focusIR May 2024 Investor Webinar: Blue Whale, Kavango, Taseko Mines & CQS Natural Resources. Catch up with the webinar here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEurasia Mining Regulatory News (EUA)

Share Price Information for Eurasia Mining (EUA)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.475
Bid: 1.45
Ask: 1.50
Change: 0.00 (0.00%)
Spread: 0.05 (3.448%)
Open: 1.475
High: 1.475
Low: 1.475
Prev. Close: 1.475
EUA Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Mining Update From West Kytlim

10 May 2018 07:00

RNS Number : 5801N
Eurasia Mining PLC
10 May 2018
 

Eurasia Mining plc (AIM: EUA)

("Eurasia" or the "Company")

Mining update from West Kytlim

 

Eurasia, the PGM and gold production company is pleased to provide an update from its West Kytlim Mine, the second largest alluvial platinum mine in the world, which is now fully operational for the 2018 mining season. Following a general thaw at the start of May the operation has now achieved several successive days at near full capacity, with all machinery now operating to specification and as planned. Grades in platinum bearing gravels are considerably higher than had been expected and as a result initial production figures are also increased.

OVERVIEW:

· West Kytlim Mine is approaching capacity of circa 2,000m3 per day, water is now free flowing and all equipment functioning according to specification;

· No unauthorised or unplanned stoppages reported since an initial trial of the equipment on 3rd May 2018;

· Initial trial reports grades approaching 1g/m3;

· A total of 4.6 kg of raw platinum was produced from 3rd May to 9th May inclusive with 1.3kg produced on the 9th May. The 1.3kg produced in a day represents what the directors believe could be possible with this process in the future;

· Mining, washing of platinum bearing gravels and upgrade of concentrate has been continuous every day from 3rd May to date.

Christian Schaffalitzky, Executive Chairman commented: "We are very pleased at the level of professionalism and experience shown by the newly appointed contractor, Techstroy, in the opening weeks of this year's mining season. The Directors believe that the 4.6kg produced over the first 6 days is remarkable considering the total production of just 6kg by our previous contractor in the 2017 mining season. Grades seem to be consistently and considerably higher than we had calculated, and the machinery operating very efficiently in terms of costs, ore volumes and precious metal recovery. We may look forward to more continuous production updates from site in the coming mining season."

 

HIGHLIGHTS:

An initial 'first fill' test was completed successfully at the West Kytlim alluvial platinum and gold mine on 3rd May 2018. 500m3 of gravels were processed to test the new scrubber/tromell arrangement. The concentrate produced was collected and upgraded at the on-site laboratory. This first sample returned 428g raw platinum, for an average grade approaching 1g per m3.

Several successive days of continuous production have followed, the largest amount produced in a single day being 1.3kg raw platinum on 9th May 2018.

Shipments to the refinery in Ekaterinburg are expected to commence by contracted security professionals on 11th May 2018 and further updates will be provided in due course, as appropriate.

A site visit by Eurasia's auditor Grant Thornton UK was carried out on 7th and 8th of May. The site visit is a necessary element in Eurasia's audit process and ensures best industry practices in health and safety, mine site security and corporate and social responsibility.

Mining at 2,000m3 per day is expected to continue for the foreseeable future until either (i) the end of the mining season in early November 2018 or (ii) when the platinum and gold bearing reserves at Malaya Sosnovka are expired. When the latter occurs mining is anticipated to progress to the much larger Kluchiki area. Eurasia's contractor (Techstroy) holds in reserve a further trommel/scrubber which can be mobilised to site as required. The next fully permitted site, containing 893,000m3 of gravels, is the Kluchiki site which may, at the contractor's discretion, be developed during this year by mobilising a second washplant, with both sites operating concurrently. Further updates regarding the 2018 mine plan for the West Kytlim Project will be provided in due course.

A video blog is to be filmed on site in the week commencing 14th May and broadcast soon thereafter. A mine plan for the Malaya Sosnovka area currently being worked has been uploaded to the Eurasia website and can be viewed at https://www.eurasiamining.co.uk/operations/west-kytlim.

 

Consent for release

Christian Schaffalitzky, FIMMM, PGeo, CEng, is a director of the Company. He has reviewed the update and consents to the inclusion of the exploration information in the form and context in which it appears here. He is a Competent Person for the purposes of the reporting of these results.

This announcement includes inside information as defined in Article 7 of the Market Abuse Regulation No. 596/2014 and is disclosed in accordance with the Company's obligations under Article 17 of those Regulations.

 

 

Enquiries:

Eurasia Mining Plc

Christian Schaffalitzky/Keith Byrne

+44 (0)207 932 0418

 

WH Ireland Limited

Katy Mitchell/James Sinclair-Ford

+44 (0)161 832 2174

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLUGUMUAUPRGMB
Date   Source Headline
22nd Mar 20249:26 amRNSReplacement of Queeld & Mispare share certificates
6th Mar 20247:55 amRNSUpdate re Queeld & Mispare share certificates
11th Jan 202410:19 amRNSSupreme Court Tax Litigation Win
14th Dec 20237:00 amRNSLegal Matters - Update
7th Dec 20237:00 amRNSCorporate Update
15th Nov 202312:51 pmRNSReplacement of Queeld & Mispare share certificates
3rd Nov 20234:47 pmRNSResponse to speculation
3rd Nov 20237:05 amRNSExercise of Options
19th Sep 20237:00 amRNSInterim Results for the six months ended 30 June
26th Jul 20233:16 pmRNSResult of AGM
3rd Jul 20237:00 amRNSApproval of DFS and management changes
3rd Jul 20237:00 amRNSAnnual Results and Notice of AGM
10th May 202311:30 amRNSResponse to media comment
2nd May 202311:32 amRNSExtension of Company Options
11th Apr 202311:00 amRNSCorporate and Operational Update
6th Mar 20234:35 pmRNSPrice Monitoring Extension
2nd Feb 202310:02 amRNSExercise of Options
24th Jan 20232:24 pmRNSUpdate with respect to the Rosgeo Agreement
21st Dec 202210:05 amRNSCorporate Update
24th Nov 20224:41 pmRNSSecond Price Monitoring Extn
24th Nov 20224:35 pmRNSPrice Monitoring Extension
4th Nov 20222:06 pmRNSSecond Price Monitoring Extn
4th Nov 20222:00 pmRNSPrice Monitoring Extension
2nd Nov 20222:41 pmRNSExtension of Company Options
30th Sep 20227:00 amRNSInterim Results for the six months ended 30 June
21st Sep 202211:06 amRNSSecond Price Monitoring Extn
21st Sep 202211:00 amRNSPrice Monitoring Extension
14th Sep 20224:36 pmRNSPrice Monitoring Extension
14th Sep 20222:06 pmRNSSecond Price Monitoring Extn
14th Sep 20222:00 pmRNSPrice Monitoring Extension
9th Aug 20224:41 pmRNSSecond Price Monitoring Extn
9th Aug 20224:35 pmRNSPrice Monitoring Extension
8th Aug 20224:41 pmRNSSecond Price Monitoring Extn
8th Aug 20224:36 pmRNSPrice Monitoring Extension
28th Jul 20223:12 pmRNSResult of AGM
12th Jul 20229:00 amRNSPrice Monitoring Extension
7th Jul 20224:41 pmRNSSecond Price Monitoring Extn
7th Jul 20224:35 pmRNSPrice Monitoring Extension
7th Jul 20229:05 amRNSSecond Price Monitoring Extn
7th Jul 20229:00 amRNSPrice Monitoring Extension
6th Jul 20224:40 pmRNSSecond Price Monitoring Extn
6th Jul 20224:35 pmRNSPrice Monitoring Extension
30th Jun 202211:00 amRNSPrice Monitoring Extension
29th Jun 20227:00 amRNSAnnual Results and Notice of AGM
7th Jun 20227:00 amRNSAnnual audited accounts and AGM timing
31st May 20224:41 pmRNSSecond Price Monitoring Extn
31st May 20224:35 pmRNSPrice Monitoring Extension
18th May 20227:30 amRNSRestoration - Eurasia Mining Plc
18th May 20227:00 amRNSNew Director Appointed
17th May 20226:18 pmRNSRestoration of Trading

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.