Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCloudified Holdings Limited Regulatory News (CHL)

  • This share is currently suspended. It was suspended at a price of 2.25

Share Price Information for Cloudified Holdings Limited (CHL)

Share Price is delayed by 15 minutes
Get Live Data
2.25    0.00 (0.00%)
Bid:
0.00
Ask:
0.00
Spread: 0.00 (0.00%)
Market Cap: £334.79k
CHL Live PriceLast checked at - London Stock Exchange

Intraday Cloudified Holdings Limited Share Chart

Project Update

10 Nov 2008 07:00

RNS Number : 7797H
Churchill Mining plc
10 November 2008
Β 

ο»Ώ

10thΒ November, 2008

CHURCHILL MINING PLC

("Churchill" or "the Company")

UPDATE ON FAST-TRACK TO PRODUCTION

NewΒ transport solution for Fast-TrackΒ productionΒ identified whichΒ may considerably decreaseΒ Capex requirements.

Increase in initial tonnage target inΒ first year up toΒ 3Β Mt and second yearΒ up toΒ 5 Mt.

Coal upgrading has potential to lift operational pre-tax profit by US$31 per tonne.Β 

Churchill Mining Plc, (AIM:CHL) the Indonesia focused mining company with a JORC resource of 1.4Β billion tonnes of thermal coal at its East Kutai Coal Project ("EKCP"), is pleased to announce significant progress on the transport options it isΒ finalising in order to Fast-Track the project to production inΒ Q4Β 2009.

New independent studies verified by the Company have concluded that a combination of road and river barge transport is now possible and should be the most capital cost-effective and quickest initial access methodΒ toΒ transportΒ the coal from site for the Fast-Track production scenario.

The new studies involvedΒ Side Scan Sonar, LIDAR aerial surveyΒ andΒ aΒ condition surveyΒ of the river. ThisΒ concludedΒ that access toΒ theΒ SenyiurΒ River, which is a tributary of theΒ MahakamΒ RiverΒ south of the EKCP,Β can be used to transport the coal downΒ toΒ theΒ MahakamΒ RiverΒ for transhipment and onto multi-user coal ports at the coast.Β Β This accessΒ routeΒ was previously thought to be restricted. The newly surveyedΒ SenyiurΒ RiverΒ route could enable shipping of up toΒ 7 Mtpa of coal, starting withΒ delivery of up toΒ 3Β Mtpa,Β which isΒ the increased targetΒ forΒ the first full year of production.

Currently,Β aΒ newΒ multi-user coal barge port is being built on theΒ SenyiurΒ RiverΒ by a third party.Β Β Churchill management is in discussions with the company constructing thisΒ river bargeΒ port to gain access to the facility, which would result in a significant reduction in capital expenditure for Churchill.Β Β The Company is also in discussions with the owners of current and proposed multi-user coal ports on the coast, which if access is gained, will also add significant further reductions to Churchill's project capital costs.Β 

The Company continues its detailed work on a number of optionsΒ forΒ the 20 mtpaΒ Full-Production scenario,Β to transport the coal to a new dedicated port, including a conveyor system.Β 

Infill drilling continues on site and is on target to upgrade much of theΒ 1.42 Bt of coal resource toΒ 'mineable' by the end ofΒ 2008.

Churchill recently launched a review into coalΒ treatment processes that have the potential to move the energy content of EKCP's thermal coal from the current range of kcal 4700 - 5600 ADB (Air Dried Basis) to over kcal 6000.Β Β This would enable the Company to achieveΒ higherΒ pricingΒ termsΒ for its thermal coal.

Β 

Churchill's examination of processes to upgradeΒ the EKCPΒ thermalΒ coalΒ has determined that theΒ coal sale priceΒ assumptionsΒ in theΒ Company'sΒ businessΒ modelΒ could be increasedΒ from US$50 per tonne to US$84 per tonne (in theΒ current priceΒ environment) at an operational cost of US$3Β per tonne.

Churchill Managing Director Paul Mazak commented:

"The various elements of the EKCP are fitting together in a way that should significantly increase the bottom line, especially by upgrading at least part of the coal production to achieve a higher value per tonne. Churchill's technical team is in the process of finalising their assessment of the available upgrading technologies and it is envisaged that at least one of these plants will be on-stream during the first year of full production."

Mr John Clayton, Technical DirectorΒ ofΒ Churchill Mining PLC, is the qualified person that has reviewed the technical information contained in this release.

Churchill Mining Plc

Managing Director -Β PaulΒ G.Β Mazak

+62 81510539186 / + 62 21 39832398Β 

paul.mazak@churchillmining.com

Blue Oar SecuritiesΒ 

Romil Patel

+44(0)20 7448 4000

OllyΒ Cairns

+61 (0)8 6430 1631

Pelham PR

Candice Sgroi

+44 (0) 20Β 7743 6376

Notes to editors

Churchill Mining Plc listed on AIM in April 2005.Β 

East Kutai Coal Project

In May 2007 Churchill announced a sales agreement had been entered into to purchase a 75% interest in the East Kutai Coal Project from PT Techno Coal Utama. Churchill has now extended the size of the project by 200 square kilometres by acquiring a 75% interest in the abutting tenements to the west of EKCP from the Investmine Group ofΒ Indonesia. Exploration and resource drilling continue along with scoping and pre-feasibility work.Β 

This updated JORC Resource Statement defining 1.4 billion tonnes of coal resources substantially surpasses the amount of coal that was expected to be confirmed by the end of 2008.

The various JORC (Joint Ore Reserve Committee) Resource categories are defined as follows:

A Mining Reserve:Β the economically mineable part of a Measured Resource and takes into consideration variables outside of the geological continuity including; mining method, processing, economics, marketing, legal, environmental, social and governmental factorsΒ 

Measured Resource:Β can be estimated with a high level of confidence with the sample locations spaced closely enough to confirm geological and grade continuity.

Indicated Resource:Β can be estimated with a reasonable level of confidence, with the sample locations spaced too widely apart to confirm geological and/or grade continuity but are spaced closely enough for continuity to be assumed.

Inferred Resource:Β can be estimated with a low level of confidence, being inferred from geological evidence and assumed but nor verified geological and grade continuity.Β 

The aim of any exploration and drilling programme is to move the maximum number of tonnes sitting in the Inferred and Indicated Resources categories up to the Measured Resource category and eventually into a Mining Reserve, by continually updating the geological model and other aspects, through additional drilling and other geological exploration work.Β 

Sendawar - CBMΒ 

The Sendawar CBM project inΒ Kalimantan,Β Indonesia, covers more than 800 square kilometres of prospective ground and lies in close proximity to two operating open-cut coal mines. The project is located approximately 50Β km from theΒ MahakamΒ River.Β 

During Churchill's coal exploration programme, data collected during geophysical and resistivity work, along with data collected from previous oil and gas exploration in the area, indicated that the area was highly prospective for Coal Bed Methane. Churchill (70% of the CBM project) along with its Indonesian partner RMU (30%) were grantedΒ Indonesia's first CBM JEA license in September 2007. The CBM project has the potential to host Gas-in-Place of 5.6 trillion cubic feet. Churchill is currently conducting further studies on the CBM project before starting detailed field work.

South Woodie Woodie

Given the increased prospectivity of South Woodie Woodie and Churchill's increasing focus on its Indonesian coal and coal bed methane projects, the Company sold 80% of the project to Australian company Spitfire Resources Limited ("Spitfire").

Spitfire, which listed on the ASX on the 12thΒ December 2007, has the option to purchase the remaining equity in the project but must spend AUD$1.5 million on exploration. Aside from its large shareholding in Spitfire, Churchill also retains a price-indexed mining royalty over the South Woodie Woodie project.

The South Woodie Woodie project covers approximately 490 square kilometres (with a further 899 square kilometres under application) in the East Pilbara region ofΒ Western Australia, and sits approximately 400Β km southeast of Port Hedland in the highly prospective Pilbara manganese province. Spitfire has identified multiple drill targets and shall begin its new drill programme shortly.

In March 08 Spitfire announced that it had secured the strategic support of the diversified Norwegian-based industrial, trading and metals & alloys group,Β Tinfos ASΒ ("Tinfos"), as its new major shareholder via a share placement.

This information is provided by RNS
The company news service from the London Stock Exchange
Β 
END
Β 
Β 
MSCIIFSSLALILIT
Date   Source Headline
5th May 200910:27 amRNSSpitfire Resources Limited Update
30th Apr 20097:00 amRNSExercise of Options
21st Apr 20097:00 amRNSPotential Supply Agreement
17th Apr 20093:46 pmRNSDirectorate Change
27th Mar 20097:00 amRNSHalf Yearly Report
23rd Mar 200911:24 amRNSHolding(s) in Company
20th Mar 20097:00 amRNSAppointment of New Director
5th Mar 20097:00 amRNSProject Update
4th Feb 20097:00 amRNSResponse to recent share price rally
27th Jan 200910:37 amRNSHolding(s) in Company
15th Jan 20099:54 amRNSSpitfire resources update
12th Jan 20097:00 amRNSHeads of Agreement signed with Leighton
19th Dec 20089:40 amRNSUpdate on New Indonesian Mining Laws
12th Dec 200811:07 amRNSResult of AGM
8th Dec 20088:44 amRNSHolding(s) in Company
8th Dec 20087:00 amRNSProject Update
4th Dec 20081:58 pmRNSHolding(s) in Company
28th Nov 20089:48 amRNSHolding(s) in Company
26th Nov 20088:54 amRNSHolding(s) in Company
25th Nov 20088:50 amRNSHolding(s) in Company
21st Nov 20089:17 amRNSHolding(s) in Company
17th Nov 200811:05 amRNSHolding(s) in Company
17th Nov 20088:37 amRNSHolding(s) in Company
17th Nov 20088:36 amRNSNotice of AGM and Posting of Accounts
10th Nov 20087:00 amRNSProject Update
28th Oct 20083:01 pmRNSHolding(s) in Company
27th Oct 20087:00 amRNSFinal Results
23rd Oct 20089:06 amRNSHolding(s) in Company
20th Oct 200810:38 amRNSHolding(s) in Company
15th Oct 20087:00 amRNSEast Kutai Coal Project Update
6th Oct 200810:08 amRNSHolding(s) in Company
1st Oct 20081:43 pmRNSHolding(s) in Company
1st Oct 200811:19 amRNSHolding(s) in Company
29th Sep 200810:29 amRNSHolding(s) in Company
22nd Sep 200811:58 amRNSHolding(s) in Company
22nd Sep 20087:00 amRNSHolding(s) in Company
22nd Sep 20087:00 amRNSHolding(s) in Company
17th Sep 200811:50 amRNSHolding(s) in Company
10th Sep 20089:39 amRNSHolding(s) in Company
9th Sep 200812:25 pmRNSHolding(s) in Company
5th Sep 20087:00 amRNSResource Update
28th Aug 200810:13 amRNSRelease schedule of JORC upda
12th Aug 200812:08 pmRNSAppointment of Technical Dire
7th Aug 200811:49 amRNSExercise of Options and Total
28th Jul 20087:00 amRNSDrilling Report
15th Jul 200812:30 pmRNSHolding(s) in Company
9th Jul 20087:00 amRNSDrilling Update
7th Jul 20089:29 amRNSExercise of Options
4th Jul 20089:28 amRNSHolding(s) in Company
1st Jul 200812:21 pmRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.