Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCloudified Holdings Limited Regulatory News (CHL)

Share Price Information for Cloudified Holdings Limited (CHL)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 4.00
Bid: 3.00
Ask: 5.00
Change: 0.00 (0.00%)
Spread: 2.00 (66.667%)
Open: 4.00
High: 4.00
Low: 4.00
Prev. Close: 4.00
CHL Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

East Kutai Coal Project Update

15 Oct 2008 07:00

RNS Number : 8545F
Churchill Mining plc
15 October 2008
 



15th October, 2008 CHL:AIM

CHURCHILL MINING PLC

("Churchill" or "the Company")

UPDATE ON EAST KUTAI COAL PROJECT & COMPANY FINANCES

Churchill Mining Plc, the Indonesia focussed mining company with a JORC resource of 1.4bn tonnes of thermal coal at its East Kutai Coal Project ("EKCP"), is pleased to provide an update on the project including the expansion of the feasibility study to accelerate bringing the project into production.

Fast Track Production Priority

The Company has progressed well in fast tracking the development programme for the East Kutai Coal Project to bring the first stage of the mine into production by the end of Q4 2009.

To that end, heavy equipment has been brought into the area to clear access and speed up the drilling programme. In addition to this, to complete the intense in-fill drilling programme ahead of schedule, all drill rigs have been moved to the mine pit. This phase of the drilling programme will also include the aerial survey of the resource area in order to convert the inferred resource to the measured category.

Project Finance and Cash

Churchill has a strong balance sheet position with £7.2m of cash in the bank. The directors believe that this will enable the Company to complete its present programme which has already resulted in significant exploration results and the expectation that the project can be brought into production ahead of its original schedule.

Even in light of the fast tracking of the EKCP development programme, the Company's expenditure rate has been less than budgeted due to the consistency and efficiency of the exploration programme.

On completion of the feasibility study, further capital will be required by the Company to bring the project into productionIn addition to discussions with three international investment banks regarding project finance, Churchill's Managing Director and technical staff are accompanying a number of non-banking investment and coal groups to the EKCP site during October, as part of their due diligence investigations on the project. The Directors are confident that production capex funding will be available to the Company and further announcements will be made when negotiations and agreements are finalised.

Additional Haulage and Infrastructure Options

The feasibility study is progressing well with the appointment of Technical Director John Clayton to manage the process. In light of the large resource tonnage and the potential life of mine reserve being much higher than originally anticipated, Churchill is assessing a number of haulage options and routes. These options include opening discussions with other potential users of such infrastructure in the region and the building or utilisation of multi-user port and transport facilities. 

Under Mr Clayton's direction, the Company is completing much of the preliminary feasibility work in-house. Engineering firms and construction companies have been short-listed for the next phase of the project development and an appointment will be made in due course.

Coal Enhancement

The Company will be investigating a number of treatment processes that have the potential to move the energy content of EKCP's thermal coal from the current range of kcal 4700 - 5600 ADB (Air Dried Basis) to over kcal 6000. This would enable the Company to achieve additional pricing for its thermal coal. A decision on whether to proceed with this enhancement process will be made in due course.

Paul Mazak, Managing Director of Churchill Mining commented: 

"Not withstanding the current global financial turmoil, there is still plenty of capital available for the right projects in the right sector, with investments into coal and energy at the top of the list. Churchill has been working with a number of diverse parties in regard to potential joint ventures, off-take agreements and the funding of the EKCP mine and infrastructure development; many of whom are now visiting Jakarta and the project site with their advisors. The Company will work with these interested parties with the aim of selecting a partner who not only provides a solid financial backing for the project but also provides the greatest upside for Churchill and its shareholders."

 

Enquiries:

Churchill Mining Plc

Managing Director - Paul G. Mazak

+62 81510539186 / + 62 21 39832398 

paul.mazak@churchillmining.com

Blue Oar Securities 

Romil Patel

+44(0)20 7448 4400

Olly Cairns

+61 (0)8 6430 1631

Pelham Public Relations

Candice Sgroi

+44 (0)207 743 6376

Candice.Sgroi@pelhampr.com

Notes to editors

Churchill Mining Plc listed on AIM in April 2005. 

East Kutai Coal Project

In May 2007 Churchill announced a sales agreement had been entered into to purchase a 75% interest in the East Kutai Coal Project from PT Techno Coal Utama. Churchill has now extended the size of the project by 200 square kilometres by acquiring a 75% interest in the abutting tenements to the west of EKCP from the Investmine Group of Indonesia. Exploration and resource drilling continue along with scoping and pre-feasibility work. 

EKCP has a JORC compliant resource of 1.4 billion tonnes, on only 20% of the coal target area drilled, substantially surpassing the amount of coal that was expected to be confirmed by the end of 2008.

Sendawar - CBM 

The Sendawar CBM project in KalimantanIndonesia, covers more than 800 square kilometres of prospective ground and lies in close proximity to two operating open-cut coal mines. The project is located approximately 50km from the Mahakam River

During Churchill's coal exploration programme, data collected during geophysical and resitivity work, along with data collected from previous oil and gas exploration in the area, indicated that the area was highly prospective for Coal Bed Methane. Churchill (70% of the CBM project) along with its Indonesian partner RMU (30%) were granted Indonesia's first CBM JEA license in September 2007. The CBM project has the potential to host Gas-in-Place of 5.6 trillion cubic feet. Churchill is currently conducting further studies on the CBM project before starting detailed field work.

South Woodie Woodie

Given the increased prospectivity of South Woodie Woodie and Churchill's increasing focus on its Indonesian coal and coal bed methane projects, the Company sold 80% of the project to Australian company Spitfire Resources Limited ("Spitfire").

Spitfire, which listed on the ASX on the 12th December 2007, has the option to purchase the remaining equity in the project but must spend AUD$1.5 million on exploration. Aside from its large shareholding in Spitfire, Churchill also retains a price-indexed mining royalty over the South Woodie Woodie project.

The South Woodie Woodie project covers approximately 490 square kilometres (with a further 899 square kilometres under application) in the East Pilbara region of Western Australia, and sits approximately 400km southeast of Port Hedland in the highly prospective Pilbara manganese province. Spitfire has identified multiple drill targets and shall begin its new drill programme shortly.

In March 08 Spitfire announced that it had secured the strategic support of the diversified Norwegian-based industrial, trading and metals & alloys group, Tinfos AS ("Tinfos"), as its new major shareholder via a share placement.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCMIBFTMMTBBLP
Date   Source Headline
1st May 20249:03 amRNSHolding(s) in Company
30th Apr 20247:30 amRNSRestoration - Cloudified Holdings Limited
30th Apr 20247:00 amRNSInterim results
29th Apr 20248:30 amRNSNotice of Interim Result & Restoration of Trading
3rd Apr 20248:29 amRNSRetirement of Director
28th Mar 202411:42 amRNSUpdate
28th Mar 202411:37 amRNSFinal Results
12th Dec 20232:43 pmRNSCompletion of the Disposal & Directorate Changes
7th Jun 201712:00 pmRNSCancellation of AIM admission
16th May 20178:00 amRNSUpdate on Annulment Application
19th Apr 20179:00 amRNSFurther re Annulment Application
6th Apr 20179:00 amRNSBlock Listing Six Monthly Return
4th Apr 20178:15 amRNSFurther re Annulment Application and suspension
31st Mar 201710:00 amRNSHalf Yearly Report and Annulment Application
16th Mar 20178:00 amRNSBlock Listing Six Monthly Return
28th Feb 201711:45 amRNSUpdate
31st Jan 20178:23 amRNSUpdate
23rd Dec 20162:00 pmRNSUpdate
23rd Dec 20167:00 amRNSBlock Listing Six Monthly Return
7th Dec 20168:45 amRNSChurchill's claim against Indonesia struck out
6th Dec 20167:30 amRNSSuspension - Churchill Mining Plc
2nd Dec 20167:00 amRNSTiming of ICSID decision and temporary suspension
1st Dec 201611:52 amRNSResult of AGM
30th Nov 201611:00 amRNSTotal Voting Rights
30th Nov 20167:50 amRNSICSID Arbitration Update
29th Nov 20167:00 amRNSICSID Arbitration Update
16th Nov 20164:41 pmRNSSecond Price Monitoring Extn
16th Nov 20164:35 pmRNSPrice Monitoring Extension
16th Nov 20162:28 pmRNSICSID Arbitration Update
7th Nov 20167:40 amRNSHolding(s) in Company
7th Nov 20167:40 amRNSHolding(s) in Company
3rd Nov 201610:41 amRNSDirector Shareholding
2nd Nov 20168:00 amRNSPosting of Annual Report and AGM Notice
19th Oct 20162:24 pmRNSFinal Results
11th Oct 20168:57 amRNSBlock Listing Six Monthly Return
6th Oct 20167:00 amRNSBlock Listing Six Monthly Return
15th Sep 20168:00 amRNSBlock listing six monthly return
12th Sep 201612:37 pmRNSICSID Arbitration Update
12th Aug 20169:12 amRNSDirector/PDMR Shareholding
29th Jul 20167:00 amRNSTotal Voting Rights
1st Jul 20163:00 pmRNSIssue of Shares
23rd Jun 20168:00 amRNSBlock listing six monthly return
21st Jun 20169:53 amRNSFurther re forgery dismissal application timing
17th Jun 201612:03 pmRNSUpdate on forgery dismissal application
6th May 20169:30 amRNSResult of General Meeting
5th May 20161:30 pmRNSUpdate on Indonesia's default in ICSID proceedings
29th Apr 201610:00 amRNSTotal Voting Rights
20th Apr 201612:39 pmRNSUpdate on Indonesia's default in ICSID proceedings
14th Apr 20164:40 pmRNSSecond Price Monitoring Extn
14th Apr 20164:35 pmRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.