Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpyrean Regulatory News (EME)

Share Price Information for Empyrean (EME)

Share Price is delayed by 15 minutes
Get Live Data
0.0575    0.00 (0.00%)
Bid:
0.055
Ask:
0.06
Spread: 0.005 (9.091%)
Market Cap: £3.29m
EME Live PriceLast checked at - London Stock Exchange

Intraday Empyrean Share Chart

Sugarloaf Block B Update

18 Feb 2009 07:00

RNS Number : 4916N
Empyrean Energy PLC
18 February 2009
 



18 February 2009

Empyrean Energy PLC 

("Empyrean" or the "Company"; Ticker: (EME))

Sugarloaf Project, ("Sugarloaf"), Block B, Texas USA

Empyrean Energy Plc, the oil and gas explorer and producer with assets in Germany and the USA, provides the following update on operations on the Sugarloaf Project which is part of the Sugarkane Gas and Condensate Field:

Weston-1H

Empyrean has been advised by the Operator, Texas Crude Energy Inc ("TCEI"), that the production liner has now been successfully run and cemented to a revised measured depth of 15,797 ft. This secures over 3,000 ft of gas bearing matrix Austin Chalk behind pipe for future stimulation.

The Patterson #130 drilling rig was contractually released at 09:00hrs on 15/02/09 (US CST) and the rig has now been demobilised.

The completion of drilling operations at Weston-1H provides the Sugarloaf Joint Venture with three horizontal wells and the following table summarises their status.

Well

Horizontal Section (ft)

Formation

Completion

Fracture Stimulated

Tied in and producing

Latest production (mmscfe/d)

Kennedy-1H

3,800

Eagleford Shale

Cemented Liner

Attempted bottom 600 ft

Yes

0.18

Kowalik-1H

4,600

Austin Chalk

Uncemented Slotted Liner

No

Yes

1.4

Weston-1H

3,000

Austin Chalk

Cemented Liner

No

No

-

All three wells encountered gas charged matrix rock along their length and Kowalik-1H is believed to have encountered natural fractures over the last 1,500 ft of the well. The two wells with cemented liners will need to be fracture stimulated to achieve production. The Joint Venture has learned from the earlier fracture stimulation operations at Kennedy-1H and, based on results from recent fractured wells in the adjacent and on trend acreage, believes that improved results can be achieved when this work is carried out. The production results at Kowalik-1H are not consistent with the indications observed whilst drilling and the Joint Venture is also optimistic that this rate can be improved.

The timing and detailed design of the next completion activity on all three wells is subject to confirmation work by the operator and agreement by the Joint Venture partners. 

Empyrean has a 6% interest in the Weston-1H well.

Further updates will be provided following developments.

The information contained in this announcement was completed and reviewed by the Technical Director of Empyrean Energy Plc, Mr Frank Brophy BSc (Hons) who has over 40 years experience as a petroleum geologist.

For further information 

Empyrean Energy plc 

Tom Kelly

Tel: +618 9321 6988 

 

Blue Oar Securities Plc

Olly Cairns / Jerry Keen

Tel: (+61) 8 6430 1631 / (+44) 207 448 4400 

 

Jonathan Charles / Fiona Hyland

Conduit PR 

Tel: +44 (0) 207 429 6611 / +44 (0) 7791 892 509 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCSFFSLASUSEDE
Date   Source Headline
15th Aug 20088:00 amRNSAppointment of New Nominated
13th Aug 20087:54 amRNSSugarloaf Update, Block B
1st Aug 20087:30 amRNSSugarloaf Block A Update
31st Jul 20089:26 amRNSSugarloaf Update Block B
21st Jul 20087:42 amRNSSugarloaf Block B - Update
18th Jul 20087:13 amRNSSugarloaf - Block A-4 Update
10th Jul 20088:05 amRNSSugarloaf Block B - Update
30th Jun 20087:00 amRNSTotal Voting Rights
26th Jun 20081:45 pmRNSResult of AGM
24th Jun 20087:00 amRNSSugarloaf Block A Update
23rd Jun 20087:07 amRNSSugarloaf Block B Update
19th Jun 200810:10 amRNSHolding(s) in Company
10th Jun 20087:00 amRNSIssue of Equity
3rd Jun 20085:52 pmRNSHolding(s) in Company
3rd Jun 20082:42 pmRNSAnnual Report and Accounts
3rd Jun 20081:48 pmRNSNotice of AGM
28th May 20087:10 amRNSSugarloaf Block A
27th May 20087:00 amRNSTrading Statement
19th May 20087:03 amRNSSugarloaf Block B Update
7th May 20087:05 amRNSSugarloaf Block B Update
30th Apr 20088:10 amRNSSugarloaf Block A Update
23rd Apr 20089:56 amRNSHolding(s) in Company
21st Apr 20087:00 amRNSSugarloaf Block A Update
17th Apr 20087:10 amRNSSugarloaf Block A - Update
14th Apr 20087:15 amRNSSugarloaf Block A Update
17th Mar 20089:19 amRNSPartner Announcement
27th Feb 20082:39 pmRNSGrant of Options
19th Feb 200812:07 pmRNSStatement re Share Price
18th Feb 20087:54 amRNSProjects Update
11th Feb 20087:00 amRNSBondi Prospect Update
10th Jan 20082:16 pmRNSHolding(s) in Company
10th Jan 20089:36 amRNSBondi Update
18th Dec 20072:39 pmRNSHolding(s) in Company
14th Dec 20077:50 amRNSSugarloaf Block B Update
11th Dec 20071:15 pmRNSInterim Results
10th Dec 20077:33 amRNSBondi Prospect Update
6th Dec 20077:31 amRNSSugarloaf Block B Update
20th Nov 20078:58 amRNSSugarloaf Update
15th Nov 20077:05 amRNSDrilling Report
14th Nov 20079:06 amRNSDrilling Report
8th Nov 20077:46 amRNSDrilling Report
5th Nov 20079:02 amRNSDrilling Report
1st Nov 20077:59 amRNSDrilling Report
31st Oct 20077:12 amRNSDrilling Report
25th Oct 200711:36 amRNSHolding(s) in Company
24th Oct 20077:39 amRNSSugarloaf Update
18th Oct 20077:53 amRNSDrilling Report
10th Oct 20077:35 amRNSBondi Prospect Update
10th Oct 20077:00 amRNSSugarloaf Prospect Update
5th Oct 20077:00 amRNSSugarloaf - Drilling Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.