Operational Update & Production Report

4 Jun 2019 07:00

RNS Number : 9959A
Caspian Sunrise plc
04 June 2019
 

Caspian Sunrise PLC

("Caspian Sunrise" or the "Company")

BNG operational update and May 2019 production report

 

Introduction

 

The Company is pleased to provide an operational update at its flagship BNG asset.

 

Deep Wells

 

Deep Well A5

 

After further evaluation of the remedial options open to us we have concluded that a side-track from below the salt layer is preferable, at this stage, to a side-track commencing above the salt layer.

 

Accordingly, we now plan to use laser cutting equipment to cut the liner and drill pipes at a depth of 4,005 meters and then remove a 30 meter section of liner and drill pipe, before commencing a new 500 meter side-track from a depth of 4,035 meters.

 

A contractor has been identified and the specialist equipment is being sourced with the target that the side tracking itself can commence in Q3 2019. 

 

Deep Well A6

 

Following extensive analysis using the input of international consultants we have decided to focus on the lower of the two intervals of interest where we believe the potential is greater, and which is correlated with intervals already identified at Deep Wells A5 and A8. It is also the interval of interest where any damage caused by previous attempts to perforate the well is minimal.

 

After re completing the bottom of the well to prevent water ingress we now plan to perforate the lower of the two intervals of interest.

 

We will return to the upper interval of interest at a later time.

 

Deep Well A8

 

Drilling at this well has reached a depth of 4,440 meters. The mudlogs indicate that we are still in the interval identified as oil bearing and starting at a depth of 4,346 meters. We plan to take a further core sample, of 18 meters, starting at 4,440 meters to confirm the presence of oil.

 

Once we have established the bottom of the oil bearing interval, we plan to drill for a further 30 meters and then conduct a wireline analysis of the entire horizon, after which we will case the well to a depth of 4,500 meters.

 

Deep Well 801

 

We continue to wait on contractors and equipment to conduct a high-pressure acid treatment and we expect work will commence in June 2019, taking approximately two months to complete.

 

We have continued to regularly open the well to relieve pressure build-ups. The last such opening resulted in oil and gas coming to the surface with minimal water. However, the limited quantities recovered confirm the presence of significant amounts of obstructive, hardened, high-density drilling fluids in the well.

 

Shallow wells

 

MJF structure

 

The May production figures as set out below confirm our belief that in prioritising cash to fund the group, while waiting on the much-delayed receipt of the MJF licence upgrade, the productive capacity of the better producing wells is declining at a rate faster than necessary, as periodic routine maintenance work has been deferred to allow cash to be generated.

 

No significant workovers on these better producing wells have been conducted since they first came on stream in 2016 and 2017, and until we are able to do so we will continue to expect further declines in the daily rates of production.

 

We believe that following workovers each of the 3 best producing wells at the MJF structure should significantly increase their daily rates of production. Additionally, on receipt of the MJF licence upgrade, we will start a campaign to drill a further 10 infill wells on the structure with a view to significantly increasing aggregate daily production capability.

 

Potential New shallow structure

 

As previously reported, we believe that the initial results from shallow well 808, drilled on a potential new structure possibly equivalent to the MJF structure, were unreliable. 

 

Plans to re-perforate the well have been delayed for operational reasons.

 

MJF licence upgrade

 

We continue to have regular contact with the various regulatory agencies concerned with the issuance of the now very overdue MJF licence upgrade. Based on these discussions we remain confident that we will be able to sell oil by reference to international prices in Q3 2019.

 

May production numbers

 

Production from our shallow wells for May 2019, was in aggregate 42,434 or 1,396 bopd (April 2019, 44,115 barrels or 1,471 bopd), with oil sold at an average price of $19.00 per barrel (April $19.00 per barrel).

 

Compared to April 2019, average daily production fell as the production from overworked wells declined at a faster rate than previously experienced.

 

Ends

 

Caspian Sunrise PLC

 

Clive Carver

Executive Chairman

+7 727 375 0202

 

 

WH Ireland, Nominated Adviser & Broker

 

James Joyce

Jessica Cave

James Sinclair-Ford

 

+44 (0) 207 220 1666

Yellow Jersey PR

Tim Thompson

Henry Wilkinson

+44 (0) 203 735 8825

 

Qualified Person

 

Mr. Nurlybek Ospanov, Caspian Sunrise PLC's Chief Geologist / Technical Director who is a member of the Society of Petroleum Engineers ("SPE"), has reviewed and approved the technical disclosures in this announcement.

 

This announcement has been posted to:

www.caspiansunrise.com/investors

 

The information contained within this announcement is deemed by the Company to constitute inside information under the Market Abuse Regulation (EU) No. 596/2014.

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDUGUMGQUPBGQW
Date   Source Headline
18th May 20269:00 amRNSUpdate
23rd Mar 20267:00 amRNSAcquisition of Mineral Assets
13th Mar 20267:33 amRNSUpdate
13th Mar 20267:33 amRNSUpdate
3rd Mar 202611:07 amRNSFirst oil from the West Shalva Contract Area
10th Feb 20267:00 amRNSTesting at the West Shalva Contract Area
2nd Feb 20267:00 amRNSGeneral Meeting Results
28th Jan 20267:00 amRNSCompletion of the acquisition of the Block 8
7th Jan 20267:00 amRNSNotice of GM
30th Dec 20257:00 amRNSRe-issue of BNG Contract Area licences
30th Dec 20257:00 amRNSRe-issue of BNG Contract Area licences
22nd Dec 202511:15 amRNSReplacement: Acquisition of Tau-Cen
22nd Dec 202511:15 amRNSReplacement: Acquisition of Tau-Cen
22nd Dec 20257:00 amRNSAcquisition of Tau-Cen
22nd Dec 20257:00 amRNSAcquisition of Tau-Cen
4th Dec 20251:00 pmRNSPosting of Annual Report & Accounts
4th Dec 20258:32 amRNSExemption from future Historic Costs at the BNG
3rd Dec 20257:00 amRNSAward of licence at the BNG Contract Area
2nd Dec 20257:00 amRNSIssue of shares
1st Dec 20258:55 amRNSReplacement 2025 Interim Results
1st Dec 20257:30 amRNSRestoration - Caspian Sunrise Plc
1st Dec 20257:07 amRNSInterim results for six months ended 30 June 2025
1st Dec 20257:00 amRNSAnnual report for the year ended 31 December 2024
31st Oct 20257:00 amRNSGeneral update
3rd Oct 20257:00 amRNSFirst well spudded at West Shalva Contract Area
30th Sep 20254:01 pmRNSDelay to the publication of results
27th Aug 20258:43 amRNSCorporate update
26th Aug 20256:00 pmRNSSuspended Companies Notice - Deletion
23rd Jul 20258:36 amRNSUpdate regarding the sale of MJF & South Yelemes
11th Jul 20259:23 amRNSUpdate on Block 8 Well Tests
9th Jul 20257:00 amRNSUpdate regarding sale of MJF and South Yelemes
1st Jul 20257:30 amRNSSuspension - Caspian Sunrise PLC
25th Jun 202512:57 pmRNSResult of AGM and matters discussed
18th Jun 20257:00 amRNSProduction and Testing from Block 8 Contract Area
16th Jun 20257:00 amRNSGeneral Update
30th May 20257:00 amRNSNotice of AGM
23rd May 20251:21 pmRNSAward of production licence at BNG Contract Area
1st May 20257:35 amRNSCorporate Update
15th Apr 202510:20 amRNSCompletion of West Shalva acquisition
1st Apr 20257:00 amRNSUpdate on the disposal of MJF & South Yelemes
3rd Mar 20257:00 amRNSCorporate & Operational update
26th Feb 20257:00 amRNSBNG deep structures conditional funding
21st Feb 20257:00 amRNSWest Shalva update
2nd Jan 20257:00 amRNSUpdate on the disposal of MJF & South Yelemes
21st Nov 202412:43 pmRNSDisposal of the BNG shallow MJF & South Yelemes
5th Nov 20247:00 amRNSUpdate on acquisition of West Shalva Contract Area
31st Oct 20247:00 amRNSUpdate on the disposal of MJF & South Yelemes
26th Sep 202412:59 pmRNSGeneral Meeting Results
25th Sep 20247:00 amRNSInterim results for six months ended 30 June 2024
4th Sep 20247:00 amRNSDisposal of the shallow MJF & Notice of GM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.