The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksChina Nonferr Regulatory News (CNG)

  • This share is currently suspended. It was suspended at a price of 0.94

Share Price Information for China Nonferr (CNG)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.94
Bid: 0.00
Ask: 0.00
Change: 0.00 (0.00%)
Spread: 0.00 (0.00%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 0.94
CNG Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Exploration Update

8 Sep 2005 12:55

Kryso Resources PLC08 September 2005 8 September 2005 KRYSO RESOURCES plc PROGRESS REPORT Vassilios Carellas, Managing Director is pleased to announce that drilling hascommenced at the Pakrut Gold Deposit in Tajikistan. Drilling: Pakrut - One Hagby Onram 1000/3 drill rig ("Onram") has started drilling thefirst of two surface drill holes. The Longyear 38 drill is also on site in thePakrut Licence Area. The bulk of the drilling at Pakrut will be carried out fromunderground to allow for all year round drilling. The second Onram drill will betransferred to site shortly to further the underground drilling programme. Sulphidnoye - The Longyear 38 surface drill will be used to first drill a waterborehole for the camp to ensure a constant potable water supply, then the drillrig will be used to start exploration drilling at the Sulphidnoye prospect.Access has been re-established to Sulphidnoye prospect and drill pads are beingprepared. The initial part of the drill programme is designed to get a betterunderstanding of the geology of the prospect. Pakrut Camp: Secure storage facilities, and diesel and generator compounds are nowestablished on site. For storage and accommodation, 40-foot containers have beentransported to the camp and are currently being converted and winterised.A secure explosive store has been constructed and permission has been receivedto utilise, transport and store explosives; the compound will be guarded 24hours a day by police guards. Pakrut Underground Mine: The portal and access to 750m of the original Russian No. 1 adit has beenre-established and re-lined; the adit, closed for 25 years, is in remarkablygood condition. A second access entrance has been cleared for ventilation andsafety purposes. The bulk of the drilling will be carried out from this adit andits crosscuts. Laboratory: Most of the sample preparation equipment has now arrived in Dushanbe and isstored in the adjacent large holding store. The Atomic AbsorptionSpectrophotometer laboratory is complete and the instrument has been tested by aPerkin Elmer engineer. The adjacent sample digestion and the sample preparationlaboratories are nearing completion. Holding Store/Core Shed: Part of the 800m(2) holding store will be used for storage of drill core androck samples after all the remaining equipment has been transferred to site. General: The company now employs over 100 local staff including geological, drilling,mining, laboratory, stores and administration personnel; it has also moved to alarger office in Dushanbe. The total local salary cost per month is less thanUS$20,000. Feasibility Study: A firm of local environmental consultants has been appointed and have commencedwork to complete an environmental impact study for the feasibility study of thePakrut Gold Deposit. Key personnel from this company LLC "Ziderer" have obtainedtheir qualification in the United States and have previously completedenvironmental assessments for the United Nations and the World Bank inTajikistan. Three consultants from "Snowden Mining Industry Consultants" are arriving inDushanbe in mid-September as part of the on-going Feasibility Study. One is aresource geologist, who visited last year; the second, an environmentalscientist, who will set up the procedures for the environmental study; the thirdis a mining engineer and will be concerned with geotechnical aspects such asrock conditions during mining, and the establishment of a tailings dam. Contacts: Kryso Resources plcVassilios Carellas / Craig BrownTelephone: 020 7371 0600Mobile 07970 756352 / 07947 464188 Ruegg & Co LtdBrett MillerTelephone: 020 7584 3663 Hichens HarrisonChristian DennisTelephone: 020 7382 4473 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
18th Feb 20137:00 amBUSUPDATE ON CONSTRUCTION OF PAKRUT GOLD PROJECT
8th Feb 20137:00 amBUSIssue of Equity
3rd Jan 201310:53 amBUSIssue of Shares
25th Oct 20126:13 pmBUSIssue of Shares
28th Sep 20122:27 pmBUSIssue of Shares
28th Sep 20122:01 pmBUSIssue of Shares
28th Sep 201212:23 pmBUSIssue of Options
19th Sep 20127:00 amBUSHalf-yearly Report
13th Sep 20124:29 pmBUSIssue of Shares
24th Aug 201211:20 amBUSMINE CONSTRUCTION AGREEMENT AWARDED
8th Aug 20126:00 pmBUSIssue of Equity
18th Jul 201212:14 pmBUSIssue of Equity
29th Jun 201211:22 amBUSResults of AGM, Changes to Directors' Offices
7th Jun 20127:00 amBUSFinal Results and Notice of AGM
25th May 20127:00 amBUSConfirmation of Debt Financing and Takeover Code
9th May 20127:00 amBUSTotal JORC Mineral Resource passes 5,000,000 oz Au
2nd Apr 20127:00 amBUSFurther Positive Drilling Results from the Pakrut Licensed Area
29th Mar 20121:53 pmBUSChange of Name of Nominated Advisor
2nd Mar 201210:58 amBUSIssue of Shares
14th Feb 20121:47 pmBUSPakrut Project Debt Financing Approved by Export - Import Bank of China
9th Jan 20127:00 amBUSIssue of Licence/Issue of Shares
23rd Dec 20117:00 amBUSIssue of Shares/Directors Dealing
11th Nov 20114:50 pmBUSIssue of Shares
10th Nov 20117:00 amBUSGovernment Approves Issue of Pakrut Mining Licence
9th Nov 20112:42 pmBUSIssue of Equity
8th Nov 20117:00 amBUSChange of Adviser
27th Oct 201111:57 amBUSHolding(s) in Company
19th Oct 201112:10 pmBUSHolding(s) in Company
18th Oct 201110:18 amBUSHolding(s) in Company
17th Oct 20117:00 amBUSIssue of Shares
14th Oct 201111:58 amBUSHolding(s) in Company
27th Sep 201111:10 amBUSHalf-yearly Report
1st Sep 201112:16 pmBUSOperational Update
9th Aug 201110:40 amBUSIssue of Equity
8th Jul 201112:37 pmBUSIssue of Shares
8th Jul 201111:41 amBUSIssue of Incentive Options
4th Jul 201111:39 amBUSChange of Registered Office
30th Jun 20111:21 pmBUSResult of AGM
24th Jun 20111:17 pmBUSIssue of Equity
9th Jun 20117:00 amBUSFinal Results
5th May 20112:27 pmBUSIssue of Equity
15th Apr 20117:00 amBUSTotal JORC Resources Increased
8th Apr 20117:00 amBUSChange of Nomad
31st Mar 20112:46 pmBUSTotal Voting Rights
24th Mar 20117:00 amBUSUpdate on progress and appointment of COO
22nd Mar 20117:00 amBUSDrilling Report
15th Mar 201112:42 pmBUSIssue of Shares
8th Mar 20117:00 amBUSOffer of Finance
4th Mar 20113:14 pmBUSIssue of Equity
4th Feb 20112:51 pmBUSIssue of Equity

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.