Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpyrean Regulatory News (EME)

Share Price Information for Empyrean (EME)

Share Price is delayed by 15 minutes
Get Live Data
0.05    0.00 (0.00%)
Bid:
0.045
Ask:
0.055
Spread: 0.01 (22.222%)
Market Cap: £2.86m
EME Live PriceLast checked at - London Stock Exchange

Intraday Empyrean Share Chart

Drilling Report

13 Apr 2006 09:57

Empyrean Energy PLC13 April 2006 Empyrean Energy PLC ("Empyrean" or the "Company"; Ticker: (EME)) Drilling Update • Good oil shows encountered whilst drilling at Eagle North-1 in California, USA. • Oil encountered is in the target lower Mary Bellocchi oil sands. AIM quoted Empyrean Energy PLC today announces the following update on the EagleNorth-1 well, California, USA:Victoria Petroleum NL as operator for the Eagle North-1 horizontal well in theEagle Oil Pool Development Project in the San Joaquin Basin advises that at 2300hours Central Pacific Time 12 April 2006, the current operation at Eagle North-1horizontal well was drilling ahead at 4,272 metres (14,015 feet) measured depthafter encountering oil shows in the target lower Mary Bellochi oil sand. The operator has advised good oil shows for the drilling conditions were firstseen in drill cuttings at 4,255 metres (13,960 feet ) measured depth (4,152metres TVD KB) and continue to be present. The forward plan is to drill another 25 metres to 4,293 metres (14,085 feet) andthen pull out of the hole to run 4 1/2 inch casing. The well bore is currentlyat an angle of 87 degrees from the vertical. With the Kreyengagen Shale behind the 41/2 inch liner, the Gatchell target oilsands will be drilled with a normal pressured water based KCL-Clarizan mudminimising formation invasion and maximing the evaluation of the oil bearingpotential of the oil sand. Following setting of the intermediate 41/2 inch liner, a 3 3/4 inch horizontalwell bore will then be drilled over a distance of 320 metres to within 30 metresof the Mary Bellocchi-1 oil well. This horizontal well bore will then becompleted for production with a 2 7/8 inch slotted production liner. A further update will be made as information becomes available. Executive Director - Tom Kelly commented "This type of oil show is extremelyencouraging and we look forward to being able to provide a further update as ourcompletion operations progress." The information contained in this announcement has been reviewed by theTechnical Director of Empyrean Energy Plc, Mr Frank Brophy BSc (Hons) who hasover 40 years experience as a petroleum geologist. For further information Laurence Read/ Angus Prentice Conduit PR Tel: +44 (0)207 429 6603 Mob: +44 (0)7974 982 512 Imran AhmadToby Howell HB-CorporateTel: +44(0)207 510 8600 Empyrean Energy plcTel : +44(0)207 932 2442 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
5th Jun 20153:31 pmRNSHolding(s) in Company
21st May 20157:50 amRNSQ1 2015 Production Update from Sugarloaf AMI
27th Apr 201512:45 pmRNSHolding(s) in Company
8th Apr 201510:45 amRNSHedging contracts with Macquarie Bank Limited
1st Apr 20159:15 amRNSMacquarie Bank Facility Re-finance and drawdown
26th Mar 20158:00 amRNSQ4 2014 Production from Sugarloaf AMI, Texas
2nd Mar 20159:42 amRNSCorrection: Exercise of Options
2nd Mar 20159:15 amRNSExercise of Options
4th Feb 20159:53 amRNSForm 8.5 (EPT/NON-RI)
4th Feb 20157:50 amRNSUpdate on Strategic Review; Termination of FSP
30th Jan 20159:09 amRNSForm 8.5 (EPT/NON-RI)
28th Jan 20159:23 amRNSForm 8.5 (EPT/NON-RI)
27th Jan 20159:23 amRNSForm 8.5 (EPT/NON-RI)
26th Jan 20159:08 amRNSForm 8.5 (EPT/NON-RI)
23rd Jan 20151:27 pmRNSForm 8.3 - Empyrean Energy PLC
23rd Jan 201510:11 amRNSForm 8.5 (EPT/NON-RI)
22nd Jan 20159:47 amRNSForm 8.5 (EPT/NON-RI)
21st Jan 20159:15 amRNSForm 8.5 (EPT/NON-RI)
20th Jan 20159:37 amRNSForm 8.5 (EPT/NON-RI)
16th Jan 20151:52 pmRNSForm 8.3 - Empyrean Energy PLC
16th Jan 201511:54 amRNSForm 8.5 (EPT/NON-RI)
15th Jan 20159:45 amRNSForm 8.5 (EPT/NON-RI)
14th Jan 20156:29 pmRNSForm 8.3 - Empyrean Energy PLC
14th Jan 20155:27 pmRNSForm 8.3 - Empyrean Energy PLC
14th Jan 20154:47 pmRNSForm 8.3 - Empyrean Energy PLC
14th Jan 20159:26 amRNSForm 8.5 (EPT/NON-RI)
13th Jan 20159:56 amRNSForm 8.5 (EPT/NON-RI)
12th Jan 20155:19 pmRNSForm 8.3 - Empyrean Energy PLC
12th Jan 20159:28 amRNSForm 8.5 (EPT/NON-RI)
9th Jan 20159:49 amRNSForm 8.5 (EPT/NON-RI)
8th Jan 20153:49 pmRNSForm 8.3 - Empyrean Energy PLC
8th Jan 20159:25 amRNSForm 8.5 (EPT/NON-RI)
8th Jan 20157:00 amRNSRepays USD 2m of Macquarie Facility
7th Jan 20159:13 amRNSForm 8.5 (EPT/NON-RI)
6th Jan 201510:10 amRNSForm 8.5 (EPT/NON-RI)
30th Dec 20147:40 amRNSInterim Results
23rd Dec 201412:33 pmRNSForm 8.3 - Empyrean Energy PLC
23rd Dec 201410:07 amRNSForm 8.5 (EPT/NON-RI)
19th Dec 201411:25 amRNSForm 8.5 (EPT/NON-RI)
19th Dec 20147:00 amBUSForm 8.3 - Empyrean Energy plc
18th Dec 201410:32 amRNSForm 8.3 - Empyrean Energy PLC
17th Dec 201410:43 amRNSForm 8.5 (EPT/NON-RI)
15th Dec 201410:34 amRNSForm 8.5 (EPT/NON-RI)
12th Dec 20149:13 amRNSForm 8.5 (EPT/NON-RI)
11th Dec 201410:00 amRNSForm 8.5 (EPT/NON-RI)
11th Dec 20148:30 amRNSQ3 2014 Production from Sugarloaf AMI, Texas
10th Dec 201411:29 amRNSForm 8.5 (EPT/NON-RI)
9th Dec 201410:42 amRNSForm 8.3 - Empyrean Energy PLC
5th Dec 201412:16 pmRNSForm 8.3 - Empyrean Energy PLC
4th Dec 20148:35 amRNSForm 8.5 (EPT/NON-RI)

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.