The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksChina Nonferr Regulatory News (CNG)

  • This share is currently suspended. It was suspended at a price of 0.94

Share Price Information for China Nonferr (CNG)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.94
Bid: 0.00
Ask: 0.00
Change: 0.00 (0.00%)
Spread: 0.00 (0.00%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 0.94
CNG Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Exploration Update

8 Sep 2005 12:55

Kryso Resources PLC08 September 2005 8 September 2005 KRYSO RESOURCES plc PROGRESS REPORT Vassilios Carellas, Managing Director is pleased to announce that drilling hascommenced at the Pakrut Gold Deposit in Tajikistan. Drilling: Pakrut - One Hagby Onram 1000/3 drill rig ("Onram") has started drilling thefirst of two surface drill holes. The Longyear 38 drill is also on site in thePakrut Licence Area. The bulk of the drilling at Pakrut will be carried out fromunderground to allow for all year round drilling. The second Onram drill will betransferred to site shortly to further the underground drilling programme. Sulphidnoye - The Longyear 38 surface drill will be used to first drill a waterborehole for the camp to ensure a constant potable water supply, then the drillrig will be used to start exploration drilling at the Sulphidnoye prospect.Access has been re-established to Sulphidnoye prospect and drill pads are beingprepared. The initial part of the drill programme is designed to get a betterunderstanding of the geology of the prospect. Pakrut Camp: Secure storage facilities, and diesel and generator compounds are nowestablished on site. For storage and accommodation, 40-foot containers have beentransported to the camp and are currently being converted and winterised.A secure explosive store has been constructed and permission has been receivedto utilise, transport and store explosives; the compound will be guarded 24hours a day by police guards. Pakrut Underground Mine: The portal and access to 750m of the original Russian No. 1 adit has beenre-established and re-lined; the adit, closed for 25 years, is in remarkablygood condition. A second access entrance has been cleared for ventilation andsafety purposes. The bulk of the drilling will be carried out from this adit andits crosscuts. Laboratory: Most of the sample preparation equipment has now arrived in Dushanbe and isstored in the adjacent large holding store. The Atomic AbsorptionSpectrophotometer laboratory is complete and the instrument has been tested by aPerkin Elmer engineer. The adjacent sample digestion and the sample preparationlaboratories are nearing completion. Holding Store/Core Shed: Part of the 800m(2) holding store will be used for storage of drill core androck samples after all the remaining equipment has been transferred to site. General: The company now employs over 100 local staff including geological, drilling,mining, laboratory, stores and administration personnel; it has also moved to alarger office in Dushanbe. The total local salary cost per month is less thanUS$20,000. Feasibility Study: A firm of local environmental consultants has been appointed and have commencedwork to complete an environmental impact study for the feasibility study of thePakrut Gold Deposit. Key personnel from this company LLC "Ziderer" have obtainedtheir qualification in the United States and have previously completedenvironmental assessments for the United Nations and the World Bank inTajikistan. Three consultants from "Snowden Mining Industry Consultants" are arriving inDushanbe in mid-September as part of the on-going Feasibility Study. One is aresource geologist, who visited last year; the second, an environmentalscientist, who will set up the procedures for the environmental study; the thirdis a mining engineer and will be concerned with geotechnical aspects such asrock conditions during mining, and the establishment of a tailings dam. Contacts: Kryso Resources plcVassilios Carellas / Craig BrownTelephone: 020 7371 0600Mobile 07970 756352 / 07947 464188 Ruegg & Co LtdBrett MillerTelephone: 020 7584 3663 Hichens HarrisonChristian DennisTelephone: 020 7382 4473 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
24th Jul 20087:00 amPRNDrilling Report
23rd Jul 200812:45 pmPRNResult of AGM
7th Jul 20087:00 amPRNDrilling Report
27th Jun 20082:15 pmPRNAnnual Report and Accounts
27th Jun 200811:51 amPRNNotice of AGM
27th Jun 200811:33 amPRNFinal Results
25th Apr 200811:21 amPRNConvertible Loan Agreement
27th Mar 20081:39 pmPRNHolding(s) in Company
13th Feb 20087:01 amRNSPre-Feasibility Study Results
31st Jan 20087:00 amPRNChange of Adviser
11th Dec 20077:00 amPRNHukas Geophysical Survey Results
20th Nov 20077:00 amPRNUpdate of Resource Estimate
15th Nov 20072:08 pmPRNHolding(s) in Company
14th Nov 200711:37 amPRNHolding(s) in Company
13th Nov 20077:00 amPRNDrilling Update
31st Oct 200710:30 amPRNTotal Voting Rights
19th Oct 20079:35 amPRNHolding(s) in Company
8th Oct 20071:52 pmPRNIssue of Equity
3rd Oct 200710:41 amPRNIssue of Equity
1st Oct 20072:41 pmPRNIssue of Equity
27th Sep 200712:25 pmPRNChange of Registered Office
27th Sep 200712:09 pmPRNHolding(s) in Company
25th Sep 200711:35 amPRNHalf-yearly Report
14th Aug 200711:18 amPRNCompany Website
7th Aug 20079:44 amPRNHolding(s) in Company
9th Jul 20077:00 amPRNResult of AGM
2nd Jul 200710:09 amPRNDrilling Report
14th Jun 200710:11 amPRNCorrection : Notice of AGM
14th Jun 200710:02 amPRNCorrection : Final Results
14th Jun 20077:01 amPRNNotice of AGM
14th Jun 20077:01 amPRNMailing of Report & Accounts
14th Jun 20077:00 amPRNFinal Results
21st May 20078:00 amPRNKryso shares trade on PLUS
25th Apr 20079:30 amPRNDirectorate Change
20th Apr 200710:17 amPRNDirector/PDMR Shareholding
16th Apr 20079:30 amPRNGeophysical Survey to commence in May
23rd Mar 20072:09 pmPRNProgress Update
19th Mar 20077:00 amPRNPakrut Resource Estimate
14th Mar 200710:25 amPRNChange of Adviser
19th Feb 20077:00 amPRNDrilling Report
29th Dec 20068:45 amPRNTotal Voting Rights
21st Dec 200611:55 amPRNAdmission of new shares
20th Dec 20063:00 pmPRNPlacing of shares and warrants
26th Sep 20067:00 amPRNNotice of Results
25th Sep 20067:00 amPRNDrilling Report
4th Sep 200611:51 amPRNHolding(s) in Company
14th Aug 20069:28 amPRNNew Nickel Copper Licence
12th Apr 20061:04 pmRNSDrilling Report
9th Sep 200512:35 pmRNSHolding(s) in Company
8th Sep 200512:55 pmRNSExploration Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.