Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. View here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCentral Asia Metals Regulatory News (CAML)

Share Price Information for Central Asia Metals (CAML)

Share Price is delayed by 15 minutes
Get Live Data
130.80    0.80 (0.62%)
Bid:
131.00
Ask:
131.80
Spread: 0.80 (0.611%)
Market Cap: £222.89m
CAML Live PriceLast checked at - London Stock Exchange

Intraday Central Asia Metals Share Chart

H1 2024 Operations Update

11 Jul 2024 07:00

RNS Number : 9390V
Central Asia Metals PLC
11 July 2024
Β 

Β 

11 July 2024

Β 

CENTRAL ASIA METALS PLC

('CAML' or the 'Company') H1 2024 Operations Update

Central Asia Metals plc (AIM: CAML) provides its H1 2024 operations update for the Kounrad dump leach, solvent extraction and electro-winning ('SX-EW') copper recovery plant in Kazakhstan ('Kounrad') and the Sasa zinc-lead mine in North Macedonia ('Sasa').

H1 2024 operational summary

- Zero lost time injuries ('LTIs') at Kounrad

- One LTI at Sasa

- Kounrad copper production of 6,608 tonnes

- Sasa zinc-in-concentrate production of 9,014 tonnes

- Sasa lead-in-concentrate production of 12,872 tonnes

Β 

Group cash

Β 

- Cash in the bank at 30 June 2024 of $56.4 million

Β 

Outlook

Β 

- Kounrad on track to achieve 2024 full-year guidance for copper production (13,000 to 14,000 tonnes)

- Sasa expected to achieve production towards the lower end of 2024 guidance:

oΒ  Zinc-in-concentrate: 19,000 to 21,000 tonnes

oΒ  Lead-in-concentrate: 27,000 to 29,000 tonnes

Β 

CAML production summary

Metal production (tonnes)

Q2 2024

Q1 2024

H1 2024

H1 2023

Copper

3,488

3,120

6,608

6,716

Zinc

4,272

4,741

9,014

9,764

Lead

6,343

6,529

12,872

13,734

Nigel Robinson, Chief Executive Officer, commented:

"Kounrad performed well during Q2 2024, bringing H1 production into line with prior years, after facing some difficult winter weather conditions in Q1 of this year.

"Production at Sasa in both Q2 and H1 2024 has been impacted by a modest reduction in mined tonnage, owing principally to the short-term challenges inherent in the transition to a new mining method. This transition, which continued during the quarter, will be of material benefit in the longer-term, by sustaining the life of both the underground mine and its associated tailings storage facilities.

"We look forward to an improvement in mined tonnage at Sasa during H2 2024, as the mining transition progresses. However, taking into account the production levels achieved during H1, we expect full-year production at Sasa to be towards the lower end of our previously announced guidance.

"Our H1 2024 financial results will be released on 10 September 2024, when we will also announce our interim dividend."

Health and Safety

Sasa recorded one LTI during Q2 2024, towards the end of the period.

Kounrad had no LTIs during H1 2024, and at 30 June 2024 had achieved 2,236 days LTI free.Β 

Kounrad

Production and sales update

Kounrad Q2 2024 copper production of 3,488 tonnes brings output for the first six months of 2024 to 6,608 tonnes. Copper sales during H1 2024 were 6,415 tonnes.

Sasa

Production and sales update

In Q2 2024, 181,525 tonnes of ore were mined and 183,996 tonnes were processed, bringing the H1 2024 totals to 365,652 tonnes mined and 368,075 tonnes processed. The average head grades for the Q2 2024 period were 2.73% zinc and 3.66% lead, and for H1 2024 averaged 2.86% and 3.70% respectively. The average H1 2024 metallurgical recoveries were 85.5% for zinc and 94.4% for lead.Β 

Sasa produces a zinc concentrate and a separate lead concentrate. In Q2 2024, 8,419 tonnes of concentrate containing 50.8% zinc, and 9,009 tonnes of concentrate containing 70.4% lead were produced. This brings total production for H1 2024 to 17,913 tonnes of zinc concentrate at a grade of 50.3% and 18,186 tonnes of lead concentrate at a grade of 70.8%.

Sasa typically receives from smelters approximately 84% of the value of its zinc-in-concentrate and approximately 95% of the value of its lead-in-concentrate. Accordingly, Q2 2024 payable production was 3,599 tonnes of zinc and 6,026 tonnes of lead, bringing total payable production for H1 2024 to 7,581 tonnes of zinc and 12,228 tonnes of lead.

Payable base metal-in-concentrate sales for H1 2024 were 7,674 tonnes of zinc and 12,535 tonnes of lead, broadly in line with production.

During H1 2024, Sasa sold 174,916 ounces of payable silver to Osisko Gold Royalties, in accordance with its streaming agreement.

Units

Q2 2024

Q1 2024

H1 2024

H1 2023

Ore mined

t

181,525

184,127

365,652

396,234

Plant feed

t

183,996

184,079

368,075

396,673

Zinc grade

%

2.73

3.00

2.86

2.90

Zinc recovery

%

85.0

85.9

85.5

84.9

Lead grade

%

3.66

3.75

3.70

3.72

Lead recovery

%

94.2

94.7

94.4

93.1

Zinc concentrate

t (dry)

8,419

9,494

17,913

19,257

- Grade

%

50.8

49.9

50.3

50.7

- Contained zinc

t

4,272

4,741

9,014

9,764

Lead concentrate

t (dry)

9,009

9,177

18,186

19,302

- Grade

%

70.4

71.1

70.8

71.2

- Contained lead

t

6,343

6,529

12,872

13,734

Β 

Capital projects - the transition to paste-fill mining

During H1 2024, the Paste Backfill Plant operated consistently, with approximately 130,000 tonnes of paste placed in the voids between the 990 and 910 metre levels and in the cut-and-fill production stopes on the 800 metre level. Some of these previously mined voids proved of greater volume than anticipated, requiring more paste fill, which in turn restricted initial stoping operations under the new mining method. However, this void-filling provides the necessary ground stability for current and future mining, whilst increasing the volume of tailings stored underground and thus further reducing the quantity that needs to be stored on surface. The first long-hole stopes have also been put into production, and additional stopes will follow during H2 2024 and in 2025.

Construction of the Dry Stack Tailings Plant remains on track, with initial placement of filter cake on the engineered landform scheduled for H2 2024.

A total of 3,183 metres of the Central Decline have now been developed, connecting with the 800 metre level during Q2 2024. Completion and connection with the 750 metre level is planned for Q4 2024.

Group cash and debt position

At 30 June 2024, CAML had cash in the bank of $56.4 million and no significant debt.

Β 

For further information contact:

Central Asia Metals

Tel: +44 (0) 20 7898 9001

Nigel Robinson

CEO

Gavin Ferrar

CFO

Louise Wrathall

louise.wrathall@centralasiametals.com

Director of Corporate Development

Richard Morgan

richard.morgan@centralasiametals.com

Investor Relations Manager

Β 

Β 

Peel Hunt (Nominated Advisor and Joint Broker)

Tel: +44 (0) 20 7418 8900

Ross Allister

Β 

David McKeown

Emily Bhasin

Β 

Β 

Β 

BMO Capital Markets (Joint Broker)

Tel: +44 (0) 20 7236 1010

Thomas Rider

Β 

Pascal Lussier Duquette

Β 

Β 

Β 

BlytheRay (PR Advisors)

Tel: +44 (0) 20 7138 3204

Tim Blythe

Β 

Megan Ray

Β 

Β 

Note to editors:

Β 

Central Asia Metals, an AIM-listed UK company based in London, owns 100% of the Kounrad SX-EW copper project in central Kazakhstan and 100% of the Sasa zinc-lead mine in North Macedonia. The Company also owns an 80% interest in CAML Exploration, a subsidiary that was formed to progress early exploration opportunities in Kazakhstan, and a 28.7% interest in Aberdeen Minerals Ltd, a privately owned UK company focused on the exploration and development of base metals opportunities in northeast Scotland.

Β 

For further information, please visit www.centralasiametals.com and follow CAML on X at @CamlMetals and on LinkedIn at Central Asia Metals Plc

Β 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
Β 
END
Β 
Β 
UPDQBLFFZDLXBBQ
Date   Source Headline
30th Mar 20157:01 amRNSCircular and Notice of EGM
30th Mar 20157:00 amRNS2014 Full Year Results
16th Mar 201511:43 amRNSNotice of Results
10th Feb 20154:40 pmRNSSecond Price Monitoring Extn
10th Feb 20154:35 pmRNSPrice Monitoring Extension
15th Jan 20157:30 amRNSTransaction in Own Shares
6th Jan 20157:00 amRNS2014 Production Update and 2015 Outlook
24th Dec 201410:58 amRNSTransaction in Own Shares
26th Nov 20147:30 amRNSDirector's Interest in Shares
24th Oct 201411:30 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARESi
22nd Oct 20146:09 pmRNSExercise of Options and Directors' Dealings
9th Oct 20147:00 amRNSGrant of Options
3rd Oct 20147:00 amRNSQ3 2014 Production Update
1st Oct 20147:00 amRNSDirector's Interest in Shares
25th Sep 20147:00 amRNSInterim Results for the 6 Months Ended 30 June 14
28th Aug 201412:25 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
31st Jul 201412:11 pmRNSExercise of Warrants
24th Jul 20147:00 amRNSAllotment and issue of shares
18th Jul 20146:14 pmRNSTransaction in Own Shares
17th Jul 20146:25 pmRNSExercise of Options and Transaction in Own Shares
2nd Jul 20144:36 pmRNSShare Pledge by a Director
2nd Jul 20147:00 amRNSQ2 2014 Production and Capacity Expansion Update
1st Jul 20147:00 amRNSExercise of Warrants
16th Jun 20141:47 pmRNSBoard Changes and Results of AGM
3rd Jun 201412:50 pmRNSGrant of Options
27th May 20146:06 pmRNSTR-1 NOTIFICATION OF MAJOR INTEREST IN SHARES
27th May 20146:06 pmRNSTR-1 Notification of Major Interest in Shares
27th May 201411:43 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
23rd May 20144:53 pmRNSTR:1- Notification of major interest in shares
23rd May 201412:01 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
20th May 20147:00 amRNSKounrad Transaction Completion and Expansion Plans
19th May 20144:03 pmRNSAnnual Report and Accounts 2013 and Notice of AGM
14th May 20145:20 pmRNSTR-1: Notification of Major Interest in Shares
16th Apr 20147:00 amRNS2013 Full Year Results
8th Apr 201410:30 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
2nd Apr 20147:00 amRNSNotice of Results
28th Mar 201412:57 pmRNSAward Win
28th Mar 201412:14 pmRNSKounrad Transaction Update
28th Mar 201410:43 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
10th Mar 20147:00 amRNSChange of Adviser
14th Feb 20145:33 pmRNSTransaction in Own Shares
13th Jan 20147:59 amRNSDirector's Interest in Shares
7th Jan 20147:00 amRNSProduction Update and Outlook
9th Dec 20133:48 pmRNSAppointment of Director
25th Nov 20137:00 amRNSStrategic Investment in Copper Bay Ltd
18th Nov 20135:04 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
8th Nov 20134:40 pmRNSSecond Price Monitoring Extn
8th Nov 20134:35 pmRNSPrice Monitoring Extension
31st Oct 20133:26 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
31st Oct 20137:00 amRNSDirector Shareholding

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.