Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBezant Res Regulatory News (BZT)

Share Price Information for Bezant Res (BZT)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.02
Bid: 0.017
Ask: 0.023
Change: 0.00 (0.00%)
Spread: 0.006 (35.294%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 0.02
BZT Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Scoping Study Commissioned

23 Aug 2010 07:00

RNS Number : 4512R
Bezant Resources PLC
23 August 2010
 

23 August 2010

 

Bezant Resources Plc

("Bezant" or the "Company")

 

Independent Scoping Study Commissioned

 

Bezant has awarded a contract to conduct a conceptual mining study on its Mankayan Copper Gold Project in the Philippines

 

Bezant (AIM: BZT), the AIM listed gold and copper exploration and development company operating in the Philippines and Tanzania, announces that a conceptual (technical and economic) study has been commissioned on its Mankayan Project located on the Island of Luzon, approximately 260km north of Manila in the Philippines. The study's scope will consider an underground mining operation with associated processing facilities and infrastructure. Key deliverables will include a recommendation as to the optimum mining rate, a preliminary implementation plan and a financial model. TWP Australia Pty Limited ("TWP") and Mining Plus Pty Limited ("Mining Plus"), have been contracted as independent consultants to conduct the study. TWP will be focussing on the infrastructure and surface facilities whilst Mining Plus will be working as a subcontractor to TWP, responsible for mine design and scheduling.

 

The study will consider all available data compiled on the Mankayan Project, which has a JORC compliant mineral resource of 221.6 million tonnes Indicated and 36.2 million tonnes Inferred at a 0.4% copper cut-off. This equates to an Indicated Resource of 2.42 billion pounds (1.1 million tonnes) of copper and 3.7 million ounces of gold, with a further Inferred Resource of 0.44 billion pounds (0.2 million tonnes) of copper and 600,000 ounces of gold. This resource and the current level of geological modelling of the ore bodies has justified the commencement of this preliminary technical and economic conceptual mining study, in order to assess the economic viability for a mine on the site. It is currently intended that the results of the study will be used to validate the further work required to initiate and complete a full pre-feasibility study.

 

The scope of the study aims to outline the following:

 

- a review of the resource model, geotechnical parameters and rock strengths, hydrological considerations, gas regimes, mine access and ventilation requirements;

- a review of environmental and cultural considerations;

- the approach and design considerations for a mineable resource model, mine production rate, the preferred mining method, ore / waste determination, mining limits and the overall mine layout;

- the design of a production sequence and schedule, review of mine equipment requirements and an estimate for the overburden and waste disposal parameters within an operations summary;

- conceptual estimate for the mine operations management, mine equipment operation and maintenance, schedule of mine operation activities and human resource complements;

- conceptual estimate of infrastructure requirements, mine capital expenditure and operational costs;

- the design of an implementation plan and financial model;

- high level risk management assessment; and

- identification of the design parameters for future studies.

 

The study is expected to be completed within the next four months and Bezant plans to utilise the independent report to form the basis for further more in-depth studies, which should lead to the eventual completion of a pre-feasibility study. The completed study is expected to contribute significantly to the Company's understanding of the economics associated with the deposit and the Company's current review process shall also consider, inter alia, the identification of potential commercial or joint venture partners to finance and develop the project through to future production, the possible divestment of all or part of the Company's interest in the project, or provide for further evaluation and development of the project to a more advanced stage by Bezant alone.

 

Gerry Nealon, Executive Chairman, commented:

 

"The results of our exploration, drilling, geotechnical and metallurgical studies to date have clearly demonstrated that the Company's Mankayan Project, adjacent to Lepanto Consolidated Mining Company's existing mining operations, is potentially capable of hosting a world-class copper/gold mine.

 

The addition of this conceptual study to the ongoing review process will assist us in identifying the most attractive route for taking the project forward and unlocking maximum shareholder value and we look forward to announcing the results of the study in due course."

 

 

 

Dr Bernard Oliver has reviewed and approved the technical information contained within this press release in his capacity as a competent person, as required under the AIM rules. Dr Olivier is a Member of the Australasian Institute of Mining and Metallurgy.

 

 

For further information, please contact:

 

Gerry Nealon

Executive Chairman, Bezant Resources Plc

Tel: +61 41 754 1873

 

Bernard Olivier

Executive Director, Bezant Resources Plc

Tel: +61 40 894 8182

 

James Harris / Matthew Chandler

Strand Hanson Limited

Tel: +44 (0)20 7409 3494

 

Alastair Stratton

Matrix Corporate Capital LLP

Tel: +44 (0)20 3206 7000

 

Laurence Read / Beth Harris

Threadneedle Communications (UK)

Email: Laurence.Read@threadneedlepr.co.uk

Tel: +44 (0)20 7653 9855

Mob: +44 (0)7979 955 923

 

or visit www.bezantresources.com

 

Notes for editors:

 

Mankayan Copper and Gold Project, Philippines

The Mineral and Production Sharing Agreement covers a total of 534 hectares in the Guinaoang area of the Philippines (the "Mankayan Project"). This is located in the Mankayan-Lepanto mining district, an area of porphyry copper belts in the Philippines and is similar to several deposits that have already been developed, such as the St Thomas deposit near Baguio City. The site is adjacent to the copper/gold mine owned and run by Lepanto Consolidated Mining Company. The Mankayan-Lepanto area has been mined for centuries and is readily accessible by both road and air. The Mankayan deposit was discovered in the early 1970s and since then has been extensively drilled, with four historical programmes having been completed covering more than 45,000 metres of diamond drilling over 48 holes. From late 2007 to mid 2009, Bezant completed a 9,778 metre drill programme over 9 holes along the full strike length of the deposit to expand and test the validity of the historical drilling results and to provide samples for density and metallurgical analysis. In July 2009, the Company announced an independent upgraded JORC compliant Mineral Resource, reported by Snowden Mining Industry Consultants Pty Limited, of 221.6 million tonnes Indicated and 36.2 million tonnes Inferred at a 0.4% copper cut-off, grading at 0.49% for copper and 0.52g/t for gold. The independent Resource estimate serves to support the Company's belief that its Mankayan Project represents a world-class copper and gold deposit, containing approximately 2.9 billion pounds (1.3 million tonnes) of copper and 4.3 million ounces of gold.

 

TWP

Founded in 1982, TWP has grown into a highly capable ISO 9001:2000 accredited multi-disciplinary resource and infrastructure focused project design house providing a full range of mining, process, energy, infrastructure and project management solutions. TWP commenced operations in Australia during 2006 as a subsidiary of TWP Holdings Limited, part of the Basil Read Group in South Africa. The company's project portfolio has a capital value of more than US$10 billion with offices located in Australia, South Africa, Zambia, Mozambique, Abu Dhabi and Peru (www.twpaustralia.com.au).

 

Mining Plus

Mining Plus is an innovative and practical consultancy company located in Perth, Melbourne and Kalgoorlie with affiliates overseas. It provides technical consulting services to Australian and International mining and exploration companies with experience of similar conceptual mining studies for a range of clients and commodities throughout the world (www.miningplus.com.au).

 

Glossary of technical terms:

 

"Indicated Mineral Resource"

 

That part of a Mineral Resource for which tonnage, densities, shape, physical characteristics, grade and mineral content can be estimated with a reasonable level of confidence. It is based on exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes. The locations are too widely or inappropriately spaced to confirm geological and/or grade continuity but are spaced closely enough for continuity to be assumed.

 

"Inferred Mineral Resource"

That part of a Mineral Resource for which tonnage, grade and mineral content can be estimated with a low level of confidence. It is inferred from geological evidence and assumed but not verified geological and/or grade continuity. It is based on information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes which may be limited or of uncertain quality and reliability.

 

"JORC"

The Joint Ore Reserves Committee: The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves, as published by the Joint Ore Reserves Committee of The Australasian Institute of Mining and Metallurgy, Australian Institute of Geoscientists and Minerals Council of Australia.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCGXGDIIBDBGGX
Date   Source Headline
15th Mar 20247:00 amRNSGrant of Options - Directors/PDMRs Shareholdings
14th Mar 20247:00 amRNSUpdate on Hope & Gorob Copper – Gold Project
5th Mar 20247:00 amRNSFunding Facility Repayment Extension
9th Feb 20247:00 amRNSHope & Gorob Copper – Gold Project, Namibia Update
29th Dec 202311:16 amRNSTotal Voting Rights
19th Dec 20239:18 amRNSHolding(s) in Company
4th Dec 20237:00 amRNSPlacing, Issue of Shares, PDMR Shareholdings &TVR
17th Nov 20232:22 pmRNSHolding(s) in Company
10th Nov 20237:00 amRNSIssue of Shares and TVR
27th Oct 20237:00 amRNSHope & Gorob Updated Mineral Resource Estimate
29th Sep 20237:00 amRNSHalf-year Report
6th Sep 20237:00 amRNSUpdate on Projects
28th Jul 20231:17 pmRNSResult of AGM
24th Jul 20232:49 pmRNSKanye Project: Metallurgical Test Work Results
4th Jul 202310:00 amRNSNotice of AGM and 2022 Accounts
30th Jun 20237:00 amRNSFinal Results
15th Jun 20237:00 amRNSFunding Facility Extension, Issue of Shares, TVR
31st May 20232:41 pmRNSTotal Voting Rights
5th May 202311:33 amRNSIssue of Shares and TVR
4th May 20231:07 pmRNSTotal Voting Rights
12th Apr 20237:00 amRNSFund raise, Director fees, joint Broker and TVR
27th Mar 202311:53 amRNSMankayan Project Update
1st Mar 20232:49 pmRNSMankayan Project Update
9th Feb 20232:58 pmRNSMaiden Kanye Drill Programme, update Hope & Gorob
9th Jan 20237:00 amRNSIssue of Equity and TVR
15th Nov 20224:35 pmRNSPrice Monitoring Extension
26th Oct 202212:21 pmRNSMankayan Project Update
18th Oct 20221:56 pmRNSTermination by mutual consent of Cyprus JV
3rd Oct 20223:34 pmRNSStatement re Cyprus Joint Venture with Caerus
30th Sep 20227:00 amRNSInterim Results for Six Months Ended 30 June 2022
14th Sep 20227:00 amRNSUpdate on Kanye Manganese Project in Botswana
31st Aug 202212:01 pmRNSTotal Voting Rights
24th Aug 20227:00 amRNSResult of AGM
11th Aug 20223:37 pmRNSExercise of Warrants, Total Voting Rights
9th Aug 20227:00 amRNSHope and Gorob Project Update
29th Jul 20222:24 pmRNSTotal Voting Rights
29th Jul 202211:00 amRNSNotice of AGM
7th Jul 20221:58 pmRNSExercise of Warrants, Total Voting Rights
30th Jun 20226:09 pmRNSFinal Results and Publication of Annual Report
30th Jun 202211:21 amRNS£700,000 Drawdown under Funding Facility
14th Jun 20227:00 amRNSHope and Gorob Project Shallow Drilling Update
8th Jun 20227:00 amRNSCyprus Joint Venture Drilling Update
30th May 20224:27 pmRNSDirector's Dealing
30th May 202212:34 pmRNSDirector's Dealing
12th May 20223:02 pmRNSExercise of Warrants, Total Voting Rights
3rd May 20227:00 amRNSCyprus Joint Venture Drilling Update
27th Apr 20227:00 amRNSCyprus Joint Venture Update
7th Apr 20229:00 amRNSPrice Monitoring Extension
6th Apr 20227:00 amRNSMaiden Troulli Mineral Resource Estimate
6th Apr 20227:00 amRNSCyprus Joint Venture Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.