Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpyrean Regulatory News (EME)

Share Price Information for Empyrean (EME)

Share Price is delayed by 15 minutes
Get Live Data
0.0575    0.00 (0.00%)
Bid:
0.055
Ask:
0.06
Spread: 0.005 (9.091%)
Market Cap: £3.29m
EME Live PriceLast checked at - London Stock Exchange

Intraday Empyrean Share Chart

Trading Statement

27 May 2008 07:00

RNS Number : 2704V
Empyrean Energy PLC
27 May 2008
 

Empyrean Energy PLC 

("Empyrean" or the "Company"; Ticker: (EME))

Sugarloaf Prospect, ("Sugarloaf"), Block B,  Texas USA

 

 

Kennedy #1 well flows gas and condensate from a new pay zone

New pay zone is 120 feet thick versus 80 feet thick upper zone already producing from two wells in Block A

This test alone could more than double the potential recoverable reserves from the project

 

Empyrean, the AIM listed oil and gas explorer and producer with assets in Germany and USA today announces the following:

Kennedy #1 Well 

Empyrean has been advised by Texas Crude Energy Incorporated ("TCEI"), the operator of Block B on the Sugarkane Gas and Condensate field, that production tubing has been successfully installed in Kennedy #1 and the well has been flowed and placed back on well test. The reservoir stimulation program on the Kennedy #1 well commenced on 14 May, 2008 with the hydraulic fracture stimulation ("frac") of an approximate 600 ft zone at the end of the horizontal section of the well via four sets of perforations.

As at 0600hrs (US CST) on the 25th May 2008 the well had produced a total of 1,274 bbls of fracture fluids, 257 bbls of condensate and is continuing to produce small quantities of gas and condensate. With the production tubing now in place there are several options available to accelerate the recovery of fracture fluid and the potential for additional fracture stimulation along the horizontal section of the well will also be considered. 

Commenting today, Empyrean Executive Director Tom Kelly said "This is very encouraging news for the project as a whole because we now may have approximately 150% larger potential recoverable volumes when you add this new "middle pay zone" to the "upper pay zonethat we had already proven commercial from the testing of the Block A wells. Significantly, this test at Kennedy was a relatively small fracture stimulation conducted over a relatively small horizontal section of the well and we would expect that much better flow rates can be achieved using knowledge gained from these early wells. The completion technique used on this most recent test should measurably improve the production rates for the third potential pay zone, a lower zone some 50 feet thick, which was initially tested by the Sugarloaf-1 vertical well."

Further releases will be made as appropriate.

The information contained in this announcement was completed and reviewed by the Technical Director of Empyrean Energy Plc, Mr Frank Brophy BSc (Hons) who has over 40 years experience as a petroleum geologist.

For further information: 

 

Empyrean Energy plc 

Tel: +44(0) 207 182 1746 

 

Rod Venables / Cecil Jordaan 

HB Corporate 

Tel: +44(0) 207 510 8600 

 

Jonathan Charles / Ed Portman 

Conduit PR 

Tel: +44 (0) 207 429 6611 / +44 (0) 7791 892 509 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLGUGDUCSDGGIR
Date   Source Headline
9th Apr 20107:00 amRNSPlacing to raise ?1.5m
1st Apr 20101:03 pmRNSSugarloaf Project Block B Update
1st Apr 20107:35 amRNSConvertible Loan Facility
30th Mar 20107:40 amRNSRiverbend Project Quinn-3H Well Update
26th Mar 20107:37 amRNSHercules Prospect Update
25th Mar 20107:39 amRNSSugarloaf Project Block B Update
17th Mar 20107:42 amRNSAquarius Prospect, McMillan Well Update
17th Mar 20107:38 amRNSSugarloaf Project Block B Update
16th Mar 20102:33 pmRNSExercise of Options and Director Shareholdings
9th Mar 20107:41 amRNSBP America well reaches total depth on Hercules
9th Mar 20107:38 amRNSMcMillan Well spuds on the Aquarius Prospect
3rd Mar 20107:38 amRNSSugarloaf Project, Block B Update
24th Feb 20107:36 amRNSSugarloaf Project, Block B Update
23rd Feb 20107:42 amRNSHercules Prospect Update
19th Feb 20107:37 amRNSSugarloaf Project, Block B, Update
5th Feb 20108:08 amRNSSugarloaf Project Block B Update
4th Feb 20107:52 amRNSRiverbend Project, onshore Texas, USA
1st Feb 20107:38 amRNSSugarloaf Project Update
28th Jan 20107:34 amRNSSugarloaf Project Update
22nd Jan 20107:41 amRNSSugarloaf Project Update
15th Jan 20107:21 amRNSSugarloaf Project, Block B, Update
13th Jan 20109:00 amRNSRiverbend Project, onshore Texas, USA
7th Jan 20108:05 amRNSKowalik-1H update and new well preparations
30th Dec 20097:00 amRNSKowalik-1H Fracture Stimulation Program
23rd Dec 20098:23 amRNSSugarloaf Project, Block B, Texas USA
15th Dec 20097:39 amRNSParticipation in 10% of Aquarius Prject, Texas
10th Dec 20097:41 amRNSParticipation in 10% of Hercules Prospect, Texas
4th Dec 20093:21 pmRNSInterim Results
19th Nov 20097:00 amRNSSugarloaf Block B Update
16th Nov 20097:00 amRNSDrilling Report
10th Nov 20097:00 amRNSDrilling Report
30th Oct 20099:44 amRNSHolding(s) in Company
28th Oct 200910:01 amRNSHolding(s) in Company
6th Oct 20097:17 amRNSSugarloaf Block B Work Program
1st Oct 20099:01 amRNSHolding(s) in Company
21st Sep 20097:51 amRNSFarm-out of Block B Sugarloaf
18th Sep 20097:53 amRNSUpdate Eagle Oil Pool Development Project
10th Sep 200910:22 amRNSHolding(s) in Company
3rd Sep 20097:47 amRNSRiverbend Project commencement of operations
1st Sep 200910:43 amRNSHolding(s) in Company
17th Aug 20098:14 amRNSRiverbend Project update
13th Jul 200910:32 amRNSExercise of Options
8th Jul 200911:30 amRNSHolding(s) in Company
3rd Jul 20092:16 pmRNSResult of AGM
15th Jun 20097:00 amRNSChange of Name of Nominated Adviser and Broker
9th Jun 20099:59 amRNSHolding(s) in Company
8th Jun 20093:57 pmRNSNotice of AGM
4th Jun 20097:00 amRNSIssue of Equity
1st Jun 20098:19 amRNSPlacing of ?816,000, Farm-in to Riverbend Project
26th May 200912:20 pmRNSFinal Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.