Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpyrean Regulatory News (EME)

Share Price Information for Empyrean (EME)

Share Price is delayed by 15 minutes
Get Live Data
0.05    0.00 (0.00%)
Bid:
0.045
Ask:
0.055
Spread: 0.01 (22.222%)
Market Cap: £2.86m
EME Live PriceLast checked at - London Stock Exchange

Intraday Empyrean Share Chart

Drilling Report

13 Apr 2006 09:57

Empyrean Energy PLC13 April 2006 Empyrean Energy PLC ("Empyrean" or the "Company"; Ticker: (EME)) Drilling Update β€’ Good oil shows encountered whilst drilling at Eagle North-1 in California, USA. β€’ Oil encountered is in the target lower Mary Bellocchi oil sands. AIM quoted Empyrean Energy PLC today announces the following update on the EagleNorth-1 well, California, USA:Victoria Petroleum NL as operator for the Eagle North-1 horizontal well in theEagle Oil Pool Development Project in the San Joaquin Basin advises that at 2300hours Central Pacific Time 12 April 2006, the current operation at Eagle North-1horizontal well was drilling ahead at 4,272 metres (14,015 feet) measured depthafter encountering oil shows in the target lower Mary Bellochi oil sand. The operator has advised good oil shows for the drilling conditions were firstseen in drill cuttings at 4,255 metres (13,960 feet ) measured depth (4,152metres TVD KB) and continue to be present. The forward plan is to drill another 25 metres to 4,293 metres (14,085 feet) andthen pull out of the hole to run 4 1/2 inch casing. The well bore is currentlyat an angle of 87 degrees from the vertical. With the Kreyengagen Shale behind the 41/2 inch liner, the Gatchell target oilsands will be drilled with a normal pressured water based KCL-Clarizan mudminimising formation invasion and maximing the evaluation of the oil bearingpotential of the oil sand. Following setting of the intermediate 41/2 inch liner, a 3 3/4 inch horizontalwell bore will then be drilled over a distance of 320 metres to within 30 metresof the Mary Bellocchi-1 oil well. This horizontal well bore will then becompleted for production with a 2 7/8 inch slotted production liner. A further update will be made as information becomes available. Executive Director - Tom Kelly commented "This type of oil show is extremelyencouraging and we look forward to being able to provide a further update as ourcompletion operations progress." The information contained in this announcement has been reviewed by theTechnical Director of Empyrean Energy Plc, Mr Frank Brophy BSc (Hons) who hasover 40 years experience as a petroleum geologist. For further information Laurence Read/ Angus Prentice Conduit PR Tel: +44 (0)207 429 6603 Mob: +44 (0)7974 982 512 Imran AhmadToby Howell HB-CorporateTel: +44(0)207 510 8600 Empyrean Energy plcTel : +44(0)207 932 2442 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
16th Jan 20207:11 amRNSEmpyrean raises £420,000
24th Dec 20199:03 amRNSInterim Results
24th Dec 20199:00 amRNS£10m Equity Placement Facility secured
22nd Nov 20197:45 amRNSDuyung PSC, Operational Update - Tambak -1
13th Nov 20197:00 amRNSDuyung PSC, Operational Update - Tambak -1
4th Nov 20198:00 amRNSOperational Update - Tambak -1 Well Spud
25th Oct 20197:15 amRNSDuyung PSC, Operational Update
15th Oct 20197:00 amRNSDuyung PSC, Ops Update - Tambak-2 Well reaches TD
4th Oct 20198:00 amRNSDuyung PSC, Ops Update - Tambak 2 Well Spud
26th Sep 20197:00 amRNSEmpyrean raises £365,580 before costs
24th Sep 20197:00 amRNSDuyung PSC, Operational Update
18th Sep 201911:28 amRNSGrant of Options and PDMR Notification
10th Sep 201910:45 amRNSResult of AGM
10th Sep 20198:00 amRNSCompany Presentation
19th Aug 20197:00 amRNSDuyung PSC, Operational Update
16th Aug 201910:30 amRNSNotice of AGM & Posting of Annual Report
9th Aug 20199:55 amRNSFinal Results
9th Jul 20198:00 amRNSExercise of Options
15th May 20197:00 amRNSFurther Exploration Risk Mitigation on China Block
29th Apr 20197:00 amRNSMako Gas Field appraisal & drill programme
17th Apr 20197:00 amRNSFirst Completion of Reduction of Duyung Interest
11th Mar 20197:00 amRNSPlan of Development Approval for Mako Gas Field
11th Feb 20197:00 amRNSReduction of Interest in Duyung for Cash & Shares
21st Jan 20197:25 amRNSIndependent Resource Audit of Mako Gas Field
21st Dec 20188:48 amRNSInterim Results
6th Dec 201812:26 pmRNSHolding(s) in Company
16th Nov 20188:11 amRNSA £1 Million Placement
9th Nov 20187:30 amRNSIndependent Oil in-place Estimates for Block 29/11
4th Oct 20189:46 amRNSDirector/PDMR Shareholding
1st Oct 20188:40 amRNSPetroleum Contract for Block 29/11 signed
5th Sep 201812:20 pmRNSResult of Annual General Meeting
5th Sep 20189:38 amRNSCompany Presentation
5th Sep 20187:00 amRNSThird-party Independent STOIIP Audit, Block 29/11
30th Aug 20187:00 amRNSAlvares 1 Testing and Operations Update
13th Aug 20187:38 amRNSIRS Tax Refund
10th Aug 20187:00 amRNSPosting of Annual Report and Notice of AGM
6th Aug 20187:00 amRNSFinal Results
3rd Aug 20187:46 amRNSOperations Update from Mako Gas Discovery
17th Jul 20187:37 amRNSTax refunds totalling $1.3 million
18th Jun 20187:50 amRNSOil Migration Study Completed - Block 29/11
6th Jun 20187:00 amRNS31% Uplift in Prospective Resources in Block 29/11
23rd May 20187:00 amRNSCommercial gas flows at ~1,200 mcfpd from Dempsey
8th May 20187:00 amRNSCommercial Gas Flows From Dempsey
3rd May 20189:10 amRNSHoldings in Company
16th Apr 20187:25 amRNSDempsey Testing Update
12th Mar 20187:10 amRNSDempsey Testing Update
8th Mar 20187:15 amRNSDempsey Production Testing to Resume
20th Feb 20182:45 pmRNSExercise of Options
30th Jan 201810:45 amRNSGrant of Options and PDMR Notification
17th Jan 20187:00 amRNSProduction & Sales from Dempsey Well Commences

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.