The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksChina Nonferr Regulatory News (CNG)

  • This share is currently suspended. It was suspended at a price of 0.94

Share Price Information for China Nonferr (CNG)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.94
Bid: 0.00
Ask: 0.00
Change: 0.00 (0.00%)
Spread: 0.00 (0.00%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 0.94
CNG Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Exploration Update

8 Sep 2005 12:55

Kryso Resources PLC08 September 2005 8 September 2005 KRYSO RESOURCES plc PROGRESS REPORT Vassilios Carellas, Managing Director is pleased to announce that drilling hascommenced at the Pakrut Gold Deposit in Tajikistan. Drilling: Pakrut - One Hagby Onram 1000/3 drill rig ("Onram") has started drilling thefirst of two surface drill holes. The Longyear 38 drill is also on site in thePakrut Licence Area. The bulk of the drilling at Pakrut will be carried out fromunderground to allow for all year round drilling. The second Onram drill will betransferred to site shortly to further the underground drilling programme. Sulphidnoye - The Longyear 38 surface drill will be used to first drill a waterborehole for the camp to ensure a constant potable water supply, then the drillrig will be used to start exploration drilling at the Sulphidnoye prospect.Access has been re-established to Sulphidnoye prospect and drill pads are beingprepared. The initial part of the drill programme is designed to get a betterunderstanding of the geology of the prospect. Pakrut Camp: Secure storage facilities, and diesel and generator compounds are nowestablished on site. For storage and accommodation, 40-foot containers have beentransported to the camp and are currently being converted and winterised.A secure explosive store has been constructed and permission has been receivedto utilise, transport and store explosives; the compound will be guarded 24hours a day by police guards. Pakrut Underground Mine: The portal and access to 750m of the original Russian No. 1 adit has beenre-established and re-lined; the adit, closed for 25 years, is in remarkablygood condition. A second access entrance has been cleared for ventilation andsafety purposes. The bulk of the drilling will be carried out from this adit andits crosscuts. Laboratory: Most of the sample preparation equipment has now arrived in Dushanbe and isstored in the adjacent large holding store. The Atomic AbsorptionSpectrophotometer laboratory is complete and the instrument has been tested by aPerkin Elmer engineer. The adjacent sample digestion and the sample preparationlaboratories are nearing completion. Holding Store/Core Shed: Part of the 800m(2) holding store will be used for storage of drill core androck samples after all the remaining equipment has been transferred to site. General: The company now employs over 100 local staff including geological, drilling,mining, laboratory, stores and administration personnel; it has also moved to alarger office in Dushanbe. The total local salary cost per month is less thanUS$20,000. Feasibility Study: A firm of local environmental consultants has been appointed and have commencedwork to complete an environmental impact study for the feasibility study of thePakrut Gold Deposit. Key personnel from this company LLC "Ziderer" have obtainedtheir qualification in the United States and have previously completedenvironmental assessments for the United Nations and the World Bank inTajikistan. Three consultants from "Snowden Mining Industry Consultants" are arriving inDushanbe in mid-September as part of the on-going Feasibility Study. One is aresource geologist, who visited last year; the second, an environmentalscientist, who will set up the procedures for the environmental study; the thirdis a mining engineer and will be concerned with geotechnical aspects such asrock conditions during mining, and the establishment of a tailings dam. Contacts: Kryso Resources plcVassilios Carellas / Craig BrownTelephone: 020 7371 0600Mobile 07970 756352 / 07947 464188 Ruegg & Co LtdBrett MillerTelephone: 020 7584 3663 Hichens HarrisonChristian DennisTelephone: 020 7382 4473 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
20th Apr 20153:28 pmBUSResignation of Non-Executive Chairman and Director
16th Apr 20157:00 amBUSOperational Update
31st Mar 20155:13 pmBUSChange of Adviser
19th Mar 20157:00 amBUSIssue of Equity
18th Feb 20157:00 amBUSDirectors' Dealings
17th Feb 20157:00 amBUSDirectors' Dealings
9th Feb 20157:00 amBUSOperational Update
28th Jan 20152:06 pmBUSHong Kong Listing Update
19th Jan 20157:00 amBUSDirectors' Dealings
6th Jan 20151:04 pmBUSHong Kong Listing Update
6th Nov 20144:40 pmRNSSecond Price Monitoring Extn
6th Nov 20144:35 pmRNSPrice Monitoring Extension
28th Oct 20141:13 pmBUSResult of AGM
6th Oct 20147:00 amBUSChina Nonferrous Gold Limited Notice of AGM, Proposals in Relation to Hong Kong Listing and Posting of Delisting Circular
2nd Oct 20143:55 pmBUSIssue of Equity
10th Sep 20142:11 pmBUSInterim Results for the Six-Month Period Ended 30 June 2014
10th Sep 20141:38 pmBUSFiling of Application Proof Prospectus and Update
2nd Sep 20143:23 pmBUSAward of Consultancy Contracts
7th Aug 20141:57 pmBUSHKEx Listing Update
30th Jun 20147:00 amBUSFinal Results
27th Jun 20149:10 amBUSExternal Power Supply Construction Contract
24th Jun 20141:59 pmBUSMine Construction Agreement
13th Jun 20149:43 amBUSDirectorate Change
12th May 20141:54 pmBUSTermination of Option
17th Apr 201411:59 amBUSExploration Licence
9th Apr 20147:00 amBUSIssue of Shares
11th Mar 20147:00 amBUSOperational Update
7th Mar 201412:15 pmBUSResult of Meeting
17th Feb 20147:00 amBUSPosting of Circular
18th Dec 20137:00 amBUSGrant of Options
21st Nov 20137:00 amBUSChange of Name Update
1st Nov 20137:00 amBUSChange of Name Update
29th Oct 20131:27 pmBUSResult of General Meeting and Change of Name
28th Oct 20137:00 amBUSAppointment of Sponsor for Proposed Hong Kong Listing
11th Oct 20139:19 amBUSChange of Name, Notice of General Meeting
30th Sep 20132:55 pmBUSProposed Change of Name and Board Changes
27th Sep 20137:00 amBUSInterim Results for the Six-Month Period Ended 30 June 2013
14th Aug 201310:43 amBUSAWARD OF CONTRACTS FOR FLOTATION CELLS, CRUSHERS AND BALL MILLS - Replacement
14th Aug 20139:35 amBUSMiscellaneous
8th Aug 201310:13 amBUSAWARD OF EXTERNAL POWER SUPPLY CONSTRUCTION CONTRACT
31st Jul 20138:00 amBUSAdmission to Trading on AIM
30th Jul 201312:56 pmBUSCourt Sanction of Scheme
30th Jul 20137:30 amRNSSuspension - Kryso Resources Plc
29th Jul 20139:53 amBUSTemporary Suspension
1st Jul 20137:00 amBUSResult of AGM
17th Jun 20137:00 amBUSSRK’s Independent Technical Report Endorses Updated BFS Compiled by BGRIMM
7th Jun 20135:10 pmBUSFinal Results
24th May 20131:18 pmBUSResults of Voting at Court Meeting and General Meeting
20th May 20131:55 pmBUSHolding(s) in Company
8th May 20137:36 amBUSIntroduction of a New Aim-Listed Holding Company, Incorporated in the Cayman Islands

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.