Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpyrean Regulatory News (EME)

Share Price Information for Empyrean (EME)

Share Price is delayed by 15 minutes
Get Live Data
0.0575    0.00 (0.00%)
Bid:
0.055
Ask:
0.06
Spread: 0.005 (9.091%)
Market Cap: £3.29m
EME Live PriceLast checked at - London Stock Exchange

Intraday Empyrean Share Chart

Acquisition

6 Apr 2006 07:00

Empyrean Energy PLC06 April 2006 Empyrean Energy PLC ("Empyrean" or the "Company"; Ticker: (EME)) Farm-in Agreement for Gas Exploration - Texas, USA • Acquisition of 6% working interest in the Sugarloaf Hosston Prospect, South Texas • Multi trillion cubic feet gas target - 0.97-2.3 TCF • Farm-in agreement with Texas Crude Energy, Inc (Operators) • Drilling scheduled for Q3 2006 AIM quoted Empyrean today announces that it will participate in the SugarloafHosston Prospect, South Texas, USA ("the Project") following a farm-in agreementwith local Houston based operator/explorer Texas Crude Energy, Inc. The Sugarloaf Hosston Prospect (Cretaceous) is a 20,000 acre 4-way closure withmulti trillion cubic feet ("TCF") gas potential in one of the most prolifichydrocarbon provinces in the world. An independent expert has estimated that theSugarloaf Hosston Prospect could contain a P50 (probability 50%) reserve of 0.97TCF gas, with the P10 assessment estimated at 2.3 TCF gas. Texas Crude Energy will be the operator of the project and plan to have aninitial well drilled to a total depth of 21,000 feet commencing during Q3 2006.The large anticlinal structure is well defined by some 24 lines of re-processed2D seismic data. The target Hosston Sands are in the lower cretaceous and arepredicted to occur at 17,000 feet. Drilling is estimated to take 110 days tothis depth. The terms of the agreement with Texas Crude Energy are for Empyrean to pay 7.5%of the costs of the initial well (including lease costs and operating expenses)until payout after which Empyrean's working interest reverts to 6.0% (4.26%NRI). The initial well is expected to cost a total of US$6 million with leasecosts and completion costs a further US$4 million. Empyrean's share of thisexpenditure is estimated at US$750,000. Commenting today Tom Kelly, Executive Director states "The participation in theSugarloaf Hosston Prospect allows Empyrean exposure to a potentially massive gasresource. The profile of this prospect is in line with our strategy to develophigh value energy projects in politically stable countries with high levels ofinfrastructure and healthy domestic energy markets. We look forward to seeingresults from the Project later this year once drilling commences in Q3 of 2006.This is an exciting and busy time for our company with horizontal completion atour Eagle Oil Pool Development Project in California underway and testing at theGlantal Gas Project in Germany commencing soon and drilling at the SugarloafHosston Prospect enhancing the portfolio." The information contained in this announcement has been reviewed by theTechnical Director of Empyrean Energy Plc, Mr Frank Brophy BSc (Hons) who hasover 40 years experience as a petroleum geologist. Laurence Read Toby Howell Conduit PR plc HB Corporate Tel: +44 (0) 207 429 6666 Tel: +44(0) 207 510 8600 Mob: +44 (0) 7979 955 923 Mob: +44 (0) 7775 895 579 Empyrean Energy Tel : +44(0) 207 932 2442 Appendix As previously announced : Eagle Oil Pool Development ProjectSan Joaquin Basin, California, USA ("the Project")Farm-in agreement with Australian Stock Exchange quoted Victoria Petroleum NL ("Vicpet"). The San Joaquin Basin in southern California is a proven oil and gas field thathas produced in excess of 12 billion barrels of oil and 11 trillion cubic feetof gas. The Eagle North-1 appraisal well is being drilled up dip from aprevious discovery well. An independent expert has estimated that the Eagle OilPool Development Project could contain a P50 (probability 50% unrisked) reserveof 7.1 million barrels of recoverable oil and 12.3 billion cubic feet ofassociated gas, with the P10 assessment estimated at 22.7 million barrels of oil and 22.7 billion cubic feet of associated gas. The Project is astructural-stratigraphic trap play targeting the Eocene aged Gatchell Sandformation. Horizontal completion drilling is underway following positive interpretation ofelectric logs that were conducted following drilling of the vertical well. Glantal Prospect, Neues Bergland permitFrankfurt, GermanyFarm-in agreement with Pannonian International Ltd ("Pannonian"), a wholly owned subsidiary of U.S.-based Galaxy Energy Corporation (OTC BB: GAXI) The highly prospective area of the Neues Bergland permit is located close to Frankfurt in Germany. The permit contains the Pfalzer Anticline which is a 515 square kilometre structure containing deep anthracitic coal beds overlaid by shale and sediment. The coal beds are too deep to mine economically but havebeen estimated by the independent expert to have a recoverable gas potentialof up to 6.2 Tcf in the first drilling prospect alone. The independent experthas calculated the smallest potential pay-zone has the potential to hold a recoverable 1.2 Tcf of gas. Electric logs from the Glantal-1 well (including FMI analysis) have beencompleted and a testing program is currently being finalized by the operator. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
5th Jun 20153:31 pmRNSHolding(s) in Company
21st May 20157:50 amRNSQ1 2015 Production Update from Sugarloaf AMI
27th Apr 201512:45 pmRNSHolding(s) in Company
8th Apr 201510:45 amRNSHedging contracts with Macquarie Bank Limited
1st Apr 20159:15 amRNSMacquarie Bank Facility Re-finance and drawdown
26th Mar 20158:00 amRNSQ4 2014 Production from Sugarloaf AMI, Texas
2nd Mar 20159:42 amRNSCorrection: Exercise of Options
2nd Mar 20159:15 amRNSExercise of Options
4th Feb 20159:53 amRNSForm 8.5 (EPT/NON-RI)
4th Feb 20157:50 amRNSUpdate on Strategic Review; Termination of FSP
30th Jan 20159:09 amRNSForm 8.5 (EPT/NON-RI)
28th Jan 20159:23 amRNSForm 8.5 (EPT/NON-RI)
27th Jan 20159:23 amRNSForm 8.5 (EPT/NON-RI)
26th Jan 20159:08 amRNSForm 8.5 (EPT/NON-RI)
23rd Jan 20151:27 pmRNSForm 8.3 - Empyrean Energy PLC
23rd Jan 201510:11 amRNSForm 8.5 (EPT/NON-RI)
22nd Jan 20159:47 amRNSForm 8.5 (EPT/NON-RI)
21st Jan 20159:15 amRNSForm 8.5 (EPT/NON-RI)
20th Jan 20159:37 amRNSForm 8.5 (EPT/NON-RI)
16th Jan 20151:52 pmRNSForm 8.3 - Empyrean Energy PLC
16th Jan 201511:54 amRNSForm 8.5 (EPT/NON-RI)
15th Jan 20159:45 amRNSForm 8.5 (EPT/NON-RI)
14th Jan 20156:29 pmRNSForm 8.3 - Empyrean Energy PLC
14th Jan 20155:27 pmRNSForm 8.3 - Empyrean Energy PLC
14th Jan 20154:47 pmRNSForm 8.3 - Empyrean Energy PLC
14th Jan 20159:26 amRNSForm 8.5 (EPT/NON-RI)
13th Jan 20159:56 amRNSForm 8.5 (EPT/NON-RI)
12th Jan 20155:19 pmRNSForm 8.3 - Empyrean Energy PLC
12th Jan 20159:28 amRNSForm 8.5 (EPT/NON-RI)
9th Jan 20159:49 amRNSForm 8.5 (EPT/NON-RI)
8th Jan 20153:49 pmRNSForm 8.3 - Empyrean Energy PLC
8th Jan 20159:25 amRNSForm 8.5 (EPT/NON-RI)
8th Jan 20157:00 amRNSRepays USD 2m of Macquarie Facility
7th Jan 20159:13 amRNSForm 8.5 (EPT/NON-RI)
6th Jan 201510:10 amRNSForm 8.5 (EPT/NON-RI)
30th Dec 20147:40 amRNSInterim Results
23rd Dec 201412:33 pmRNSForm 8.3 - Empyrean Energy PLC
23rd Dec 201410:07 amRNSForm 8.5 (EPT/NON-RI)
19th Dec 201411:25 amRNSForm 8.5 (EPT/NON-RI)
19th Dec 20147:00 amBUSForm 8.3 - Empyrean Energy plc
18th Dec 201410:32 amRNSForm 8.3 - Empyrean Energy PLC
17th Dec 201410:43 amRNSForm 8.5 (EPT/NON-RI)
15th Dec 201410:34 amRNSForm 8.5 (EPT/NON-RI)
12th Dec 20149:13 amRNSForm 8.5 (EPT/NON-RI)
11th Dec 201410:00 amRNSForm 8.5 (EPT/NON-RI)
11th Dec 20148:30 amRNSQ3 2014 Production from Sugarloaf AMI, Texas
10th Dec 201411:29 amRNSForm 8.5 (EPT/NON-RI)
9th Dec 201410:42 amRNSForm 8.3 - Empyrean Energy PLC
5th Dec 201412:16 pmRNSForm 8.3 - Empyrean Energy PLC
4th Dec 20148:35 amRNSForm 8.5 (EPT/NON-RI)

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.