Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpyrean Regulatory News (EME)

Share Price Information for Empyrean (EME)

Share Price is delayed by 15 minutes
Get Live Data
0.0575    0.00 (0.00%)
Bid:
0.055
Ask:
0.06
Spread: 0.005 (9.091%)
Market Cap: £3.29m
EME Live PriceLast checked at - London Stock Exchange

Intraday Empyrean Share Chart

Sugarloaf Project Update

21 Dec 2011 07:06

RNS Number : 3971U
Empyrean Energy PLC
21 December 2011
 

21 December 2011

Empyrean Energy PLC

("Empyrean" or the "Company"; Ticker: (EME))

Sugarloaf Project, ("Sugarloaf"), Block B, Texas USA

 

 

Empyrean is pleased to provide the following update on operations at the Sugarloaf Project ("the Project"), an Eagle Ford Shale liquids rich producing field within the Sugarkane Gas & Condensate Field, Texas

Key status points:-

 

·; As at today's date there are 24 wells on production that Empyrean has an interest in, including 6 farmout wells.

 

·; Marathon Oil Corporation ("Marathon") has assumed operatorship of the Project as of 1 November 2011.

 

·; Empyrean has been advised by Former operator, Hilcorp, that the cost recovery mechanism on the farmout pool of 3 new Sugarloaf wells has been repaid and that Empyrean will participate in the revenue from those wells from October. The payout period has taken considerably longer than the simple cost recovery of well Capex because of the inclusion of additional infrastructure costs in the payout calculation mechanism. This infrastructure has facilitated early field production.

 

·; Gross total production from the Sugarloaf Project was 230,973 boe in November which comprises 135,064 bbls oil and 34,527 bbls Non Gas Liquids ("NGLs") and 368.3 MMcf gas by volume. The liquids rich nature of the acreage results in approximately 80% of production being derived from oil and NGL's by volume. Production figures have been influenced by a number of wells being shut in for the installation of production tubing during November; the figures this month do not reflect field production capacity.

 

Production Data

The following wells have been on production for a period of 30 or 60 days and Empyrean is pleased to provide the market with an update on produced volumes during that period:-

 

Well

 

 

Days

Working Interest

Total Gas Production (mscf)

Total Condensate Production (bbls)

Average Daily Equivalent Oil Rate (boe/d)*

Holland Brown #1H

30

3.0%

28,926

29,177

1,183

YoskoBorgfield #1H

60

1.51%

39,535

38,233

798

\* The equivalent barrels per day production rate has been calculated on a simple 6:1 ratio.

** Note the cumulative production volumes are the actual volumes of oil and rich gas, as recorded at the time, produced during the 1st 30 day period, therefore at times the well may not have been on production for the full 30 day period. The production rate is the average achieved during the periods when the well was flowing during the 30 day period, the figure is calculated from the rich gas and liquids produced at the wellhead and does not account for subsequent treatment, i.e. NGL yield is not considered in these figures.

 

Operations

Following the assumption of Operatorship, Marathon advised that it planned a systematic program of tubing installation across the wells in the field. The majority of the wells have to date produced through 5 ½" production casing and are to have 2 3/8" production tubing installed with gas lift valves for future purposes. The smaller bore tubing will help optimise the lift performance of these high liquid content wells.

The following wells have commenced production since the last operational update.

 

Well

Working Interest

Date of 1st Production

Holland Opiela #1H

0.35%

08/12/11

 

 

The information contained in this announcement was completed and reviewed by the Technical Director of Empyrean Energy Plc, Mr Frank Brophy BSc (Hons) who has over 40 years experience as a petroleum geologist.

 

 

For further information

Empyrean Energy plc 

Tom Kelly

+618 9388 8041

 

Shore Capital

Anita Ghanekar

Edward Mansfield

+44 (0) 207 408 4090

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCFEESWFFFSESE
Date   Source Headline
16th Sep 20227:08 amRNSFinal Results
9th Sep 20227:00 amRNSMako Gas Project - Updated Plan of Development
2nd Sep 20229:04 amRNSPosting of Notice of Annual General Meeting
10th Jun 20227:00 amRNSSecond phase of exploration for Topaz Prospect
7th Jun 20227:00 amRNSChange of Registered Office Address
23rd May 20228:40 amRNSHolding(s) in Company
12th May 20224:41 pmRNSSecond Price Monitoring Extn
12th May 20224:36 pmRNSPrice Monitoring Extension
10th May 202211:45 amRNSCapital raising, drill analysis & debt restructure
4th May 20227:33 amRNSProposed drilling of Topaz Prospect
27th Apr 20227:00 amRNSJade well reached Total Depth
25th Apr 202211:59 amRNSHolding(s) in Company
21st Apr 20228:37 amRNSExercise of Warrants
19th Apr 20227:00 amRNSBlock 29/11, China - Jade drilling update
13th Apr 20227:43 amRNSDrilling update at Jade prospect
11th Apr 202212:32 pmRNSExercise of Warrants
11th Apr 20227:00 amRNSDrilling commences at Jade prospect
8th Apr 20229:55 amRNSExercise of Warrants
8th Apr 20227:00 amRNSBlock 29/11, China - NH9 rig on Jade location
4th Apr 20227:00 amRNSBlock 29/11, China – NH9 rig to mobilise
30th Mar 20228:16 amRNSBlock 29/11, China - Jade well update
28th Mar 20228:01 amRNSPartial Conversion of Convertible Note
25th Mar 20227:34 amRNSRig Mobilisation and Anticipated Spud Date
16th Mar 20229:52 amRNSPartial Conversion of Convertible Note
11th Mar 20227:42 amRNSBlock 29/11, China – Jade drilling update
10th Mar 20227:00 amRNSEmpyrean moves to SETS trading platform
7th Mar 20228:03 amRNSBlock 29/11, China - Jade drilling update
24th Jan 20227:15 amRNSCyber Fraud Update
10th Jan 20227:00 amRNSJade drilling operational status
23rd Dec 20217:00 amRNSInterim Results
16th Dec 20214:41 pmRNSSecond Price Monitoring Extn
16th Dec 20214:36 pmRNSPrice Monitoring Extension
16th Dec 20211:07 pmRNSEmpyrean raises £7.623 million
15th Nov 20217:25 amRNSExercise of 12p Warrants
12th Nov 20217:49 amRNSExercise of 12p Warrants
11th Nov 20217:34 amRNSDrilling Contract Executed for Jade Prospect
3rd Nov 20217:00 amRNSOperations update Jade prospect drilling
26th Oct 20217:00 amRNSExercise of 12p Warrants
21st Oct 202110:00 amRNSExtension to Exercise Period for Placing Warrants
20th Oct 20217:08 amRNSExercise of 12p Warrants
19th Oct 20217:05 amRNSExercise of 12p Warrants
14th Oct 20217:05 amRNSExercise of 12p Warrants
13th Oct 20217:00 amRNSExercise of 12p Warrants
12th Oct 20219:00 amRNSExercise of 12p Warrants
11th Oct 20212:06 pmRNSSecond Price Monitoring Extn
11th Oct 20212:00 pmRNSPrice Monitoring Extension
6th Oct 202110:22 amRNSExercise of 12p Warrants
5th Oct 20217:00 amRNSJade prospect - Well site survey contract awarded
23rd Sep 202111:00 amRNSResults of Annual General Meeting
23rd Sep 20219:50 amRNSAGM Company Presentation

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.