The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCloudified Holdings Limited Regulatory News (CHL)

Share Price Information for Cloudified Holdings Limited (CHL)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 4.00
Bid: 3.00
Ask: 5.00
Change: 0.00 (0.00%)
Spread: 2.00 (66.667%)
Open: 4.00
High: 4.00
Low: 4.00
Prev. Close: 4.00
CHL Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Project Update

8 Dec 2008 07:00

RNS Number : 6903J
Churchill Mining plc
08 December 2008
 



8th December, 2008

Churchill Mining Plc

"Churchill" or "the Company"

More than 500Mt of coal at low strip ratios shown by preliminary pit optimisation studies

Churchill Mining Plc, (AIM:CHL) the Indonesia focused mining company with a JORC resource of 1.4 billion tonnes of thermal coal at its East Kutai Coal Project ("EKCP"), is pleased to announce that studies it has undertaken as part of its fast-track to production, show that more than 500 million tonnes of the in-situ JORC compliant resource of 1.4 billion tonnes falls within a preliminary pit design at a stripping ratio of just 2.23:1. This calculation does not constitute a JORC mineable reserve. However, the results indicate the planned future operations will allow significant tonnages of the coal resource to fall within design pit shells with a low stripping ratio.

At this stage the pit design studies concentrate only on the northern half of the current target drilling area of the RTM block, with the southern section still being evaluated. 

Whilst the studies are preliminary in nature, early mine-pit optimisation models show the following in-situ coal tonnages within the designed pit:

Stripping Ratio  In-situ Tonnes

1.29 260 Mt

1.50 325 Mt

1.89  442 Mt

2.23 551 Mt

Churchill is encouraged by the steps emerging countries are making towards introducing new sources of coal fired power. China is bringing forward its country electrification programme and Indian companies such as National Thermal Power Corporation, are in the process of constructing another 25,000 MW of power. With India unable to fulfil its thermal coal supply domestically, Churchill is well placed to capitalise on the future demand from India and the Company continues its discussions with a number of Indian companies about off-take agreements.

Churchill's Managing Director, Paul Mazak, commented;

"We are now approximately 12 months off our first phase of production at the East Kutai Coal Project. With the current international coal price having come off, these low stripping ratios are of great positive significance to the economics of the project. By focusing initially on the coal available at low stripping ratios, we are expecting to significantly reduce our operating costs during the initial period of mining, which is especially important on large projects such as this one." 

Mr Brett Gunter, is the qualified person that has reviewed the technical information contained in this release.

Churchill Mining Plc

Managing Director - Paul G. Mazak

+62 81510539186 / + 62 21 39832398 

paul.mazak@churchillmining.com

Blue Oar Securities 

Romil Patel

+44(0)20 7448 4000

Olly Cairns

+61 (0)8 6430 1631

Pelham PR

Candice Sgroi

+44 (0) 20 7743 6376

Notes to editors

Churchill Mining Plc listed on AIM in April 2005. 

East Kutai Coal Project

In May 2007 Churchill announced a sales agreement had been entered into to purchase a 75% interest in the East Kutai Coal Project from PT Techno Coal Utama. Churchill has now extended the size of the project by 200 square kilometres by acquiring a 75% interest in the abutting tenements to the west of EKCP from the Investmine Group of Indonesia. Exploration and resource drilling continue along with scoping and pre-feasibility work. 

This updated JORC Resource Statement defining 1.4 billion tonnes of coal resources substantially surpasses the amount of coal that was expected to be confirmed by the end of 2008.

The various JORC (Joint Ore Reserve Committee) Resource categories are defined as follows:

A Mining Reserve: the economically mineable part of a Measured Resource and takes into consideration variables outside of the geological continuity including; mining method, processing, economics, marketing, legal, environmental, social and governmental factors 

Measured Resource: can be estimated with a high level of confidence with the sample locations spaced closely enough to confirm geological and grade continuity.

Indicated Resource: can be estimated with a reasonable level of confidence, with the sample locations spaced too widely apart to confirm geological and/or grade continuity but are spaced closely enough for continuity to be assumed.

Inferred Resource: can be estimated with a low level of confidence, being inferred from geological evidence and assumed but nor verified geological and grade continuity. 

The aim of any exploration and drilling programme is to move the maximum number of tonnes sitting in the Inferred and Indicated Resources categories up to the Measured Resource category and eventually into a Mining Reserve, by continually updating the geological model and other aspects, through additional drilling and other geological exploration work. 

Sendawar - CBM 

The Sendawar CBM project in KalimantanIndonesia, covers more than 800 square kilometres of prospective ground and lies in close proximity to two operating open-cut coal mines. The project is located approximately 50 km from the Mahakam River

During Churchill's coal exploration programme, data collected during geophysical and resistivity work, along with data collected from previous oil and gas exploration in the area, indicated that the area was highly prospective for Coal Bed Methane. Churchill (70% of the CBM project) along with its Indonesian partner RMU (30%) were granted Indonesia's first CBM JEA license in September 2007. The CBM project has the potential to host Gas-in-Place of 5.6 trillion cubic feet. Churchill is currently conducting further studies on the CBM project before starting detailed field work.

South Woodie Woodie

Given the increased prospectivity of South Woodie Woodie and Churchill's increasing focus on its Indonesian coal and coal bed methane projects, the Company sold 80% of the project to Australian company Spitfire Resources Limited ("Spitfire").

Spitfire, which listed on the ASX on the 12th December 2007, has the option to purchase the remaining equity in the project but must spend AUD$1.5 million on exploration. Aside from its large shareholding in Spitfire, Churchill also retains a price-indexed mining royalty over the South Woodie Woodie project.

The South Woodie Woodie project covers approximately 490 square kilometres (with a further 899 square kilometres under application) in the East Pilbara region of Western Australia, and sits approximately 400 km southeast of Port Hedland in the highly prospective Pilbara manganese province. Spitfire has identified multiple drill targets and shall begin its new drill programme shortly.

In March 08 Spitfire announced that it had secured the strategic support of the diversified Norwegian-based industrial, trading and metals & alloys group, Tinfos AS ("Tinfos"), as its new major shareholder via a share placement.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCIIFSRFFLTIIT
Date   Source Headline
1st May 20249:03 amRNSHolding(s) in Company
30th Apr 20247:30 amRNSRestoration - Cloudified Holdings Limited
30th Apr 20247:00 amRNSInterim results
29th Apr 20248:30 amRNSNotice of Interim Result & Restoration of Trading
3rd Apr 20248:29 amRNSRetirement of Director
28th Mar 202411:42 amRNSUpdate
28th Mar 202411:37 amRNSFinal Results
12th Dec 20232:43 pmRNSCompletion of the Disposal & Directorate Changes
7th Jun 201712:00 pmRNSCancellation of AIM admission
16th May 20178:00 amRNSUpdate on Annulment Application
19th Apr 20179:00 amRNSFurther re Annulment Application
6th Apr 20179:00 amRNSBlock Listing Six Monthly Return
4th Apr 20178:15 amRNSFurther re Annulment Application and suspension
31st Mar 201710:00 amRNSHalf Yearly Report and Annulment Application
16th Mar 20178:00 amRNSBlock Listing Six Monthly Return
28th Feb 201711:45 amRNSUpdate
31st Jan 20178:23 amRNSUpdate
23rd Dec 20162:00 pmRNSUpdate
23rd Dec 20167:00 amRNSBlock Listing Six Monthly Return
7th Dec 20168:45 amRNSChurchill's claim against Indonesia struck out
6th Dec 20167:30 amRNSSuspension - Churchill Mining Plc
2nd Dec 20167:00 amRNSTiming of ICSID decision and temporary suspension
1st Dec 201611:52 amRNSResult of AGM
30th Nov 201611:00 amRNSTotal Voting Rights
30th Nov 20167:50 amRNSICSID Arbitration Update
29th Nov 20167:00 amRNSICSID Arbitration Update
16th Nov 20164:41 pmRNSSecond Price Monitoring Extn
16th Nov 20164:35 pmRNSPrice Monitoring Extension
16th Nov 20162:28 pmRNSICSID Arbitration Update
7th Nov 20167:40 amRNSHolding(s) in Company
7th Nov 20167:40 amRNSHolding(s) in Company
3rd Nov 201610:41 amRNSDirector Shareholding
2nd Nov 20168:00 amRNSPosting of Annual Report and AGM Notice
19th Oct 20162:24 pmRNSFinal Results
11th Oct 20168:57 amRNSBlock Listing Six Monthly Return
6th Oct 20167:00 amRNSBlock Listing Six Monthly Return
15th Sep 20168:00 amRNSBlock listing six monthly return
12th Sep 201612:37 pmRNSICSID Arbitration Update
12th Aug 20169:12 amRNSDirector/PDMR Shareholding
29th Jul 20167:00 amRNSTotal Voting Rights
1st Jul 20163:00 pmRNSIssue of Shares
23rd Jun 20168:00 amRNSBlock listing six monthly return
21st Jun 20169:53 amRNSFurther re forgery dismissal application timing
17th Jun 201612:03 pmRNSUpdate on forgery dismissal application
6th May 20169:30 amRNSResult of General Meeting
5th May 20161:30 pmRNSUpdate on Indonesia's default in ICSID proceedings
29th Apr 201610:00 amRNSTotal Voting Rights
20th Apr 201612:39 pmRNSUpdate on Indonesia's default in ICSID proceedings
14th Apr 20164:40 pmRNSSecond Price Monitoring Extn
14th Apr 20164:35 pmRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.