Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpyrean Regulatory News (EME)

Share Price Information for Empyrean (EME)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.57
Bid: 0.50
Ask: 0.588
Change: 0.00 (0.00%)
Spread: 0.088 (17.60%)
Open: 0.57
High: 0.00
Low: 0.00
Prev. Close: 0.57
EME Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Q1 2015 Production Update from Sugarloaf AMI

21 May 2015 07:50

RNS Number : 8815N
Empyrean Energy PLC
21 May 2015
 

Empyrean Energy Plc / Index: AIM / Epic: EME / Sector: Oil & Gas

21 May 2015

Empyrean Energy PLC ('Empyrean' or 'the Company')

Q1 2015 Production from Sugarloaf AMI, Texas

 

Empyrean Energy, the profitable US onshore oil, gas and condensate exploration, development and production company with assets in Texas and California, is pleased to provide a production update from its flagship Sugarloaf AMI Project ('Sugarloaf' or the 'Project') in the prolific Eagle Ford Shale, Texas, for the three month period to the end of March 2015 ('Q1 2015' or the 'Quarter').

 

Empyrean has a 3% working interest in the Project, which is operated by Marathon Oil Company, a subsidiary of US major Marathon Oil Corporation (NYSE: MRO) ('Marathon' or the 'Operator').

 

Highlights

 

o Consistent production rates from Sugarloaf AMI for Q1 2015 of 109,425 boe net to Empyrean's interest after royalties and costs ('royalties') (Q4 2014: 111,921)

o Average daily production from Sugarloaf for Q1 2015 of 1,216 boe net to Empyrean's interest after royalties (Q4 2014: 1,217)

o Continued drilling and investment in Sugarloaf by Marathon, positively impacting drilling efficiency

o 205 gross producing wells at Sugarloaf at 31 March 2015, an increase of 18 since Q4 2014

o 218 gross producing wells at Sugarloaf at 20 May 2015, including 28 in the overlying Austin Chalk formation

o Inventory of 40 wells drilled and in various stages of completion at the end of the Quarter

o First "Stack and Frac" pilot now in production with encouraging early results

o Sugarloaf continues to demonstrate significant potential upside due to co-development opportunities

o Austin Chalk continues to be developed positively with short term potential to increase reserves from further delineation

o The Upper Eagle Ford is emerging as third co-development appraisal opportunity with potential upside available from delineation of a contingent resource

 

Empyrean CEO, Tom Kelly said, "Production from Sugarloaf continues to be economic even at current oil prices and has been maintained at steady rates, notwithstanding lower levels of drilling activity in the current, challenging oil price environment. The Project has also benefited from cost reductions and continued optimisation initiatives during the Quarter. Despite the challenges the sector faces, we have a healthy inventory of drilled wells to be placed into production in the coming months. We are also encouraged by the early "Stack and Frac" pilot results and look forward to more data and analysis from Marathon.

 

"The upside potential for Sugarloaf continues to grow with the rapid delineation of the Austin Chalk for co-development with the Lower Eagle Ford and the emergence of the Upper Eagle Ford as a co-development appraisal opportunity. We are positive for the coming year, having secured further financing from Macquarie, and look forward to updating the market on our activities as we deliver additional value from this major project. "

 

Further Information

 

The Company is pleased to report that total production for Q1 2015 was 109,425 boe net to Empyrean's interest after royalties, representing a small decrease of 2% on production for Q4 2014. Net average daily production for Q1 2015 was steady at 1,216 boe/d after royalties and net average daily production for the month of March 2014 was 1,203 boe/d after royalties.

 

At the end of the quarter, Empyrean had 205 gross wells that were producing at Sugarloaf, an increase of 18 wells since the end of December 2014. Furthermore, as at 20 May 2015, Empyrean had 218 gross wells that were producing at Sugarloaf and, of these, there are 28 wells in the Austin Chalk formation.

 

Marathon's spud to total depth cycle times averaged 12 days during Q1 2015. Empyrean notes that Marathon has achieved cycle times as low as seven days using its most efficient rigs within its greater Eagle Ford acreage. Marathon has also announced its intention to reduce its rig count within its Eagle Ford acreage during the second half of 2015, which may have a bearing on the rate of development within Sugarloaf.

 

During February 2015, one of the "Stack and Frac" pilots commenced production at Sugarloaf with encouraging early results from a 5 well programme. Two further pilots have completed drilling and await completion at Sugarloaf, with a number of others being assessed on Marathon's greater acreage outside of the Sugarloaf acreage. Empyrean awaits further data and analysis from Marathon on its assessment of these pilots.

 

In addition, Empyrean has an interest in an Upper Eagle Ford well that spud during February 2015. The well has been drilled, cased and prepared for fraccing.

 

Corporate

 

As previously announced, the Company made a US$11,000,000 further drawdown on its term debt facility with Macquarie Bank Limited at the end of March 2015 to support the Company's continued participation in Sugarloaf and the current development programme. The total outstanding under the facility currently stands at US$21.67m.

 

 

For further information please visit www.empyreanenergy.com or contact the following:

 

Empyrean Energy plc

Tom Kelly

Tel: +618 9481 0389

Cenkos Securities plc (NOMAD)

Neil McDonald

nmcdonald@cenkos.com

Tel: +44 (0) 131 220 9771

Nick Tulloch

ntulloch@cenkos.com

Tel: +44 (0) 131 220 9772

St Brides Partners (Public Relations Adviser)

Hugo de Salis

hugo@stbridespartners.co.uk

Tel: +44 (0) 20 7236 1177

Elisabeth Cowell

elisabeth@stbridespartners.co.uk

Tel: +44 (0) 20 7236 1177

Lottie Brocklehurst

lottie@stbridespartners.co.uk

Tel: +44 (0) 20 7236 1177

 

 

The information contained in this announcement was completed and reviewed by the Technical Director of Empyrean Energy Plc, Mr Frank Brophy BSc (Hons) who has over 40 years experience as a petroleum geologist.

 

Notes to Editors:

 

Empyrean Energy Plc is an AIM listed (Ticker: EME) profitable US on-shore oil, gas and condensate exploration, development and production company with assets in Texas and California. The Company's portfolio represents a mix of assets at various stages of development. Its flagship project is the Sugarloaf AMI in the prolific Eagle Ford Shale, Texas, where it has a 3% working interest in approximately 24,000 gross acres centrally positioned in the liquids rich sweet-spot within the field. Empyrean has an interest in 218 gross producing wells with full development expected to reach over 770 wells. Further development of the Eagle Ford Shale anticipated to require in the order of a further 300 wells, with down spacing potential of a further 200 wells. Further development of the Austin Chalk anticipated to require in the order of a further 300 wells, with down spacing potential of a further 235 wells. The Company has a term debt facility of up to US$50 million with Macquarie Bank, subject to reserve hurdles and drawdown approvals, in place in order to develop this acreage which is operated by US major Marathon Oil Company.

 

Other assets include a 58.084% interest in the Eagle Oil Pool Development Project located in the San Joaquin Basin, southern California, a proven oil and gas province. Empyrean's large working interest in this project provides the Company with flexibility and leverage with potential high impact from success. Additionally, Empyrean has a 7.5% interest in the Sugarloaf Block A operated by ConocoPhillips in the Eagle Ford Shale, and a 10% working interest in the Riverbend Project in Texas.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCSEISMFFISELI
Date   Source Headline
5th Apr 20247:00 amRNSDirector/PDMR Shareholding
28th Mar 20247:57 amRNSMako Gas Sale Key Terms Signed with PGN
23rd Feb 20247:39 amRNSMinisterial Approval of Mako Gas Price
13th Feb 20247:00 amRNSEmpyrean completes £700,000 Placing
31st Jan 20247:00 amRNSDuyung PSC Update
18th Dec 202311:34 amRNSInterim Results
20th Nov 20232:40 pmRNSChange of Nominated Adviser
27th Sep 202312:58 pmRNSResult of AGM
15th Sep 20237:00 amRNSIssue of Salary Sacrifice Shares
12th Sep 20237:13 amRNSKey Terms Agreed for Long-Term Gas Sales Agreement
4th Sep 20237:00 amRNSPosting of Annual Report and Notice of AGM
1st Sep 202312:30 pmRNSFinal Results
30th May 20237:36 amRNSCapital raising, Debt Restructure & Company Update
2nd May 20237:00 amRNSMako gas field - Update
4th Jan 20234:40 pmRNSSecond Price Monitoring Extn
4th Jan 20234:35 pmRNSPrice Monitoring Extension
3rd Jan 20234:40 pmRNSSecond Price Monitoring Extn
3rd Jan 20234:35 pmRNSPrice Monitoring Extension
20th Dec 20227:00 amRNSInterim Results
23rd Nov 20224:36 pmRNSPrice Monitoring Extension
8th Nov 20227:00 amRNSMako Gas - Approval of Updated Plan of Development
19th Oct 20221:19 pmRNSResults of General Meeting
27th Sep 202212:54 pmRNSResult of AGM
26th Sep 202212:01 pmRNSPosting of Annual Report and Notice of GM
16th Sep 20227:08 amRNSFinal Results
9th Sep 20227:00 amRNSMako Gas Project - Updated Plan of Development
2nd Sep 20229:04 amRNSPosting of Notice of Annual General Meeting
10th Jun 20227:00 amRNSSecond phase of exploration for Topaz Prospect
7th Jun 20227:00 amRNSChange of Registered Office Address
23rd May 20228:40 amRNSHolding(s) in Company
12th May 20224:41 pmRNSSecond Price Monitoring Extn
12th May 20224:36 pmRNSPrice Monitoring Extension
10th May 202211:45 amRNSCapital raising, drill analysis & debt restructure
4th May 20227:33 amRNSProposed drilling of Topaz Prospect
27th Apr 20227:00 amRNSJade well reached Total Depth
25th Apr 202211:59 amRNSHolding(s) in Company
21st Apr 20228:37 amRNSExercise of Warrants
19th Apr 20227:00 amRNSBlock 29/11, China - Jade drilling update
13th Apr 20227:43 amRNSDrilling update at Jade prospect
11th Apr 202212:32 pmRNSExercise of Warrants
11th Apr 20227:00 amRNSDrilling commences at Jade prospect
8th Apr 20229:55 amRNSExercise of Warrants
8th Apr 20227:00 amRNSBlock 29/11, China - NH9 rig on Jade location
4th Apr 20227:00 amRNSBlock 29/11, China – NH9 rig to mobilise
30th Mar 20228:16 amRNSBlock 29/11, China - Jade well update
28th Mar 20228:01 amRNSPartial Conversion of Convertible Note
25th Mar 20227:34 amRNSRig Mobilisation and Anticipated Spud Date
16th Mar 20229:52 amRNSPartial Conversion of Convertible Note
11th Mar 20227:42 amRNSBlock 29/11, China – Jade drilling update
10th Mar 20227:00 amRNSEmpyrean moves to SETS trading platform

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.