Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCastillo Coppe. Regulatory News (CCZ)

Share Price Information for Castillo Coppe. (CCZ)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.40
Bid: 0.35
Ask: 0.45
Change: -0.04 (-9.09%)
Spread: 0.10 (28.571%)
Open: 0.40
High: 0.40
Low: 0.40
Prev. Close: 0.44
CCZ Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Castillo set for Mt Oxide maiden drilling campaign

9 Oct 2020 07:00

RNS Number : 5738B
Castillo Copper Limited
09 October 2020
 

09 October 2020

CASTILLO COPPER LIMITED("Castillo" or the "Company")

Castillo set for maiden drilling campaign at the Mt Oxide Project

Logistics all in place ahead of drill campaigns at the Big One Deposit and the Arya Prospect

Castillo Copper Limited (LSE and ASX: CCZ), a base metal explorer primarily focused on copper across Australia and Zambia, is pleased to announce that all drilling logistics for the upcoming campaign at the Mt Oxide Project are now finalised and the drilling campaign is on track to commence by mid-October.

 

Highlights

· Castillo's geology team have largely finalised all necessary logistics with key stakeholders, enabling the drilling campaign at the Mt Oxide Project to commence by mid-month as planned:

o Contract with Depco Drilling has been formalised, with compensation terms including a material proportion in script and voluntary escrow period reflecting the driller's confidence in the Mt Oxide Project

· In principle, the landowner has agreed suitable access routes which is expected to result in drilling starting at the high-grade Big One Deposit then move on to the Arya Prospect

· Members of the geology and logistic teams recently visited the Arya Prospect to facilitate refining the best access route and fully optimise the test-drill targets:

o They reaffirmed the drilling programme for the Arya Prospect comprises 3,432m over 14 drill-holes, within an area 1,500m by 1,000m that targets near surface and deeper geophysical anomalies

o Notably, three deep vertical drill-holes will target the interpreted massive sulphide bedrock conductor (EG01) that is ~130m thick with dimensions ~1,500m by ~450m and ~426m deep

o The remaining drill-holes will focus on shallow anomalies, EG02 and EG10, interpreted to be supergene mineralisation - both are ~25m below surface and ~25m thick, with dimensions ~160m by 50m / ~270m by 280m respectively

· BHP, which found EG01, EG02 and EG10 in the 1990s, and other groups conducted rock chip sampling at surface, with assays confirming high-grade supergene copper mineralisation up to 7,400ppm Cu and 18,400ppm Cu respectively

 

· The overall objective of the campaign at the Arya Prospect is proving a clear nexus between the interpreted supergene copper mineralisation at surface and massive sulphides at depth

 

Next steps

There are several upcoming mutually exclusive events, including:

· Drilling commencing at Mt Oxide Project,

· Updates on Cangai Copper Mine and Broken Hill Projects; and

· Update on Mkushi Project in Zambia.

 

Simon Paull, Managing Director of Castillo Copper, commented: "It's pleasing to report that all logistics to commence the drilling campaign at the Mt Oxide Project are now in place. In particular, we are delighted our drilling contractor has agreed to be partly compensated in script, as that reflects a high degree of confidence in the Mt Oxide Project. Work is slated to commence at the high-grade Big One Deposit, then move on to the Arya Prospect where there are three principle interpreted targets including a sizeable potential massive sulphide conductor that is 130m thick."

 

Site visit to Arya Prospect

 

Members of the geology and logistic teams recently visited the Arya Prospect in order to determine the ideal access route and fully optimise the test drill targets. Under the current plan, while the drilling team are working on Big One Deposit, which is estimated to take 3-4 weeks, the logistics team will complete the access road to the Arya Project so it can accommodate heavy equipment. Concurrently, the geology team will conduct more thorough site inspections and then peg the drill sites ahead.

 

Further, work done by BHP4 and other groups confirmed high-grade supergene copper mineralisation at surface, based on assayed rock chip samples, up to 7,400ppm Cu and 18,400ppm Cu respectively. More significantly, BHP4 discovered EG01, EG02 and EG10 in the 1990s but due to exogenous factors at the time, possibly the prevailing base metal downturn, did not follow through and drill the targets.

 

As there is a probable link between supergene copper mineralisation at surface and massive sulphides at depth, the primary objective of Castillo's upcoming campaign at the Arya prospect is to secure demonstrable proof.

 

In addition to this release, a PDF version of this report, with supplementary information can be found on the Company's website: https://www.castillocopper.com/asx-announcements/

 

Overview of Mt Oxide Project

 

Castillo is targeting the development of a viable copper mining operation at the Mt Oxide Project, which is located in the copper-belt district approximately 150km north of Mt Isa in north-west Queensland. The project is within the proximity of several historic and currently operating copper mines including Lady Annie and Capricorn Copper.

 

Currently, the main highlight within the Mt Oxide Project is the exploration targets known as the Big One Deposit, which comprises shallow high-grade supergene ore up to 28.4% Cu, and the Arya Prospect, which was identified through an airborne electromagnetic survey conducted by Geoscience Australia in March 2019.

 

For further information, please contact:

Castillo Copper Limited

+61 8 6558 0886

Simon Paull (Australia), Managing Director

Gerrard Hall (UK), Director

SI Capital Limited (Financial Adviser and Corporate Broker)

+44 (0)1483 413500

Nick Emerson

Luther Pendragon (Financial PR)

+44 (0)20 7618 9100 

Harry Chathli, Alexis Gore, Joe Quinlan

 

Notes to Editors:

About Castillo Copper

Castillo Copper Limited is an Australian-based explorer primarily focused on copper across Australia and Zambia. Castillo Copper is listed on the LSE and ASX under the ticker "CCZ".

The three main projects across Australia and Zambia include:

 

Australia

Mt Oxide Project

Castillo is targeting the development of a viable copper mining operation at the Mt Oxide Project, which has significant exploration upside with several high-grade targets including an interpreted 130m thick by 1,500m by 450m massive sulphide bedrock conductor that is about to be drilled. The project is located approximately 150km north of Mt Isa in northwest Queensland. The project is within the proximity of several historic and currently operating copper mines including Lady Annie and Capricorn Copper.

Cangai Project

The Cangai Project is in northern New South Wales, where the Cangai Copper Mine is located, one of Australia's highest grading historic copper mines. The Company's core focus is the development and expansion of the Cangai Copper Mine, which comprises a volcanogenic massive sulphide deposit, with a JORC Code compliant Inferred Resource of 3.2Mt at 3.35 per cent. Cu. and up to 14.45 per cent. Cu in assayed diamond core intersections.

Zambia

Zed Projects

The Company is the sole shareholder of Zed, an Australian company which holds four high-quality prospective assets across Zambia's copper-belt, the second largest copper producer in Africa. Castillo Copper intends to initially focus on the Luanshya Project, which sits on the Zambian copper belt's Lufilian Arc geological structure. The second priority for the Company is the Mkushi Project, which contiguously surrounds an operating open-pit copper mine, in a region proven to be highly prospective for Cu-Au mineralisation. The Company is currently working towards establishing a Zambian in-country presence, utilising local geologists and joint venture partner teams.

Visit Castillo Copper's website: https://www.castillocopper.com/

 

Competent Person Statement

 

The information in this report that relates to Exploration Results for the "Mt Oxide Project" contained in this announcement is based on a fair and accurate representation of the publicly available information at the time of compiling the RNS Release, and is based on information and supporting documentation compiled by Matthew Stephens, a Competent Person who is a Fellow of The Australian Institute of Geoscientists. Matthew Stephens is a Senior Consultant Geologist consulting to Xplore Resources Pty Ltd. Mr Stephens has been a Fellow of the Australian Institute Geoscientists for 11 years and has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr Stephens consents to the inclusion in the report of the matters based on his information and the form and context in which it appears.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLEAFEPELKEFAA
Date   Source Headline
30th Nov 20217:00 amRNSUpdate on Key Priorities for 2022
25th Nov 20217:00 amRNSOption to acquire Lithium Projects extended
22nd Nov 20217:00 amRNSPicasso Field Trip Findings
17th Nov 20219:31 amRNSArya Prospect Drilling Results
9th Nov 20217:00 amRNSOperational Update on Copper and Lithium Assets
29th Oct 20211:44 pmRNSUpcoming Annual General Meeting
29th Oct 20217:23 amRNSCleansing Notice and Appendix 2A
29th Oct 20217:00 amRNSSeptember 2021 Quarterly Report
27th Oct 20217:00 amRNSSite visit to Picasso Lithium Project
20th Oct 20217:00 amRNSComprehensive surface sampling at Litchfield
18th Oct 20217:00 amRNSDrilling commences at Arya Copper Prospect
7th Oct 20217:00 amRNSUpdate on Litchfield Project
5th Oct 20217:00 amRNSFull assay results for second campaign at Big One
5th Oct 20217:00 amRNSNotice of AGM and Director Nominations
4th Oct 20217:00 amRNSUpdate on Picasso Project
30th Sep 20213:29 pmRNSPublication of Annual Report and Accounts
29th Sep 20217:00 amRNSCCZ secures option to acquire two lithium projects
27th Sep 20217:00 amRNSASX Trading Halt
14th Sep 20217:00 amRNSOn track to test-drill Arya Prospect target
3rd Sep 20211:00 pmRNSDirector/PDMR Shareholding
31st Aug 20217:00 amRNSLarge targets under 6km copper strike at Luanshya
16th Aug 20219:45 amRNSAppendix 2A and Cleansing Prospectus Update
16th Aug 20217:00 amRNSAppointment of Non-executive Director
10th Aug 20217:00 amRNSCastillo to test-drill Arya Prospect in September
9th Aug 20215:15 pmRNSCleansing Notice and Appendix 2A
5th Aug 20217:00 amRNSPlanned IPO of Prime Broken Hill Assets on ASX
4th Aug 20216:13 pmRNSAppendix 3B
2nd Aug 20213:32 pmRNSCleansing Prospectus
30th Jul 20211:11 pmRNSResult of General Meeting
27th Jul 20217:00 amRNSJune 2021 Quarterly Report
26th Jul 20214:41 pmRNSSecond Price Monitoring Extn
26th Jul 20214:36 pmRNSPrice Monitoring Extension
26th Jul 20217:00 amRNSBig One Deposit Update
19th Jul 202110:44 amRNSCleansing Notice
15th Jul 20214:41 pmRNSSecond Price Monitoring Extn
15th Jul 20214:35 pmRNSPrice Monitoring Extension
15th Jul 20217:00 amRNSSignificant Drilling Results at Big One Deposit
13th Jul 20214:41 pmRNSSecond Price Monitoring Extn
13th Jul 20214:35 pmRNSPrice Monitoring Extension
13th Jul 20212:05 pmRNSSecond Price Monitoring Extn
13th Jul 20212:00 pmRNSPrice Monitoring Extension
13th Jul 20219:33 amRNSASX Trading Halt
1st Jul 20217:00 amRNSComprehensive geophysical campaign at Zambia
30th Jun 20212:03 pmRNSNotice of Extraordinary General Meeting
29th Jun 20217:00 amRNSMineralisation intercepted at Big One Deposit
16th Jun 20217:00 amRNSDrilling campaign commences at Mt Oxide Project
15th Jun 20217:00 amRNSCleansing Notice and Appendix 2A
4th Jun 20217:00 amRNSCastillo raises £6.4m to develop projects
1st Jun 20217:00 amRNSExpanded drilling campaign to commence at Big One
20th May 20217:00 amRNSPotential mineralisation extended at Big One

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.