Cobus Loots, CEO of Pan African Resources, on delivering sector-leading returns for shareholders. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCaspian Sunrise Regulatory News (CASP)

Share Price Information for Caspian Sunrise (CASP)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 3.45
Bid: 3.30
Ask: 3.60
Change: -0.20 (-5.48%)
Spread: 0.30 (9.091%)
Open: 3.65
High: 3.65
Low: 3.35
Prev. Close: 3.65
CASP Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Update on Operations at BNG

3 Dec 2015 07:00

RNS Number : 7964H
Roxi Petroleum Plc
03 December 2015
 

 

Roxi Petroleum PLC

 

("Roxi" or the "Company")

 

Update on Operations at BNG

 

 

Roxi, the Central Asian oil and gas company with a focus on Kazakhstan, is pleased to further update the market with news of progress at its flagship BNG asset.

 

Deep Wells

 

Deep Well A5

 

As previously announced Deep Well A5 was drilled to a depth of 4,442 meters. Unrecovered drilling fluids have blocked the well during preparation for testing but for a brief period of up to two hours at a time the well flowed oil at the rate of 2,000 barrels of oil per day ('bopd') before becoming blocked by the accumulation of unrecovered heavy drilling fluids becoming set in the oil pipe.

 

The current position is that oil is being recovered intermittently, together with unrecovered drilling fluids, as the well is opened and closed. The continuing presence of the unrecovered heavy drilling fluids blocks the well after a few hours flow and has to date prevented unrestricted flow testing.

 

This problem is the result of the extremely high pressure encountered in drilling the well and the associated requirement to use extremely dense drilling fluids to control that pressure.

 

Well pressures in the casing are recorded at up to 280 bar with pressures in the well pipe varying from zero after a blockage to 200 bar as the natural pressure in the well builds then clears the blockage.

 

Typically the wells have been opened when the pressure in the drill pipe exceeds 85 bar, with 5 day periods closed while pressure in the oil pipe builds to a level it flows through the blockage.

 

The quantity of unrecovered drilling fluids in Deep Well A5 is finite and management's expectation is that as these fluids come to the surface the periods of oil flow should increase until finally the oil flows naturally on an unrestricted basis.

 

Deep Well 801 

 

Three intervals have been perforated at Deep Well 801 and oil has flowed from each.

 

The intervals perforated are a 14 meter interval starting at a depth of 4,910; a 20 meter interval starting at a depth of 4,842 meters; and a 22 meter interval starting at a depth of 4,726 meters.

 

However, although the pressures encountered at Deep Well 801 are not as great as at Deep Well A5 the existence of unrecovered drilling fluids has also caused blockages in this well during the testing of each interval such that to date the Company has not been able to conduct unimpeded flow testing.

 

After taking specialist advice Roxi's management believes the best way to tackle the issue of unrecovered drilling fluids in Deep Well 801 is via a prolonged wash using less dense mud injected under pressure, intended to lessen the density of the drilling fluids and ease their recovery. Work in this regard has already commenced.

 

Deep Well A6

 

As previously announced Deep Well A6 was spudded in early November 2015 and is to be drilled to a planned total depth of 5,000 meters.

 

Roxi is pleased to announce that drilling of this well has passed 1,350 meters without incident and work is on track such that the 5,000 meters total depth should be reached as planned by the end of February 2016.

 

Shallow Wells

 

Shallow Well 143

 

Well 143, which was the first of the shallow wells for 2013, was spudded on 1 April 2013, on the MJ-F structure located towards the North of South Yelemes field at BNG. The total depth of the well is 2,750 meters.

 

Two intervals at 2,693 meters and 1974 meters have already been tested with good oil shows encountered.

 

The well has now been tested at a third interval of 2,413 meters at which oil has again been detected. The quality of the oil recovered from this interval has been analysed as having an oil density of 39 degrees API (American Petroleum Institute) which indicates it is of high quality.

 

The Company's shallow wells have not been affected by the blockages encountered at our deep wells. Currently the four established shallow wells are testing at an aggregate rate of some 280 bopd (165 bopd net to Roxi). Additionally, test production at Well 143 has been of the order of 100 bopd (59 bopd net to Roxi).

 

Further announcement on the progress at our wells will be made in due course.

 

Comment: 

Clive Carver, Chairman said 

 

There is increasing evidence of the existence of good quality oil from both our deep and shallow drilling. Our challenge is to clean up our deep wells so the oil can flow unrestricted and the flow tests can be completed."

 

 

Enquiries: 

 

Roxi Petroleum PLC

Clive Carver, Chairman +7 727 375 0202 

 

WH Ireland Ltd

James Joyce / James Bavister +44 (0) 207 220 1666 

 

Qualified Person 

Mr. Nurlybek Ospanov, Roxi's senior geologist who is a member of the Society of Petroleum Engineers ("SPE"), has reviewed and approved the technical disclosures in this announcement.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLQLLFBELFEFBQ
Date   Source Headline
26th Jun 20203:25 pmRNSNotice of AGM
25th Jun 20207:00 amRNSAnnual Report and Financial Statements
14th May 202010:50 amRNSAmended: BNG April 2020 production numbers
14th May 202010:10 amRNSBNG April 2020 Production Numbers
4th May 20207:00 amRNSOperational and Financial Update
27th Apr 20207:00 amRNSBNG Operational Update
6th Apr 20207:00 amRNSBNG Operational Update & March Production Numbers
30th Mar 20207:00 amRNSBNG Operational Update & Increase in Production
18th Mar 20208:34 amRNSOperational Update
11th Mar 202010:08 amRNSFebruary 2020 Production & Operational Summary
9th Mar 20202:05 pmRNSSecond Price Monitoring Extn
9th Mar 20202:01 pmRNSPrice Monitoring Extension
9th Mar 20209:06 amRNSSecond Price Monitoring Extn
9th Mar 20209:00 amRNSPrice Monitoring Extension
13th Feb 202012:56 pmRNSResult of General Meeting
10th Feb 20209:05 amRNSSecond Price Monitoring Extn
10th Feb 20209:00 amRNSPrice Monitoring Extension
10th Feb 20207:00 amRNSBNG Update and January 2020 Production
21st Jan 202010:25 amRNSAcquisition of the Caspian Explorer
8th Jan 202012:02 pmRNSBNG Update and December Production
2nd Jan 20202:00 pmRNSPrice Monitoring Extension
2nd Jan 202011:05 amRNSSecond Price Monitoring Extn
2nd Jan 202011:00 amRNSPrice Monitoring Extension
2nd Jan 20209:05 amRNSSecond Price Monitoring Extn
2nd Jan 20209:00 amRNSPrice Monitoring Extension
2nd Jan 20207:00 amRNSBNG Success at Deep Well A5
10th Dec 20197:00 amRNSBNG Operational Update & Production Numbers
27th Nov 20191:00 pmRNSOperational Update
19th Nov 20194:35 pmRNSPrice Monitoring Extension
19th Nov 20192:05 pmRNSSecond Price Monitoring Extn
19th Nov 20192:00 pmRNSPrice Monitoring Extension
6th Nov 20199:04 amRNSOperational Update and BNG production numbers
7th Oct 20197:00 amRNSBNG Monthly Production Numbers
30th Sep 20199:03 amRNSBNG Operational Update
17th Sep 20197:00 amRNSInterim Results
12th Sep 201910:35 amRNSAmendment: BNG Operational Update
12th Sep 20197:41 amRNSBNG Operational Update and Production Numbers
2nd Sep 20197:21 amRNSPurchase of equipment and the issue of shares
21st Aug 20198:39 amRNSBNG Operational Update and Production Numbers
6th Aug 20197:00 amRNSMonthly production numbers
26th Jul 20197:00 amRNSInvestor and Analyst Conference Call
12th Jul 20197:00 amRNSBNG Operational Update
11th Jul 20198:58 amRNSMJF Licence Upgrade Signed
21st Jun 20194:50 pmRNSResult of AGM
21st Jun 20197:00 amRNSMJF Licence Update
19th Jun 20197:00 amRNSBNG Operational Update
7th Jun 20197:00 amRNSBNG Operational Update
5th Jun 201912:08 pmRNSAward of long-term incentives
4th Jun 20197:00 amRNSOperational Update & Production Report
29th May 201910:00 amRNSBNG operational update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.