Talon Resources Targets Ontario Gold Growth After AIM Move and Eagle Lake Acquisition, CEO Says.Watch here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBezant Resources PLC Regulatory News (BZT)

Share Price Information for Bezant Resources PLC (BZT)

Share Price is delayed by 15 minutes
Get Live Data
0.135    -0.005 (-3.57%)
Bid:
0.13
Ask:
0.14
Spread: 0.01 (7.692%)
Market Cap: £30.16m
BZT Live PriceLast checked at - London Stock Exchange

Intraday Bezant Resources PLC Share Chart

Resource Update

17 Dec 2010 07:00

RNS Number : 1257Y
Bezant Resources PLC
17 December 2010
 



17 December 2010

 

Bezant Resources Plc

("Bezant" or the "Company")

 

Maiden 189Mt JORC Ore Reserve and Mineable Inventory Statement for the Mankayan Copper/Gold Project, Philippines

 

Highlights:

 

·; Maiden Independent Ore Reserve and Mineable Inventory Statement produced by Mining Plus (Perth) in accordance with the JORC Code, based on the historic resource estimate independently provided by Snowden in July 2009

·; Probable Ore Reserves of 189 million tonnes at 0.46% Copper and 0.49g/t Gold

·; Total Recoverable Metal Reserves of 811,000 tonnes of Copper and 2,210,000 ounces of Gold

·; Mineable Inventory increased to 389 million tonnes at 0.38% Copper and 0.42g/t Gold

·; Total Mineable inventory of 1.4 million tonnes of Copper and 3.9 million ounces of Gold

 

Bezant (AIM: BZT), the AIM listed gold and copper exploration and development company operating in the Philippines, Argentina and Tanzania, announces a maiden JORC compliant Ore Reserve and Mineable Inventory Statement for its Mankayan copper/gold Project, located 260km north of Manila in the Philippines.

 

The Mankayan Project Ore Reserve and Mineable Inventory Statements were prepared for Bezant by Mining Plus Pty. Ltd ("Mining Plus") as at 14 December 2010. The Ore Reserve Statement has been prepared in accordance with the guidelines of the Australasian Code for Reporting Exploration Results, Mineral Resources and Ore Reserves (JORC Code - 2004 edition).

The Ore Reserve and Mineable Inventory Statements stem from the mine design and production schedule produced by Mining Plus for Bezant as part of its Mankayan Block Cave Conceptual (technical and economic) Study. The mine design encompassing the Indicated, Inferred and unclassified material, was used to calculate the mineable section of the deposit and forms the basis of the Mineable Inventory Statement. The Ore Reserves produced by Mining Plus are based on the Resource Estimation independently provided by Snowden Mining Industry Consultants Pty. Ltd ("Snowden") and announced by the Company in July 2009 of 221.6Mt at 0.49% Copper and 0.52g/t Gold. The Ore Reserve estimates are shown in Table 1 and the Resource estimates in Table 2 below.

 

Table 1: Mankayan Project Ore Reserves

JORC (2004) Reserve Category

 

Tonnes

Grade

Metal Units

(Mt)

Cu

(%)

Au

(g/t)

Cu tonnes

(t)

Au

(ounces)

Probable

189

0.46

0.49

811,000

2,210,000

Proven

N/A

 

 

Table 2: Mankayan Project Ore Resources

JORC (2004) Resource Category

 

Tonnes

Grade

Metal Units

(Mt)

Cu

(%)

Au

(g/t)

Cu tonnes (t)

Au

(ounces)

Indicated

221.6

0.49

0.52

1,100,000

3,700,000

Inferred

36.2

0.44

0.48

200,000

600,000

Total

257.8

1,300,000

4,300,000

 

The following key assumptions were applied in producing the statements:

·; Metal prices of US$3/lb Copper and US$900/oz Gold were used to develop the cut-off grade.

·; Operating and capital cost estimates used in the evaluation of the "Probable Ore Reserve" were determined during the course of the conceptual study.

·; The Block Cave footprint was designed to a cut-off grade of 0.22% CuEq.*

·; The production schedule had an ore/waste classifier grade of 0.22% CuEq applied. This was determined against a completed mine design incorporating the finalised operating and capital cost estimates.

·; Metallurgical recoveries of 94% and 74% for copper and gold respectively were assumed, based on the independent metallurgical testwork results achieved to date.

 

* - Copper Equivalent ("CuEq") was calculated based on the parameters defined under the key assumptions.

 

The complete mine design was evaluated for approximately 389Mt of ore at an average grade of 0.38% Cu and 0.42g/t gold. The mine design incorporated Indicated, Inferred and unclassified material and resulted in a Mineable Inventory Statement (see Table 3 below).

 

Table 3: Total Mineable Inventory Statement

Tonnes

Grade

Metal Units

(Mt)

Cu

(%)

Au

(g/t)

Cu tonnes (Mt)

Au

(M ounces)

389

0.38

0.42

1.4**

3.9**

 

** - assuming metallurgical recoveries of 94% and 74% for copper and gold respectively.

 

Gerry Nealon, Executive Chairman, commented: 

"We are delighted to receive this independent maiden Ore Reserve Statement (JORC Compliant) for our flagship Mankayan Project based upon the results of our exploration, drilling, geotechnical and metallurgical studies to date, the latter having formed the basis of the Block Cave Conceptual (technical and economic) Scoping Study commissioned from Mining Plus. 

 

"The addition of this Ore Reserve status to the forthcoming results of the conceptual study and our ongoing review process, will assist us immensely in identifying the most attractive route for taking the project forward and unlocking maximum shareholder value. We look forward to announcing the full results of the conceptual scoping study in the very early part of the New Year."

 

The mining specific information in this announcement that relates to Ore Reserves is based on information compiled by Mr Peter Lock, who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Lock is employed full time by Mining Plus which was commissioned by Bezant in late August 2010 to produce a conceptual scoping study on the Company's Mankayan Project. Mr Lock has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr Lock consents to the inclusion in this announcement of the matters based on the information compiled for his study in the form and context in which it appears.

 

Dr Bernard Olivier has reviewed and approved the technical information contained within this announcement in his capacity as a qualified person, as required under the AIM rules. Dr Olivier is Technical Director of the Company and a Member of the Australasian Institute of Mining and Metallurgy.

 

For further information, please contact:

 

Gerry Nealon

Executive Chairman, Bezant Resources Plc

Tel: +61 41 754 1873

 

Bernard Olivier

Technical Director, Bezant Resources Plc

Tel: +61 40 894 8182

 

Evan Kirby

Non-Executive Director, Bezant Resources Plc

Tel: +61 41 221 2827

 

James Harris / Matthew Chandler / David Altberg

Strand Hanson Limited

Tel: +44 (0)20 7409 3494

 

Alastair Stratton

Matrix Corporate Capital LLP

Tel: +44 (0)20 3206 7000

 

Laurence Read / Beth Harris

Threadneedle Communications (UK)

Email: Laurence.Read@threadneedlepr.co.uk

Tel: +44 (0)20 7653 9855

Mob: +44 (0)7979 955 923

 

or visit http://www.bezantresources.com

 

Notes to editors:

 

Bezant is currently focussed primarily on the copper and gold mineral sector and its core flagship project remains its Mankayan copper/gold project situated in the Mankayan-Lepanto mining district of the Philippines, an area of established copper and gold mining. The deposit is located approximately 260km north of Manila and 6km east of the copper/gold mine owned and operated by Lepanto Consolidated Mining Company. Since its discovery in the early 1970s, extensive drilling (more than 45,000 metres over 48 holes) and metallurgical work has been undertaken by Goldfields Asia Ltd, Pacific Falkon and others. Bezant currently has a JORC compliant mineral resource of 221.6 million tonnes Indicated and 36.2 million tonnes Inferred, grading at 0.49% for copper and 0.52g/t for gold, at a 0.4% copper cut-off. This equates to an Indicated Resource of 2.42 billion pounds (1.1 million tonnes) of copper and 3.7 million ounces of gold, with a further Inferred Resource of 0.44 billion pounds (0.2 million tonnes) of copper and 600,000 ounces of gold.

 

Mining Plus

Mining Plus is an innovative and practical consultancy company located in Perth, Melbourne and Kalgoorlie with affiliates overseas. It provides technical consulting services to Australian and International mining and exploration companies with experience of similar conceptual mining studies for a range of clients and commodities throughout the world (www.miningplus.com.au).

 

Glossary of technical terms:

 

"Indicated Resource"

 

That part of a Mineral Resource for which tonnage, densities, shape, physical characteristics, grade and mineral content can be estimated with a reasonable level of confidence. It is based on exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes. The locations are too widely or inappropriately spaced to confirm geological and/or grade continuity but are spaced closely enough for continuity to be assumed.

 

"Inferred Resource"

 

 

 

 

 

"Ore Reserve"

That part of a Mineral Resource for which tonnage, grade and mineral content can be estimated with a low level of confidence. It is inferred from geological evidence and assumed but not verified geological and/or grade continuity. It is based on information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes which may be limited or of uncertain quality and reliability.

 

The economically mineable part of Measured and/or Indicated resources, including diluting materials and allowances for losses which may occur when the material is mined.

 

"JORC"

The Joint Ore Reserves Committee: The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves, as published by the Joint Ore Reserves Committee of The Australasian Institute of Mining and Metallurgy, Australian Institute of Geoscientists and Minerals Council of Australia.

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCEQLFFBLFZFBL
Date   Source Headline
6th Feb 201811:00 amRNSPrice Monitoring Extension
5th Feb 20187:00 amRNSEquity Fundraising to raise £600,000 (gross)
15th Jan 20187:00 amRNSDirectorate Change and CEO Appointment
3rd Jan 20187:00 amRNSFinal Option Payment re Colombia
6th Dec 20172:15 pmRNSEquity fundraising to raise £550,000 gross
15th Nov 20177:00 amRNSGold-Platinum Recovery Update re Choco Project
9th Oct 20177:00 amRNSUpdate re Choco Gold-Platinum Project, Colombia
5th Oct 20177:00 amRNSEquity fundraising of approximately £700,000 gross
29th Sep 20178:20 amRNSInterim Results
19th Sep 20177:00 amRNSProduction Update re Choco Gold-Platinum Project
30th Aug 20178:00 amRNSGold-Platinum Sampling Programme at Choco Project
16th Aug 20177:00 amRNSInitial Gold-Platinum Production at Choco Project
7th Aug 20177:45 amRNSDirectors' Dealings and Issue of Equity
31st Jul 20177:00 amRNSUpdate re Choco Project, Colombia
6th Jul 20177:00 amRNSAppointment of Broker
5th Jul 20171:50 pmRNSEquity fundraising of approximately £585,000 gross
30th Jun 201710:45 amRNSResult of AGM
26th Jun 20177:00 amRNSUpdate re Plant Commissioning, Choco Project
8th Jun 201712:00 pmRNSCompletion of Acquisition of Kellstown Investments
5th Jun 20177:00 amRNSFinal Results
31st May 20177:00 amRNSAcquisition of Production Plant in Choco, Colombia
26th Apr 20179:30 amRNSExercise of Option
3rd Apr 20177:00 amRNSPhase 2 Gold & Platinum Recovery Results
21st Mar 20174:35 pmRNSPrice Monitoring Extension
21st Mar 20173:25 pmRNSEquity fundraising of approximately £1m gross
8th Mar 20177:00 amRNSScoping Study for Choco Gold-Platinum Project
2nd Mar 20174:35 pmRNSPrice Monitoring Extension
21st Feb 20172:06 pmRNSUpdate re Mankayan Project
24th Jan 20177:00 amRNSOperational update re Choco Gold-Platinum Project
9th Dec 20161:01 pmRNSResult of AGM
30th Nov 20167:00 amRNSColombia Exploration Sampling Update
16th Nov 20167:00 amRNSFinal Results
21st Oct 20162:05 pmRNSSecond Price Monitoring Extn
21st Oct 20162:00 pmRNSPrice Monitoring Extension
17th Oct 20167:00 amRNSCompletion of Acquisition of Colombian Mining Data
10th Oct 201610:25 amRNSOperational Update
28th Sep 201611:20 amRNSDirectors' Dealings
19th Sep 20164:40 pmRNSSecond Price Monitoring Extn
19th Sep 20164:35 pmRNSSecond Price Monitoring Extn
19th Sep 20162:05 pmRNSSecond Price Monitoring Extn
19th Sep 20162:00 pmRNSPrice Monitoring Extension
19th Sep 20161:00 pmRNSEquity fundraising of £1.19m gross
7th Sep 201610:45 amRNSExploration Agreement with Mining Contractor
31st Aug 201611:00 amRNSResult of General Meeting
11th Aug 20167:00 amRNSNotice of General Meeting
29th Mar 20167:00 amRNSInterim Results
21st Mar 20162:30 pmRNSAppointment of Sole Broker
27th Jan 20167:00 amRNSExercise of Option to Acquire Leeward
21st Jan 20167:00 amRNSExtension of Option
22nd Dec 20159:15 amRNSExtension of Option

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.