Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpyrean Regulatory News (EME)

Share Price Information for Empyrean (EME)

Share Price is delayed by 15 minutes
Get Live Data
0.0575    0.00 (0.00%)
Bid:
0.055
Ask:
0.06
Spread: 0.005 (9.091%)
Market Cap: £3.29m
EME Live PriceLast checked at - London Stock Exchange

Intraday Empyrean Share Chart

Drilling Update

18 Oct 2006 08:09

Empyrean Energy PLC18 October 2006 Empyrean Energy PLC ("Empyrean" or the "Company"; Ticker: (EME)) Sugarloaf Hosston Prospect, Texas USA ------------------------------------- AIM quoted Empyrean Energy PLC today announces that at 6am Texas time on 17thOctober 2006 the Sugarloaf-1 exploration well, located in the onshore Gulf CoastBasin in Texas, USA, was at a depth of 17,000 feet (5,183 metres) and theoperator was preparing to run 7 inch liner to be tied back into the 9 5/8 inchcasing set at 14,480 feet (4,415 metres). Since the last report, the well drilled 2,520 feet (768 metres) of 8 1/2 inchdiameter hole, mostly in a Cretaceous age limestone, which was a secondary gastarget in the well. In this interval, several methane-only gas shows wereobtained. In order to isolate the extensive interval of limestone inanticipation of higher pressures in the Hosston Formation target, drilling washalted at 17,000 feet (5,183 metres) to enable a 7 5/8 inch liner to be run andcemented in place. Wire-line logs have been run over the interval 14,480 to 17,000 feet (4,415 to5,183 metres) and preliminary interpretation indicates the presence of a fewthin zones of interest. A decision as to whether any zone is sufficientlyattractive to warrant production testing will be made by the joint venture oncethe well has reached total depth and final logs are available. After the 7 inch casing has been run and set, drilling will resume towards andinto the primary Hosston Formation target, which is expected to be reachedwithin a few days. Based on seismic data and an offset well the HosstonFormation is anticipated to consist of more than 4000 feet (1,220 metres) ofinter-bedded sandstones and shales with the potential for multiple prospectiveintervals. The proposed total depth of 21,000 feet (6,400 metres) is expected to be reachedduring November assuming trouble-free drilling The information contained in this announcement was completed and reviewed by theTechnical Director of Empyrean Energy Plc, Mr Frank Brophy BSc (Hons) who hasover 40 years experience as a petroleum geologist. For further information Laurence Read/ Ed Portman Conduit PR Tel: +44 (0) 207 429 6605 / +44 (0) 7979955923 Empyrean Energy plcTel : +44(0) 207 932 2442 Imran Ahmad/ Cecil JordaanHB-CorporateTel: +44(0) 207 510 8600 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
9th Apr 20107:00 amRNSPlacing to raise ?1.5m
1st Apr 20101:03 pmRNSSugarloaf Project Block B Update
1st Apr 20107:35 amRNSConvertible Loan Facility
30th Mar 20107:40 amRNSRiverbend Project Quinn-3H Well Update
26th Mar 20107:37 amRNSHercules Prospect Update
25th Mar 20107:39 amRNSSugarloaf Project Block B Update
17th Mar 20107:42 amRNSAquarius Prospect, McMillan Well Update
17th Mar 20107:38 amRNSSugarloaf Project Block B Update
16th Mar 20102:33 pmRNSExercise of Options and Director Shareholdings
9th Mar 20107:41 amRNSBP America well reaches total depth on Hercules
9th Mar 20107:38 amRNSMcMillan Well spuds on the Aquarius Prospect
3rd Mar 20107:38 amRNSSugarloaf Project, Block B Update
24th Feb 20107:36 amRNSSugarloaf Project, Block B Update
23rd Feb 20107:42 amRNSHercules Prospect Update
19th Feb 20107:37 amRNSSugarloaf Project, Block B, Update
5th Feb 20108:08 amRNSSugarloaf Project Block B Update
4th Feb 20107:52 amRNSRiverbend Project, onshore Texas, USA
1st Feb 20107:38 amRNSSugarloaf Project Update
28th Jan 20107:34 amRNSSugarloaf Project Update
22nd Jan 20107:41 amRNSSugarloaf Project Update
15th Jan 20107:21 amRNSSugarloaf Project, Block B, Update
13th Jan 20109:00 amRNSRiverbend Project, onshore Texas, USA
7th Jan 20108:05 amRNSKowalik-1H update and new well preparations
30th Dec 20097:00 amRNSKowalik-1H Fracture Stimulation Program
23rd Dec 20098:23 amRNSSugarloaf Project, Block B, Texas USA
15th Dec 20097:39 amRNSParticipation in 10% of Aquarius Prject, Texas
10th Dec 20097:41 amRNSParticipation in 10% of Hercules Prospect, Texas
4th Dec 20093:21 pmRNSInterim Results
19th Nov 20097:00 amRNSSugarloaf Block B Update
16th Nov 20097:00 amRNSDrilling Report
10th Nov 20097:00 amRNSDrilling Report
30th Oct 20099:44 amRNSHolding(s) in Company
28th Oct 200910:01 amRNSHolding(s) in Company
6th Oct 20097:17 amRNSSugarloaf Block B Work Program
1st Oct 20099:01 amRNSHolding(s) in Company
21st Sep 20097:51 amRNSFarm-out of Block B Sugarloaf
18th Sep 20097:53 amRNSUpdate Eagle Oil Pool Development Project
10th Sep 200910:22 amRNSHolding(s) in Company
3rd Sep 20097:47 amRNSRiverbend Project commencement of operations
1st Sep 200910:43 amRNSHolding(s) in Company
17th Aug 20098:14 amRNSRiverbend Project update
13th Jul 200910:32 amRNSExercise of Options
8th Jul 200911:30 amRNSHolding(s) in Company
3rd Jul 20092:16 pmRNSResult of AGM
15th Jun 20097:00 amRNSChange of Name of Nominated Adviser and Broker
9th Jun 20099:59 amRNSHolding(s) in Company
8th Jun 20093:57 pmRNSNotice of AGM
4th Jun 20097:00 amRNSIssue of Equity
1st Jun 20098:19 amRNSPlacing of ?816,000, Farm-in to Riverbend Project
26th May 200912:20 pmRNSFinal Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.