Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. View here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCentral Asia Metals Regulatory News (CAML)

Share Price Information for Central Asia Metals (CAML)

Share Price is delayed by 15 minutes
Get Live Data
130.80    0.80 (0.62%)
Bid:
131.00
Ask:
131.80
Spread: 0.80 (0.611%)
Market Cap: £222.89m
CAML Live PriceLast checked at - London Stock Exchange

Intraday Central Asia Metals Share Chart

H1 2024 Operations Update

11 Jul 2024 07:00

RNS Number : 9390V
Central Asia Metals PLC
11 July 2024
 

 

11 July 2024

 

CENTRAL ASIA METALS PLC

('CAML' or the 'Company') H1 2024 Operations Update

Central Asia Metals plc (AIM: CAML) provides its H1 2024 operations update for the Kounrad dump leach, solvent extraction and electro-winning ('SX-EW') copper recovery plant in Kazakhstan ('Kounrad') and the Sasa zinc-lead mine in North Macedonia ('Sasa').

H1 2024 operational summary

- Zero lost time injuries ('LTIs') at Kounrad

- One LTI at Sasa

- Kounrad copper production of 6,608 tonnes

- Sasa zinc-in-concentrate production of 9,014 tonnes

- Sasa lead-in-concentrate production of 12,872 tonnes

 

Group cash

 

- Cash in the bank at 30 June 2024 of $56.4 million

 

Outlook

 

- Kounrad on track to achieve 2024 full-year guidance for copper production (13,000 to 14,000 tonnes)

- Sasa expected to achieve production towards the lower end of 2024 guidance:

Zinc-in-concentrate: 19,000 to 21,000 tonnes

Lead-in-concentrate: 27,000 to 29,000 tonnes

 

CAML production summary

Metal production (tonnes)

Q2 2024

Q1 2024

H1 2024

H1 2023

Copper

3,488

3,120

6,608

6,716

Zinc

4,272

4,741

9,014

9,764

Lead

6,343

6,529

12,872

13,734

Nigel Robinson, Chief Executive Officer, commented:

"Kounrad performed well during Q2 2024, bringing H1 production into line with prior years, after facing some difficult winter weather conditions in Q1 of this year.

"Production at Sasa in both Q2 and H1 2024 has been impacted by a modest reduction in mined tonnage, owing principally to the short-term challenges inherent in the transition to a new mining method. This transition, which continued during the quarter, will be of material benefit in the longer-term, by sustaining the life of both the underground mine and its associated tailings storage facilities.

"We look forward to an improvement in mined tonnage at Sasa during H2 2024, as the mining transition progresses. However, taking into account the production levels achieved during H1, we expect full-year production at Sasa to be towards the lower end of our previously announced guidance.

"Our H1 2024 financial results will be released on 10 September 2024, when we will also announce our interim dividend."

Health and Safety

Sasa recorded one LTI during Q2 2024, towards the end of the period.

Kounrad had no LTIs during H1 2024, and at 30 June 2024 had achieved 2,236 days LTI free. 

Kounrad

Production and sales update

Kounrad Q2 2024 copper production of 3,488 tonnes brings output for the first six months of 2024 to 6,608 tonnes. Copper sales during H1 2024 were 6,415 tonnes.

Sasa

Production and sales update

In Q2 2024, 181,525 tonnes of ore were mined and 183,996 tonnes were processed, bringing the H1 2024 totals to 365,652 tonnes mined and 368,075 tonnes processed. The average head grades for the Q2 2024 period were 2.73% zinc and 3.66% lead, and for H1 2024 averaged 2.86% and 3.70% respectively. The average H1 2024 metallurgical recoveries were 85.5% for zinc and 94.4% for lead. 

Sasa produces a zinc concentrate and a separate lead concentrate. In Q2 2024, 8,419 tonnes of concentrate containing 50.8% zinc, and 9,009 tonnes of concentrate containing 70.4% lead were produced. This brings total production for H1 2024 to 17,913 tonnes of zinc concentrate at a grade of 50.3% and 18,186 tonnes of lead concentrate at a grade of 70.8%.

Sasa typically receives from smelters approximately 84% of the value of its zinc-in-concentrate and approximately 95% of the value of its lead-in-concentrate. Accordingly, Q2 2024 payable production was 3,599 tonnes of zinc and 6,026 tonnes of lead, bringing total payable production for H1 2024 to 7,581 tonnes of zinc and 12,228 tonnes of lead.

Payable base metal-in-concentrate sales for H1 2024 were 7,674 tonnes of zinc and 12,535 tonnes of lead, broadly in line with production.

During H1 2024, Sasa sold 174,916 ounces of payable silver to Osisko Gold Royalties, in accordance with its streaming agreement.

Units

Q2 2024

Q1 2024

H1 2024

H1 2023

Ore mined

t

181,525

184,127

365,652

396,234

Plant feed

t

183,996

184,079

368,075

396,673

Zinc grade

%

2.73

3.00

2.86

2.90

Zinc recovery

%

85.0

85.9

85.5

84.9

Lead grade

%

3.66

3.75

3.70

3.72

Lead recovery

%

94.2

94.7

94.4

93.1

Zinc concentrate

t (dry)

8,419

9,494

17,913

19,257

- Grade

%

50.8

49.9

50.3

50.7

- Contained zinc

t

4,272

4,741

9,014

9,764

Lead concentrate

t (dry)

9,009

9,177

18,186

19,302

- Grade

%

70.4

71.1

70.8

71.2

- Contained lead

t

6,343

6,529

12,872

13,734

 

Capital projects - the transition to paste-fill mining

During H1 2024, the Paste Backfill Plant operated consistently, with approximately 130,000 tonnes of paste placed in the voids between the 990 and 910 metre levels and in the cut-and-fill production stopes on the 800 metre level. Some of these previously mined voids proved of greater volume than anticipated, requiring more paste fill, which in turn restricted initial stoping operations under the new mining method. However, this void-filling provides the necessary ground stability for current and future mining, whilst increasing the volume of tailings stored underground and thus further reducing the quantity that needs to be stored on surface. The first long-hole stopes have also been put into production, and additional stopes will follow during H2 2024 and in 2025.

Construction of the Dry Stack Tailings Plant remains on track, with initial placement of filter cake on the engineered landform scheduled for H2 2024.

A total of 3,183 metres of the Central Decline have now been developed, connecting with the 800 metre level during Q2 2024. Completion and connection with the 750 metre level is planned for Q4 2024.

Group cash and debt position

At 30 June 2024, CAML had cash in the bank of $56.4 million and no significant debt.

 

For further information contact:

Central Asia Metals

Tel: +44 (0) 20 7898 9001

Nigel Robinson

CEO

Gavin Ferrar

CFO

Louise Wrathall

louise.wrathall@centralasiametals.com

Director of Corporate Development

Richard Morgan

richard.morgan@centralasiametals.com

Investor Relations Manager

 

 

Peel Hunt (Nominated Advisor and Joint Broker)

Tel: +44 (0) 20 7418 8900

Ross Allister

 

David McKeown

Emily Bhasin

 

 

 

BMO Capital Markets (Joint Broker)

Tel: +44 (0) 20 7236 1010

Thomas Rider

 

Pascal Lussier Duquette

 

 

 

BlytheRay (PR Advisors)

Tel: +44 (0) 20 7138 3204

Tim Blythe

 

Megan Ray

 

 

Note to editors:

 

Central Asia Metals, an AIM-listed UK company based in London, owns 100% of the Kounrad SX-EW copper project in central Kazakhstan and 100% of the Sasa zinc-lead mine in North Macedonia. The Company also owns an 80% interest in CAML Exploration, a subsidiary that was formed to progress early exploration opportunities in Kazakhstan, and a 28.7% interest in Aberdeen Minerals Ltd, a privately owned UK company focused on the exploration and development of base metals opportunities in northeast Scotland.

 

For further information, please visit www.centralasiametals.com and follow CAML on X at @CamlMetals and on LinkedIn at Central Asia Metals Plc

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDQBLFFZDLXBBQ
Date   Source Headline
24th Apr 20177:30 amRNSGrant of Options
13th Apr 20174:26 pmRNSDirector/PDMR Shareholding
5th Apr 20174:01 pmRNSHolding(s) in Company
4th Apr 20177:00 amRNSQ1 2017 Production Update
4th Apr 20177:00 amRNSFinal Results
15th Mar 20177:00 amRNSNotice of Preliminary Results
19th Jan 20174:08 pmRNSHolding(s) in Company
18th Jan 20177:00 amRNSResults of the Copper Bay DFS
5th Jan 20177:00 amRNS2016 Operations Update
12th Dec 201612:46 pmRNSDirector/PDMR Shareholding
22nd Nov 20163:13 pmRNSAgreement signed to acquire Shuak copper property
5th Oct 20167:00 amRNSQ3 2016 Operations Update
13th Sep 20163:03 pmRNSUpdate research from QuotedData
12th Sep 20167:00 amRNSHalf-year Report
22nd Aug 201610:00 amRNSNew corporate website
22nd Aug 20167:00 amRNSNotice of Results
4th Jul 201612:34 pmRNSHolding(s) in Company
4th Jul 20167:00 amRNSOperations Update to 30 June 2016
8th Jun 20161:05 pmRNSResult of AGM
9th May 20168:00 amRNSExercise of Options and Directors' Dealings
27th Apr 20165:57 pmRNSAnnual Report and Accounts 2015 and Notice of AGM
21st Apr 201610:47 amRNSUpdate research from QuotedData
19th Apr 20167:30 amRNSGrant of Options
11th Apr 20168:09 amRNSNet Asset Value(s)
11th Apr 20167:00 amRNSFinal Results
7th Apr 20167:00 amRNSQ1 2016 Production Update
23rd Mar 20169:18 amRNSNotice of Results
9th Mar 20167:45 amRNSInitiation Research from QuotedData
15th Jan 201612:36 pmRNSHolding(s) in Company
6th Jan 20167:00 amRNS2015 Production Update and 2016 Outlook
8th Dec 20153:29 pmRNSAppointment of Non-Executive Director
30th Nov 201511:00 amRNSHolding(s) in Company
23rd Nov 20157:00 amRNSKounrad Update
5th Oct 20157:00 amRNSQ3 2015 Production Update
14th Sep 20157:00 amRNSHalf Yearly Report
28th Aug 201510:00 amRNSNotification of Major Interest in Shares
27th Aug 201510:30 amRNSNotice of Results
26th Aug 201512:57 pmRNSNotification of Major Interest in Shares
3rd Jul 20157:00 amRNSKounrad Production Update
29th Jun 20157:00 amRNSKounrad Production Update
25th Jun 20157:30 amRNSExercise of Options and Directors' Dealings
24th Jun 20157:00 amRNSUpdate on Copper Bay Investment
17th Jun 20151:20 pmRNSResult of AGM
21st May 20157:00 amRNSKounrad Expansion Update
20th May 20154:30 pmRNSPosting Notice of Meeting and Dividend Timetable
23rd Apr 20157:31 amRNSDirector Shareholding
23rd Apr 20157:30 amRNSGrant of Options
21st Apr 20154:48 pmRNSAnnual Report and Accounts 2014
15th Apr 201511:21 amRNSProposed Share Premium Cancellation& result of EGM
7th Apr 20157:00 amRNSQ1 2015 Production Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.