Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBezant Resources PLC Regulatory News (BZT)

Share Price Information for Bezant Resources PLC (BZT)

Share Price is delayed by 15 minutes
Get Live Data
0.12    -0.005 (-4.00%)
Bid:
0.11
Ask:
0.13
Spread: 0.02 (18.182%)
Market Cap: £26.24m
BZT Live PriceLast checked at - London Stock Exchange

Intraday Bezant Resources PLC Share Chart

Scoping Study Commissioned

23 Aug 2010 07:00

RNS Number : 4512R
Bezant Resources PLC
23 August 2010
 

23 August 2010

 

Bezant Resources Plc

("Bezant" or the "Company")

 

Independent Scoping Study Commissioned

 

Bezant has awarded a contract to conduct a conceptual mining study on its Mankayan Copper Gold Project in the Philippines

 

Bezant (AIM: BZT), the AIM listed gold and copper exploration and development company operating in the Philippines and Tanzania, announces that a conceptual (technical and economic) study has been commissioned on its Mankayan Project located on the Island of Luzon, approximately 260km north of Manila in the Philippines. The study's scope will consider an underground mining operation with associated processing facilities and infrastructure. Key deliverables will include a recommendation as to the optimum mining rate, a preliminary implementation plan and a financial model. TWP Australia Pty Limited ("TWP") and Mining Plus Pty Limited ("Mining Plus"), have been contracted as independent consultants to conduct the study. TWP will be focussing on the infrastructure and surface facilities whilst Mining Plus will be working as a subcontractor to TWP, responsible for mine design and scheduling.

 

The study will consider all available data compiled on the Mankayan Project, which has a JORC compliant mineral resource of 221.6 million tonnes Indicated and 36.2 million tonnes Inferred at a 0.4% copper cut-off. This equates to an Indicated Resource of 2.42 billion pounds (1.1 million tonnes) of copper and 3.7 million ounces of gold, with a further Inferred Resource of 0.44 billion pounds (0.2 million tonnes) of copper and 600,000 ounces of gold. This resource and the current level of geological modelling of the ore bodies has justified the commencement of this preliminary technical and economic conceptual mining study, in order to assess the economic viability for a mine on the site. It is currently intended that the results of the study will be used to validate the further work required to initiate and complete a full pre-feasibility study.

 

The scope of the study aims to outline the following:

 

- a review of the resource model, geotechnical parameters and rock strengths, hydrological considerations, gas regimes, mine access and ventilation requirements;

- a review of environmental and cultural considerations;

- the approach and design considerations for a mineable resource model, mine production rate, the preferred mining method, ore / waste determination, mining limits and the overall mine layout;

- the design of a production sequence and schedule, review of mine equipment requirements and an estimate for the overburden and waste disposal parameters within an operations summary;

- conceptual estimate for the mine operations management, mine equipment operation and maintenance, schedule of mine operation activities and human resource complements;

- conceptual estimate of infrastructure requirements, mine capital expenditure and operational costs;

- the design of an implementation plan and financial model;

- high level risk management assessment; and

- identification of the design parameters for future studies.

 

The study is expected to be completed within the next four months and Bezant plans to utilise the independent report to form the basis for further more in-depth studies, which should lead to the eventual completion of a pre-feasibility study. The completed study is expected to contribute significantly to the Company's understanding of the economics associated with the deposit and the Company's current review process shall also consider, inter alia, the identification of potential commercial or joint venture partners to finance and develop the project through to future production, the possible divestment of all or part of the Company's interest in the project, or provide for further evaluation and development of the project to a more advanced stage by Bezant alone.

 

Gerry Nealon, Executive Chairman, commented:

 

"The results of our exploration, drilling, geotechnical and metallurgical studies to date have clearly demonstrated that the Company's Mankayan Project, adjacent to Lepanto Consolidated Mining Company's existing mining operations, is potentially capable of hosting a world-class copper/gold mine.

 

The addition of this conceptual study to the ongoing review process will assist us in identifying the most attractive route for taking the project forward and unlocking maximum shareholder value and we look forward to announcing the results of the study in due course."

 

 

 

Dr Bernard Oliver has reviewed and approved the technical information contained within this press release in his capacity as a competent person, as required under the AIM rules. Dr Olivier is a Member of the Australasian Institute of Mining and Metallurgy.

 

 

For further information, please contact:

 

Gerry Nealon

Executive Chairman, Bezant Resources Plc

Tel: +61 41 754 1873

 

Bernard Olivier

Executive Director, Bezant Resources Plc

Tel: +61 40 894 8182

 

James Harris / Matthew Chandler

Strand Hanson Limited

Tel: +44 (0)20 7409 3494

 

Alastair Stratton

Matrix Corporate Capital LLP

Tel: +44 (0)20 3206 7000

 

Laurence Read / Beth Harris

Threadneedle Communications (UK)

Email: Laurence.Read@threadneedlepr.co.uk

Tel: +44 (0)20 7653 9855

Mob: +44 (0)7979 955 923

 

or visit www.bezantresources.com

 

Notes for editors:

 

Mankayan Copper and Gold Project, Philippines

The Mineral and Production Sharing Agreement covers a total of 534 hectares in the Guinaoang area of the Philippines (the "Mankayan Project"). This is located in the Mankayan-Lepanto mining district, an area of porphyry copper belts in the Philippines and is similar to several deposits that have already been developed, such as the St Thomas deposit near Baguio City. The site is adjacent to the copper/gold mine owned and run by Lepanto Consolidated Mining Company. The Mankayan-Lepanto area has been mined for centuries and is readily accessible by both road and air. The Mankayan deposit was discovered in the early 1970s and since then has been extensively drilled, with four historical programmes having been completed covering more than 45,000 metres of diamond drilling over 48 holes. From late 2007 to mid 2009, Bezant completed a 9,778 metre drill programme over 9 holes along the full strike length of the deposit to expand and test the validity of the historical drilling results and to provide samples for density and metallurgical analysis. In July 2009, the Company announced an independent upgraded JORC compliant Mineral Resource, reported by Snowden Mining Industry Consultants Pty Limited, of 221.6 million tonnes Indicated and 36.2 million tonnes Inferred at a 0.4% copper cut-off, grading at 0.49% for copper and 0.52g/t for gold. The independent Resource estimate serves to support the Company's belief that its Mankayan Project represents a world-class copper and gold deposit, containing approximately 2.9 billion pounds (1.3 million tonnes) of copper and 4.3 million ounces of gold.

 

TWP

Founded in 1982, TWP has grown into a highly capable ISO 9001:2000 accredited multi-disciplinary resource and infrastructure focused project design house providing a full range of mining, process, energy, infrastructure and project management solutions. TWP commenced operations in Australia during 2006 as a subsidiary of TWP Holdings Limited, part of the Basil Read Group in South Africa. The company's project portfolio has a capital value of more than US$10 billion with offices located in Australia, South Africa, Zambia, Mozambique, Abu Dhabi and Peru (www.twpaustralia.com.au).

 

Mining Plus

Mining Plus is an innovative and practical consultancy company located in Perth, Melbourne and Kalgoorlie with affiliates overseas. It provides technical consulting services to Australian and International mining and exploration companies with experience of similar conceptual mining studies for a range of clients and commodities throughout the world (www.miningplus.com.au).

 

Glossary of technical terms:

 

"Indicated Mineral Resource"

 

That part of a Mineral Resource for which tonnage, densities, shape, physical characteristics, grade and mineral content can be estimated with a reasonable level of confidence. It is based on exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes. The locations are too widely or inappropriately spaced to confirm geological and/or grade continuity but are spaced closely enough for continuity to be assumed.

 

"Inferred Mineral Resource"

That part of a Mineral Resource for which tonnage, grade and mineral content can be estimated with a low level of confidence. It is inferred from geological evidence and assumed but not verified geological and/or grade continuity. It is based on information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes which may be limited or of uncertain quality and reliability.

 

"JORC"

The Joint Ore Reserves Committee: The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves, as published by the Joint Ore Reserves Committee of The Australasian Institute of Mining and Metallurgy, Australian Institute of Geoscientists and Minerals Council of Australia.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCGXGDIIBDBGGX
Date   Source Headline
15th Jan 20187:00 amRNSDirectorate Change and CEO Appointment
3rd Jan 20187:00 amRNSFinal Option Payment re Colombia
6th Dec 20172:15 pmRNSEquity fundraising to raise £550,000 gross
15th Nov 20177:00 amRNSGold-Platinum Recovery Update re Choco Project
9th Oct 20177:00 amRNSUpdate re Choco Gold-Platinum Project, Colombia
5th Oct 20177:00 amRNSEquity fundraising of approximately £700,000 gross
29th Sep 20178:20 amRNSInterim Results
19th Sep 20177:00 amRNSProduction Update re Choco Gold-Platinum Project
30th Aug 20178:00 amRNSGold-Platinum Sampling Programme at Choco Project
16th Aug 20177:00 amRNSInitial Gold-Platinum Production at Choco Project
7th Aug 20177:45 amRNSDirectors' Dealings and Issue of Equity
31st Jul 20177:00 amRNSUpdate re Choco Project, Colombia
6th Jul 20177:00 amRNSAppointment of Broker
5th Jul 20171:50 pmRNSEquity fundraising of approximately £585,000 gross
30th Jun 201710:45 amRNSResult of AGM
26th Jun 20177:00 amRNSUpdate re Plant Commissioning, Choco Project
8th Jun 201712:00 pmRNSCompletion of Acquisition of Kellstown Investments
5th Jun 20177:00 amRNSFinal Results
31st May 20177:00 amRNSAcquisition of Production Plant in Choco, Colombia
26th Apr 20179:30 amRNSExercise of Option
3rd Apr 20177:00 amRNSPhase 2 Gold & Platinum Recovery Results
21st Mar 20174:35 pmRNSPrice Monitoring Extension
21st Mar 20173:25 pmRNSEquity fundraising of approximately £1m gross
8th Mar 20177:00 amRNSScoping Study for Choco Gold-Platinum Project
2nd Mar 20174:35 pmRNSPrice Monitoring Extension
21st Feb 20172:06 pmRNSUpdate re Mankayan Project
24th Jan 20177:00 amRNSOperational update re Choco Gold-Platinum Project
9th Dec 20161:01 pmRNSResult of AGM
30th Nov 20167:00 amRNSColombia Exploration Sampling Update
16th Nov 20167:00 amRNSFinal Results
21st Oct 20162:05 pmRNSSecond Price Monitoring Extn
21st Oct 20162:00 pmRNSPrice Monitoring Extension
17th Oct 20167:00 amRNSCompletion of Acquisition of Colombian Mining Data
10th Oct 201610:25 amRNSOperational Update
28th Sep 201611:20 amRNSDirectors' Dealings
19th Sep 20164:40 pmRNSSecond Price Monitoring Extn
19th Sep 20164:35 pmRNSSecond Price Monitoring Extn
19th Sep 20162:05 pmRNSSecond Price Monitoring Extn
19th Sep 20162:00 pmRNSPrice Monitoring Extension
19th Sep 20161:00 pmRNSEquity fundraising of £1.19m gross
7th Sep 201610:45 amRNSExploration Agreement with Mining Contractor
31st Aug 201611:00 amRNSResult of General Meeting
11th Aug 20167:00 amRNSNotice of General Meeting
29th Mar 20167:00 amRNSInterim Results
21st Mar 20162:30 pmRNSAppointment of Sole Broker
27th Jan 20167:00 amRNSExercise of Option to Acquire Leeward
21st Jan 20167:00 amRNSExtension of Option
22nd Dec 20159:15 amRNSExtension of Option
17th Dec 20157:00 amRNSChange of Broker
11th Dec 201512:03 pmRNSResult of AGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.