 20157:13 amRNSFinancial Results for the Year Ended Dec 2014
13th Feb 20157:00 amRNSUpdate on Trading
28th Jan 20157:00 amRNSProduction Report for the 3 months ended 31 Dec 14

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.