Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpyrean Regulatory News (EME)

Share Price Information for Empyrean (EME)

Share Price is delayed by 15 minutes
Get Live Data
0.055    -0.0025 (-4.35%)
Bid:
0.05
Ask:
0.06
Spread: 0.01 (20.00%)
Market Cap: £3.15m
EME Live PriceLast checked at - London Stock Exchange

Intraday Empyrean Share Chart

Drilling Report

13 Apr 2006 09:57

Empyrean Energy PLC13 April 2006 Empyrean Energy PLC ("Empyrean" or the "Company"; Ticker: (EME)) Drilling Update • Good oil shows encountered whilst drilling at Eagle North-1 in California, USA. • Oil encountered is in the target lower Mary Bellocchi oil sands. AIM quoted Empyrean Energy PLC today announces the following update on the EagleNorth-1 well, California, USA:Victoria Petroleum NL as operator for the Eagle North-1 horizontal well in theEagle Oil Pool Development Project in the San Joaquin Basin advises that at 2300hours Central Pacific Time 12 April 2006, the current operation at Eagle North-1horizontal well was drilling ahead at 4,272 metres (14,015 feet) measured depthafter encountering oil shows in the target lower Mary Bellochi oil sand. The operator has advised good oil shows for the drilling conditions were firstseen in drill cuttings at 4,255 metres (13,960 feet ) measured depth (4,152metres TVD KB) and continue to be present. The forward plan is to drill another 25 metres to 4,293 metres (14,085 feet) andthen pull out of the hole to run 4 1/2 inch casing. The well bore is currentlyat an angle of 87 degrees from the vertical. With the Kreyengagen Shale behind the 41/2 inch liner, the Gatchell target oilsands will be drilled with a normal pressured water based KCL-Clarizan mudminimising formation invasion and maximing the evaluation of the oil bearingpotential of the oil sand. Following setting of the intermediate 41/2 inch liner, a 3 3/4 inch horizontalwell bore will then be drilled over a distance of 320 metres to within 30 metresof the Mary Bellocchi-1 oil well. This horizontal well bore will then becompleted for production with a 2 7/8 inch slotted production liner. A further update will be made as information becomes available. Executive Director - Tom Kelly commented "This type of oil show is extremelyencouraging and we look forward to being able to provide a further update as ourcompletion operations progress." The information contained in this announcement has been reviewed by theTechnical Director of Empyrean Energy Plc, Mr Frank Brophy BSc (Hons) who hasover 40 years experience as a petroleum geologist. For further information Laurence Read/ Angus Prentice Conduit PR Tel: +44 (0)207 429 6603 Mob: +44 (0)7974 982 512 Imran AhmadToby Howell HB-CorporateTel: +44(0)207 510 8600 Empyrean Energy plcTel : +44(0)207 932 2442 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
16th Sep 20227:08 amRNSFinal Results
9th Sep 20227:00 amRNSMako Gas Project - Updated Plan of Development
2nd Sep 20229:04 amRNSPosting of Notice of Annual General Meeting
10th Jun 20227:00 amRNSSecond phase of exploration for Topaz Prospect
7th Jun 20227:00 amRNSChange of Registered Office Address
23rd May 20228:40 amRNSHolding(s) in Company
12th May 20224:41 pmRNSSecond Price Monitoring Extn
12th May 20224:36 pmRNSPrice Monitoring Extension
10th May 202211:45 amRNSCapital raising, drill analysis & debt restructure
4th May 20227:33 amRNSProposed drilling of Topaz Prospect
27th Apr 20227:00 amRNSJade well reached Total Depth
25th Apr 202211:59 amRNSHolding(s) in Company
21st Apr 20228:37 amRNSExercise of Warrants
19th Apr 20227:00 amRNSBlock 29/11, China - Jade drilling update
13th Apr 20227:43 amRNSDrilling update at Jade prospect
11th Apr 202212:32 pmRNSExercise of Warrants
11th Apr 20227:00 amRNSDrilling commences at Jade prospect
8th Apr 20229:55 amRNSExercise of Warrants
8th Apr 20227:00 amRNSBlock 29/11, China - NH9 rig on Jade location
4th Apr 20227:00 amRNSBlock 29/11, China – NH9 rig to mobilise
30th Mar 20228:16 amRNSBlock 29/11, China - Jade well update
28th Mar 20228:01 amRNSPartial Conversion of Convertible Note
25th Mar 20227:34 amRNSRig Mobilisation and Anticipated Spud Date
16th Mar 20229:52 amRNSPartial Conversion of Convertible Note
11th Mar 20227:42 amRNSBlock 29/11, China – Jade drilling update
10th Mar 20227:00 amRNSEmpyrean moves to SETS trading platform
7th Mar 20228:03 amRNSBlock 29/11, China - Jade drilling update
24th Jan 20227:15 amRNSCyber Fraud Update
10th Jan 20227:00 amRNSJade drilling operational status
23rd Dec 20217:00 amRNSInterim Results
16th Dec 20214:41 pmRNSSecond Price Monitoring Extn
16th Dec 20214:36 pmRNSPrice Monitoring Extension
16th Dec 20211:07 pmRNSEmpyrean raises £7.623 million
15th Nov 20217:25 amRNSExercise of 12p Warrants
12th Nov 20217:49 amRNSExercise of 12p Warrants
11th Nov 20217:34 amRNSDrilling Contract Executed for Jade Prospect
3rd Nov 20217:00 amRNSOperations update Jade prospect drilling
26th Oct 20217:00 amRNSExercise of 12p Warrants
21st Oct 202110:00 amRNSExtension to Exercise Period for Placing Warrants
20th Oct 20217:08 amRNSExercise of 12p Warrants
19th Oct 20217:05 amRNSExercise of 12p Warrants
14th Oct 20217:05 amRNSExercise of 12p Warrants
13th Oct 20217:00 amRNSExercise of 12p Warrants
12th Oct 20219:00 amRNSExercise of 12p Warrants
11th Oct 20212:06 pmRNSSecond Price Monitoring Extn
11th Oct 20212:00 pmRNSPrice Monitoring Extension
6th Oct 202110:22 amRNSExercise of 12p Warrants
5th Oct 20217:00 amRNSJade prospect - Well site survey contract awarded
23rd Sep 202111:00 amRNSResults of Annual General Meeting
23rd Sep 20219:50 amRNSAGM Company Presentation

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.