Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBezant Resources PLC Regulatory News (BZT)

Share Price Information for Bezant Resources PLC (BZT)

Share Price is delayed by 15 minutes
Get Live Data
0.125    0.00 (0.00%)
Bid:
0.12
Ask:
0.13
Spread: 0.01 (8.333%)
Market Cap: £27.33m
BZT Live PriceLast checked at - London Stock Exchange

Intraday Bezant Resources PLC Share Chart

Scoping Study Commissioned

23 Aug 2010 07:00

RNS Number : 4512R
Bezant Resources PLC
23 August 2010
 

23 August 2010

 

Bezant Resources Plc

("Bezant" or the "Company")

 

Independent Scoping Study Commissioned

 

Bezant has awarded a contract to conduct a conceptual mining study on its Mankayan Copper Gold Project in the Philippines

 

Bezant (AIM: BZT), the AIM listed gold and copper exploration and development company operating in the Philippines and Tanzania, announces that a conceptual (technical and economic) study has been commissioned on its Mankayan Project located on the Island of Luzon, approximately 260km north of Manila in the Philippines. The study's scope will consider an underground mining operation with associated processing facilities and infrastructure. Key deliverables will include a recommendation as to the optimum mining rate, a preliminary implementation plan and a financial model. TWP Australia Pty Limited ("TWP") and Mining Plus Pty Limited ("Mining Plus"), have been contracted as independent consultants to conduct the study. TWP will be focussing on the infrastructure and surface facilities whilst Mining Plus will be working as a subcontractor to TWP, responsible for mine design and scheduling.

 

The study will consider all available data compiled on the Mankayan Project, which has a JORC compliant mineral resource of 221.6 million tonnes Indicated and 36.2 million tonnes Inferred at a 0.4% copper cut-off. This equates to an Indicated Resource of 2.42 billion pounds (1.1 million tonnes) of copper and 3.7 million ounces of gold, with a further Inferred Resource of 0.44 billion pounds (0.2 million tonnes) of copper and 600,000 ounces of gold. This resource and the current level of geological modelling of the ore bodies has justified the commencement of this preliminary technical and economic conceptual mining study, in order to assess the economic viability for a mine on the site. It is currently intended that the results of the study will be used to validate the further work required to initiate and complete a full pre-feasibility study.

 

The scope of the study aims to outline the following:

 

- a review of the resource model, geotechnical parameters and rock strengths, hydrological considerations, gas regimes, mine access and ventilation requirements;

- a review of environmental and cultural considerations;

- the approach and design considerations for a mineable resource model, mine production rate, the preferred mining method, ore / waste determination, mining limits and the overall mine layout;

- the design of a production sequence and schedule, review of mine equipment requirements and an estimate for the overburden and waste disposal parameters within an operations summary;

- conceptual estimate for the mine operations management, mine equipment operation and maintenance, schedule of mine operation activities and human resource complements;

- conceptual estimate of infrastructure requirements, mine capital expenditure and operational costs;

- the design of an implementation plan and financial model;

- high level risk management assessment; and

- identification of the design parameters for future studies.

 

The study is expected to be completed within the next four months and Bezant plans to utilise the independent report to form the basis for further more in-depth studies, which should lead to the eventual completion of a pre-feasibility study. The completed study is expected to contribute significantly to the Company's understanding of the economics associated with the deposit and the Company's current review process shall also consider, inter alia, the identification of potential commercial or joint venture partners to finance and develop the project through to future production, the possible divestment of all or part of the Company's interest in the project, or provide for further evaluation and development of the project to a more advanced stage by Bezant alone.

 

Gerry Nealon, Executive Chairman, commented:

 

"The results of our exploration, drilling, geotechnical and metallurgical studies to date have clearly demonstrated that the Company's Mankayan Project, adjacent to Lepanto Consolidated Mining Company's existing mining operations, is potentially capable of hosting a world-class copper/gold mine.

 

The addition of this conceptual study to the ongoing review process will assist us in identifying the most attractive route for taking the project forward and unlocking maximum shareholder value and we look forward to announcing the results of the study in due course."

 

 

 

Dr Bernard Oliver has reviewed and approved the technical information contained within this press release in his capacity as a competent person, as required under the AIM rules. Dr Olivier is a Member of the Australasian Institute of Mining and Metallurgy.

 

 

For further information, please contact:

 

Gerry Nealon

Executive Chairman, Bezant Resources Plc

Tel: +61 41 754 1873

 

Bernard Olivier

Executive Director, Bezant Resources Plc

Tel: +61 40 894 8182

 

James Harris / Matthew Chandler

Strand Hanson Limited

Tel: +44 (0)20 7409 3494

 

Alastair Stratton

Matrix Corporate Capital LLP

Tel: +44 (0)20 3206 7000

 

Laurence Read / Beth Harris

Threadneedle Communications (UK)

Email: Laurence.Read@threadneedlepr.co.uk

Tel: +44 (0)20 7653 9855

Mob: +44 (0)7979 955 923

 

or visit www.bezantresources.com

 

Notes for editors:

 

Mankayan Copper and Gold Project, Philippines

The Mineral and Production Sharing Agreement covers a total of 534 hectares in the Guinaoang area of the Philippines (the "Mankayan Project"). This is located in the Mankayan-Lepanto mining district, an area of porphyry copper belts in the Philippines and is similar to several deposits that have already been developed, such as the St Thomas deposit near Baguio City. The site is adjacent to the copper/gold mine owned and run by Lepanto Consolidated Mining Company. The Mankayan-Lepanto area has been mined for centuries and is readily accessible by both road and air. The Mankayan deposit was discovered in the early 1970s and since then has been extensively drilled, with four historical programmes having been completed covering more than 45,000 metres of diamond drilling over 48 holes. From late 2007 to mid 2009, Bezant completed a 9,778 metre drill programme over 9 holes along the full strike length of the deposit to expand and test the validity of the historical drilling results and to provide samples for density and metallurgical analysis. In July 2009, the Company announced an independent upgraded JORC compliant Mineral Resource, reported by Snowden Mining Industry Consultants Pty Limited, of 221.6 million tonnes Indicated and 36.2 million tonnes Inferred at a 0.4% copper cut-off, grading at 0.49% for copper and 0.52g/t for gold. The independent Resource estimate serves to support the Company's belief that its Mankayan Project represents a world-class copper and gold deposit, containing approximately 2.9 billion pounds (1.3 million tonnes) of copper and 4.3 million ounces of gold.

 

TWP

Founded in 1982, TWP has grown into a highly capable ISO 9001:2000 accredited multi-disciplinary resource and infrastructure focused project design house providing a full range of mining, process, energy, infrastructure and project management solutions. TWP commenced operations in Australia during 2006 as a subsidiary of TWP Holdings Limited, part of the Basil Read Group in South Africa. The company's project portfolio has a capital value of more than US$10 billion with offices located in Australia, South Africa, Zambia, Mozambique, Abu Dhabi and Peru (www.twpaustralia.com.au).

 

Mining Plus

Mining Plus is an innovative and practical consultancy company located in Perth, Melbourne and Kalgoorlie with affiliates overseas. It provides technical consulting services to Australian and International mining and exploration companies with experience of similar conceptual mining studies for a range of clients and commodities throughout the world (www.miningplus.com.au).

 

Glossary of technical terms:

 

"Indicated Mineral Resource"

 

That part of a Mineral Resource for which tonnage, densities, shape, physical characteristics, grade and mineral content can be estimated with a reasonable level of confidence. It is based on exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes. The locations are too widely or inappropriately spaced to confirm geological and/or grade continuity but are spaced closely enough for continuity to be assumed.

 

"Inferred Mineral Resource"

That part of a Mineral Resource for which tonnage, grade and mineral content can be estimated with a low level of confidence. It is inferred from geological evidence and assumed but not verified geological and/or grade continuity. It is based on information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes which may be limited or of uncertain quality and reliability.

 

"JORC"

The Joint Ore Reserves Committee: The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves, as published by the Joint Ore Reserves Committee of The Australasian Institute of Mining and Metallurgy, Australian Institute of Geoscientists and Minerals Council of Australia.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCGXGDIIBDBGGX
Date   Source Headline
20th Sep 20217:00 amRNSUpdate on Minemba Prospect, Zambia
16th Sep 202112:15 pmRNSPrice Monitoring Extension
14th Sep 202111:05 amRNSSecond Price Monitoring Extn
14th Sep 202111:00 amRNSPrice Monitoring Extension
13th Sep 20217:00 amRNSMankayan Project Update
26th Aug 20217:00 amRNSSelection of Targets for Review and Joint Venture
26th Aug 20217:00 amRNSInitial exploration targets selected re Caerus
2nd Aug 20217:00 amRNSOption Agreement with Caerus Mineral Resources PLC
22nd Jul 20214:40 pmRNSSecond Price Monitoring Extn
22nd Jul 20214:36 pmRNSPrice Monitoring Extension
29th Jun 20212:08 pmRNSFinal Results and Publication of Annual Report
28th Jun 202111:01 amRNSPrice Monitoring Extension
24th Jun 20217:00 amRNSUpdate on Kanye Manganese Project, Botswana
18th Jun 20214:40 pmRNSSecond Price Monitoring Extn
18th Jun 20214:35 pmRNSPrice Monitoring Extension
14th Jun 20212:00 pmRNSPrice Monitoring Extension
2nd Jun 20211:50 pmRNSPrelim Evaluation of Airborne EM Survey at Hope
17th May 20214:36 pmRNSExercise of Warrants, Total Voting Rights
11th May 20213:34 pmRNSExercise of Warrants, Total Voting Rights
7th May 20214:40 pmRNSSecond Price Monitoring Extn
7th May 20214:35 pmRNSPrice Monitoring Extension
7th May 20213:09 pmRNSExercise of Warrants, Total Voting Rights
7th May 20212:05 pmRNSSecond Price Monitoring Extn
7th May 20212:00 pmRNSPrice Monitoring Extension
29th Apr 20212:05 pmRNSSecond Price Monitoring Extn
29th Apr 20212:00 pmRNSPrice Monitoring Extension
29th Apr 202111:05 amRNSSecond Price Monitoring Extn
29th Apr 202111:00 amRNSPrice Monitoring Extension
28th Apr 20211:02 pmRNSTermination of Transaction Agreement with MMIH
28th Apr 202112:50 pmRNSExercise of Warrants & Total Voting Rights
27th Apr 20214:41 pmRNSSecond Price Monitoring Extn
27th Apr 20214:36 pmRNSPrice Monitoring Extension
23rd Apr 202111:05 amRNSSecond Price Monitoring Extn
23rd Apr 202111:00 amRNSPrice Monitoring Extension
22nd Apr 20214:33 pmRNSMinemba Prospect Kalengwa Copper Project, Zambia
21st Apr 202110:41 amRNSAirborne Survey at Hope Copper-Gold Project
12th Apr 20212:22 pmRNSMinemba Prospect Kalengwa Copper Project, Zambia
12th Apr 202111:06 amRNSSecond Price Monitoring Extn
12th Apr 202111:00 amRNSPrice Monitoring Extension
8th Apr 20215:06 pmRNSMMIH Reverse Transaction with AsiaPhos Terminated
4th Mar 20219:44 amRNSHolding(s) in Company
1st Mar 202112:24 pmRNSIssue of Equity and Total Voting Rights
26th Feb 20213:08 pmRNSTotal Voting Rights
23rd Feb 202111:58 amRNSDrill Planning for Kalengwa Copper Project, Zambia
12th Feb 20217:00 amRNSAcquisition of Metrock Completed & Issue of Equity
14th Jan 20217:00 amRNSDrilling Results at Hope Copper-Gold Project
31st Dec 20207:00 amRNSTotal Voting Rights
22nd Dec 20202:32 pmRNSExercise of Warrants, Total Voting Rights
22nd Dec 20207:00 amRNSConditional Acquisition of Metrock Resources Ltd
10th Dec 20209:39 amRNSExercise of Warrants, Total Voting Rights

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.