Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCloudified Holdings Limited Regulatory News (CHL)

  • This share is currently suspended. It was suspended at a price of 2.25

Share Price Information for Cloudified Holdings Limited (CHL)

Share Price is delayed by 15 minutes
Get Live Data
2.25    0.00 (0.00%)
Bid:
0.00
Ask:
0.00
Spread: 0.00 (0.00%)
Market Cap: £334.79k
CHL Live PriceLast checked at - London Stock Exchange

Intraday Cloudified Holdings Limited Share Chart

Project Update

10 Nov 2008 07:00

RNS Number : 7797H
Churchill Mining plc
10 November 2008
 



10th November, 2008

CHURCHILL MINING PLC

("Churchill" or "the Company")

UPDATE ON FAST-TRACK TO PRODUCTION

New transport solution for Fast-Track production identified which may considerably decrease Capex requirements.

Increase in initial tonnage target in first year up to 3 Mt and second year up to 5 Mt.

Coal upgrading has potential to lift operational pre-tax profit by US$31 per tonne. 

Churchill Mining Plc, (AIM:CHL) the Indonesia focused mining company with a JORC resource of 1.4 billion tonnes of thermal coal at its East Kutai Coal Project ("EKCP"), is pleased to announce significant progress on the transport options it is finalising in order to Fast-Track the project to production in Q4 2009.

New independent studies verified by the Company have concluded that a combination of road and river barge transport is now possible and should be the most capital cost-effective and quickest initial access method to transport the coal from site for the Fast-Track production scenario.

The new studies involved Side Scan Sonar, LIDAR aerial survey and a condition survey of the river. This concluded that access to the Senyiur River, which is a tributary of the Mahakam River south of the EKCPcan be used to transport the coal down to the Mahakam River for transhipment and onto multi-user coal ports at the coast This access route was previously thought to be restricted. The newly surveyed Senyiur River route could enable shipping of up to 7 Mtpa of coal, starting with delivery of up to 3 Mtpa, which is the increased target for the first full year of production.

Currently, a new multi-user coal barge port is being built on thSenyiur River by a third party Churchill management is in discussions with the company constructing this river barge port to gain access to the facility, which would result in a significant reduction in capital expenditure for Churchill.  The Company is also in discussions with the owners of current and proposed multi-user coal ports on the coast, which if access is gained, will also add significant further reductions to Churchill's project capital costs. 

The Company continues its detailed work on a number of options for the 20 mtpa Full-Production scenario, to transport the coal to a new dedicated port, including a conveyor system. 

Infill drilling continues on site and is on target to upgrade much of the 1.42 Bt of coal resource to 'mineable' by the end of 2008.

Churchill recently launched a review into coal treatment processes that have the potential to move the energy content of EKCP's thermal coal from the current range of kcal 4700 - 5600 ADB (Air Dried Basis) to over kcal 6000.  This would enable the Company to achieve higher pricing terms for its thermal coal.

 

Churchill's examination of processes to upgrade the EKCP thermal coal has determined that the coal sale price assumptions in the Company's business model could be increased from US$50 per tonne to US$84 per tonne (in the current price environment) at an operational cost of US$3 per tonne.

Churchill Managing Director Paul Mazak commented:

"The various elements of the EKCP are fitting together in a way that should significantly increase the bottom line, especially by upgrading at least part of the coal production to achieve a higher value per tonne. Churchill's technical team is in the process of finalising their assessment of the available upgrading technologies and it is envisaged that at least one of these plants will be on-stream during the first year of full production."

Mr John Clayton, Technical Director of Churchill Mining PLC, is the qualified person that has reviewed the technical information contained in this release.

Churchill Mining Plc

Managing Director - Paul G. Mazak

+62 81510539186 / + 62 21 39832398 

paul.mazak@churchillmining.com

Blue Oar Securities 

Romil Patel

+44(0)20 7448 4000

Olly Cairns

+61 (0)8 6430 1631

Pelham PR

Candice Sgroi

+44 (0) 20 7743 6376

Notes to editors

Churchill Mining Plc listed on AIM in April 2005. 

East Kutai Coal Project

In May 2007 Churchill announced a sales agreement had been entered into to purchase a 75% interest in the East Kutai Coal Project from PT Techno Coal Utama. Churchill has now extended the size of the project by 200 square kilometres by acquiring a 75% interest in the abutting tenements to the west of EKCP from the Investmine Group of Indonesia. Exploration and resource drilling continue along with scoping and pre-feasibility work. 

This updated JORC Resource Statement defining 1.4 billion tonnes of coal resources substantially surpasses the amount of coal that was expected to be confirmed by the end of 2008.

The various JORC (Joint Ore Reserve Committee) Resource categories are defined as follows:

A Mining Reserve: the economically mineable part of a Measured Resource and takes into consideration variables outside of the geological continuity including; mining method, processing, economics, marketing, legal, environmental, social and governmental factors 

Measured Resource: can be estimated with a high level of confidence with the sample locations spaced closely enough to confirm geological and grade continuity.

Indicated Resource: can be estimated with a reasonable level of confidence, with the sample locations spaced too widely apart to confirm geological and/or grade continuity but are spaced closely enough for continuity to be assumed.

Inferred Resource: can be estimated with a low level of confidence, being inferred from geological evidence and assumed but nor verified geological and grade continuity. 

The aim of any exploration and drilling programme is to move the maximum number of tonnes sitting in the Inferred and Indicated Resources categories up to the Measured Resource category and eventually into a Mining Reserve, by continually updating the geological model and other aspects, through additional drilling and other geological exploration work. 

Sendawar - CBM 

The Sendawar CBM project in KalimantanIndonesia, covers more than 800 square kilometres of prospective ground and lies in close proximity to two operating open-cut coal mines. The project is located approximately 50 km from the Mahakam River

During Churchill's coal exploration programme, data collected during geophysical and resistivity work, along with data collected from previous oil and gas exploration in the area, indicated that the area was highly prospective for Coal Bed Methane. Churchill (70% of the CBM project) along with its Indonesian partner RMU (30%) were granted Indonesia's first CBM JEA license in September 2007. The CBM project has the potential to host Gas-in-Place of 5.6 trillion cubic feet. Churchill is currently conducting further studies on the CBM project before starting detailed field work.

South Woodie Woodie

Given the increased prospectivity of South Woodie Woodie and Churchill's increasing focus on its Indonesian coal and coal bed methane projects, the Company sold 80% of the project to Australian company Spitfire Resources Limited ("Spitfire").

Spitfire, which listed on the ASX on the 12th December 2007, has the option to purchase the remaining equity in the project but must spend AUD$1.5 million on exploration. Aside from its large shareholding in Spitfire, Churchill also retains a price-indexed mining royalty over the South Woodie Woodie project.

The South Woodie Woodie project covers approximately 490 square kilometres (with a further 899 square kilometres under application) in the East Pilbara region of Western Australia, and sits approximately 400 km southeast of Port Hedland in the highly prospective Pilbara manganese province. Spitfire has identified multiple drill targets and shall begin its new drill programme shortly.

In March 08 Spitfire announced that it had secured the strategic support of the diversified Norwegian-based industrial, trading and metals & alloys group, Tinfos AS ("Tinfos"), as its new major shareholder via a share placement.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCIIFSSLALILIT
Date   Source Headline
15th Nov 20107:00 amRNSNotice of AGM & Annual Report
3rd Nov 20108:00 amRNSNominated adviser change of name
3rd Nov 20107:00 amRNSAnnual Financial Report
23rd Sep 20107:00 amRNSEKCP Feasibility Study
3rd Sep 201010:36 amRNSStatement re Press Speculation
1st Jul 20107:00 amRNSEast Kutai Coal Project Update
18th Jun 20107:00 amRNSDirect Ownership of License Area
8th Jun 20104:47 pmRNSHolding(s) in Company
8th Jun 201010:36 amRNSHolding(s) in Company
8th Jun 201010:12 amRNSHolding(s) in Company
3rd Jun 201010:52 amRNSTotal Voting Rights
26th May 20107:00 amRNSPlacing to raise GBP 16.1 million & Mining Reserve
12th May 20107:00 amRNSAppointment of CFO & formation of Advisory Board
26th Apr 20107:00 amRNSMOU signed with PLN subsidiary
19th Apr 20107:00 amRNSAppointment of Credit Suisse as Strategic Advisor
31st Mar 20109:34 amRNSExercise of options and Total Voting Rights
31st Mar 20109:34 amRNSExercise of Options by Director
29th Mar 20107:00 amRNSInterim Results
25th Feb 20104:02 pmRNSHolding(s) in Company
24th Feb 20107:00 amRNSProject Update
16th Feb 20109:56 amRNSHolding(s) in Company
29th Jan 201010:51 amRNSHolding(s) in Company
18th Dec 200912:29 pmRNSResult of AGM
15th Dec 20097:00 amRNSProject Update
10th Dec 200912:41 pmRNSAppointment of Advisors
7th Dec 20093:21 pmRNSHolding(s) in Company
20th Nov 20097:00 amRNSNotice of AGM and Posting of Accounts
18th Nov 200911:34 amRNSHolding(s) in Company
18th Nov 200911:29 amRNSHolding(s) in Company
17th Nov 20097:00 amRNSExercise of Options & Total Voting Rights
12th Nov 200912:16 pmRNSHolding(s) in Company
9th Nov 20093:43 pmRNSHolding(s) in Company
6th Nov 20093:09 pmRNSAssignment of Options by Director
26th Oct 20097:00 amRNSInitial Mining Reserve Statement
22nd Oct 20097:00 amRNSFinal Results
9th Oct 200912:52 pmRNSTiming of Mining Reserve Statement
1st Oct 20099:47 amRNSExercise of options and Total Voting Rights
29th Sep 200910:21 amPRNRule 8.3 - Churchill Mining plc
28th Sep 20097:00 amRNSStatement re. Press Comment
26th Aug 20097:00 amRNSProject Update
29th Jul 20091:27 pmRNSExercise of Options and Total Voting Rights
23rd Jul 20099:03 amRNSProject Update & Appointments
30th Jun 20091:13 pmRNSUpdate for Spitfire Resources
15th Jun 20097:00 amRNSChange of Name of Nominated Adviser
4th Jun 20092:53 pmRNSHolding(s) in Company
4th Jun 200912:23 pmRNSHolding(s) in Company
3rd Jun 20097:00 amRNSHolding(s) in Company
29th May 20092:25 pmRNSTotal Voting Rights
27th May 20097:00 amRNSIssue of Equity
18th May 20097:06 amRNSProject Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.