Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpyrean Regulatory News (EME)

Share Price Information for Empyrean (EME)

Share Price is delayed by 15 minutes
Get Live Data
0.0575    0.00 (0.00%)
Bid:
0.055
Ask:
0.06
Spread: 0.005 (9.091%)
Market Cap: £3.29m
EME Live PriceLast checked at - London Stock Exchange

Intraday Empyrean Share Chart

Sugarloaf Project Update

21 Dec 2011 07:06

RNS Number : 3971U
Empyrean Energy PLC
21 December 2011
 

21 December 2011

Empyrean Energy PLC

("Empyrean" or the "Company"; Ticker: (EME))

Sugarloaf Project, ("Sugarloaf"), Block B, Texas USA

 

 

Empyrean is pleased to provide the following update on operations at the Sugarloaf Project ("the Project"), an Eagle Ford Shale liquids rich producing field within the Sugarkane Gas & Condensate Field, Texas

Key status points:-

 

·; As at today's date there are 24 wells on production that Empyrean has an interest in, including 6 farmout wells.

 

·; Marathon Oil Corporation ("Marathon") has assumed operatorship of the Project as of 1 November 2011.

 

·; Empyrean has been advised by Former operator, Hilcorp, that the cost recovery mechanism on the farmout pool of 3 new Sugarloaf wells has been repaid and that Empyrean will participate in the revenue from those wells from October. The payout period has taken considerably longer than the simple cost recovery of well Capex because of the inclusion of additional infrastructure costs in the payout calculation mechanism. This infrastructure has facilitated early field production.

 

·; Gross total production from the Sugarloaf Project was 230,973 boe in November which comprises 135,064 bbls oil and 34,527 bbls Non Gas Liquids ("NGLs") and 368.3 MMcf gas by volume. The liquids rich nature of the acreage results in approximately 80% of production being derived from oil and NGL's by volume. Production figures have been influenced by a number of wells being shut in for the installation of production tubing during November; the figures this month do not reflect field production capacity.

 

Production Data

The following wells have been on production for a period of 30 or 60 days and Empyrean is pleased to provide the market with an update on produced volumes during that period:-

 

Well

 

 

Days

Working Interest

Total Gas Production (mscf)

Total Condensate Production (bbls)

Average Daily Equivalent Oil Rate (boe/d)*

Holland Brown #1H

30

3.0%

28,926

29,177

1,183

YoskoBorgfield #1H

60

1.51%

39,535

38,233

798

\* The equivalent barrels per day production rate has been calculated on a simple 6:1 ratio.

** Note the cumulative production volumes are the actual volumes of oil and rich gas, as recorded at the time, produced during the 1st 30 day period, therefore at times the well may not have been on production for the full 30 day period. The production rate is the average achieved during the periods when the well was flowing during the 30 day period, the figure is calculated from the rich gas and liquids produced at the wellhead and does not account for subsequent treatment, i.e. NGL yield is not considered in these figures.

 

Operations

Following the assumption of Operatorship, Marathon advised that it planned a systematic program of tubing installation across the wells in the field. The majority of the wells have to date produced through 5 ½" production casing and are to have 2 3/8" production tubing installed with gas lift valves for future purposes. The smaller bore tubing will help optimise the lift performance of these high liquid content wells.

The following wells have commenced production since the last operational update.

 

Well

Working Interest

Date of 1st Production

Holland Opiela #1H

0.35%

08/12/11

 

 

The information contained in this announcement was completed and reviewed by the Technical Director of Empyrean Energy Plc, Mr Frank Brophy BSc (Hons) who has over 40 years experience as a petroleum geologist.

 

 

For further information

Empyrean Energy plc 

Tom Kelly

+618 9388 8041

 

Shore Capital

Anita Ghanekar

Edward Mansfield

+44 (0) 207 408 4090

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCFEESWFFFSESE
Date   Source Headline
2nd Sep 20217:00 amRNSAward of Drilling Contract for Jade Prospect
27th Aug 20219:00 amRNSPosting of Annual Report and Notice of AGM
26th Aug 20213:12 pmRNSFinal Results
26th Jul 20211:41 pmRNSHolding(s) in Company
9th Jul 20219:05 amRNSSecond Price Monitoring Extn
9th Jul 20219:00 amRNSPrice Monitoring Extension
9th Jul 20218:05 amRNS£5.02 million Placement
12th May 20214:40 pmRNSSecond Price Monitoring Extn
12th May 20214:36 pmRNSPrice Monitoring Extension
12th May 20212:06 pmRNSSecond Price Monitoring Extn
12th May 20212:00 pmRNSPrice Monitoring Extension
5th May 20217:00 amRNSJade prospect well design and engineering project
29th Apr 20214:41 pmRNSSecond Price Monitoring Extn
29th Apr 20214:36 pmRNSPrice Monitoring Extension
23rd Apr 20217:00 amRNSJade Drilling - Well design & engineering Project
22nd Apr 20214:35 pmRNSPrice Monitoring Extension
22nd Apr 20217:00 amRNSUS Tax Refund Received
12th Apr 20217:00 amRNSUpgraded Internal Geological Chance of Success
25th Mar 20217:00 amRNSSacramento Basin Assets
17th Mar 20214:40 pmRNSSecond Price Monitoring Extn
17th Mar 20214:35 pmRNSPrice Monitoring Extension
4th Mar 20217:04 amRNSUS Tax Refund
6th Jan 20212:05 pmRNSSecond Price Monitoring Extn
6th Jan 20212:00 pmRNSPrice Monitoring Extension
22nd Dec 20207:00 amRNSInterim Results
21st Dec 20207:00 amRNSMako Gas Project - Updated Plan of Development
16th Dec 20204:41 pmRNSSecond Price Monitoring Extn
16th Dec 20204:35 pmRNSPrice Monitoring Extension
28th Oct 20207:14 amRNSBorba Drilling Program
2nd Oct 20207:59 amRNSAppointment of Joint Broker
22nd Sep 202011:06 amRNSResults of Annual General Meeting
22nd Sep 20209:45 amRNSAGM Company Presentation and Question & Answers
21st Sep 20207:00 amRNSDirector/PDMR Shareholding
15th Sep 20208:34 amRNSAward of Options
15th Sep 20208:32 amRNSUpdate re: Annual General Meeting
11th Sep 20207:15 amRNSEmpyrean completes £640,500 Placement
11th Sep 20207:00 amRNSEmpyrean completes £200,000 Placement
21st Aug 202010:11 amRNSFinal Results
3rd Jun 20207:00 amRNSExtension agreed for first phase at Block 29/11
26th May 20207:00 amRNSMako Resource Audit Confirms Significant Upgrade
22nd May 20207:00 amRNSDuyung PSC Update, Indonesia
21st May 20207:00 amRNSBlock 29/11, China - Seismic Inversion Project
12th May 20207:40 amRNSResult of Open Offer
29th Apr 20207:00 amRNSCompany Update
22nd Apr 20207:26 amRNSLaunch of Open Offer
17th Apr 202010:57 amRNSUpdate on Fundraising
14th Apr 20207:30 amRNSSubscription and Proposed Placing
14th Apr 20207:00 amRNSResource Upgrade of Mako Gas Field
25th Mar 20202:11 pmRNSHolding(s) in Company
10th Feb 20207:44 amRNSDuyung PSC Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.