Talon Resources Targets Ontario Gold Growth After AIM Move and Eagle Lake Acquisition, CEO Says.Watch here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBezant Resources PLC Regulatory News (BZT)

Share Price Information for Bezant Resources PLC (BZT)

Share Price is delayed by 15 minutes
Get Live Data
0.15    0.00 (0.00%)
Bid:
0.14
Ask:
0.16
Spread: 0.02 (14.286%)
Market Cap: £33.51m
BZT Live PriceLast checked at - London Stock Exchange

Intraday Bezant Resources PLC Share Chart

Resource Update

17 Dec 2010 07:00

RNS Number : 1257Y
Bezant Resources PLC
17 December 2010
 



17 December 2010

 

Bezant Resources Plc

("Bezant" or the "Company")

 

Maiden 189Mt JORC Ore Reserve and Mineable Inventory Statement for the Mankayan Copper/Gold Project, Philippines

 

Highlights:

 

·; Maiden Independent Ore Reserve and Mineable Inventory Statement produced by Mining Plus (Perth) in accordance with the JORC Code, based on the historic resource estimate independently provided by Snowden in July 2009

·; Probable Ore Reserves of 189 million tonnes at 0.46% Copper and 0.49g/t Gold

·; Total Recoverable Metal Reserves of 811,000 tonnes of Copper and 2,210,000 ounces of Gold

·; Mineable Inventory increased to 389 million tonnes at 0.38% Copper and 0.42g/t Gold

·; Total Mineable inventory of 1.4 million tonnes of Copper and 3.9 million ounces of Gold

 

Bezant (AIM: BZT), the AIM listed gold and copper exploration and development company operating in the Philippines, Argentina and Tanzania, announces a maiden JORC compliant Ore Reserve and Mineable Inventory Statement for its Mankayan copper/gold Project, located 260km north of Manila in the Philippines.

 

The Mankayan Project Ore Reserve and Mineable Inventory Statements were prepared for Bezant by Mining Plus Pty. Ltd ("Mining Plus") as at 14 December 2010. The Ore Reserve Statement has been prepared in accordance with the guidelines of the Australasian Code for Reporting Exploration Results, Mineral Resources and Ore Reserves (JORC Code - 2004 edition).

The Ore Reserve and Mineable Inventory Statements stem from the mine design and production schedule produced by Mining Plus for Bezant as part of its Mankayan Block Cave Conceptual (technical and economic) Study. The mine design encompassing the Indicated, Inferred and unclassified material, was used to calculate the mineable section of the deposit and forms the basis of the Mineable Inventory Statement. The Ore Reserves produced by Mining Plus are based on the Resource Estimation independently provided by Snowden Mining Industry Consultants Pty. Ltd ("Snowden") and announced by the Company in July 2009 of 221.6Mt at 0.49% Copper and 0.52g/t Gold. The Ore Reserve estimates are shown in Table 1 and the Resource estimates in Table 2 below.

 

Table 1: Mankayan Project Ore Reserves

JORC (2004) Reserve Category

 

Tonnes

Grade

Metal Units

(Mt)

Cu

(%)

Au

(g/t)

Cu tonnes

(t)

Au

(ounces)

Probable

189

0.46

0.49

811,000

2,210,000

Proven

N/A

 

 

Table 2: Mankayan Project Ore Resources

JORC (2004) Resource Category

 

Tonnes

Grade

Metal Units

(Mt)

Cu

(%)

Au

(g/t)

Cu tonnes (t)

Au

(ounces)

Indicated

221.6

0.49

0.52

1,100,000

3,700,000

Inferred

36.2

0.44

0.48

200,000

600,000

Total

257.8

1,300,000

4,300,000

 

The following key assumptions were applied in producing the statements:

·; Metal prices of US$3/lb Copper and US$900/oz Gold were used to develop the cut-off grade.

·; Operating and capital cost estimates used in the evaluation of the "Probable Ore Reserve" were determined during the course of the conceptual study.

·; The Block Cave footprint was designed to a cut-off grade of 0.22% CuEq.*

·; The production schedule had an ore/waste classifier grade of 0.22% CuEq applied. This was determined against a completed mine design incorporating the finalised operating and capital cost estimates.

·; Metallurgical recoveries of 94% and 74% for copper and gold respectively were assumed, based on the independent metallurgical testwork results achieved to date.

 

* - Copper Equivalent ("CuEq") was calculated based on the parameters defined under the key assumptions.

 

The complete mine design was evaluated for approximately 389Mt of ore at an average grade of 0.38% Cu and 0.42g/t gold. The mine design incorporated Indicated, Inferred and unclassified material and resulted in a Mineable Inventory Statement (see Table 3 below).

 

Table 3: Total Mineable Inventory Statement

Tonnes

Grade

Metal Units

(Mt)

Cu

(%)

Au

(g/t)

Cu tonnes (Mt)

Au

(M ounces)

389

0.38

0.42

1.4**

3.9**

 

** - assuming metallurgical recoveries of 94% and 74% for copper and gold respectively.

 

Gerry Nealon, Executive Chairman, commented: 

"We are delighted to receive this independent maiden Ore Reserve Statement (JORC Compliant) for our flagship Mankayan Project based upon the results of our exploration, drilling, geotechnical and metallurgical studies to date, the latter having formed the basis of the Block Cave Conceptual (technical and economic) Scoping Study commissioned from Mining Plus. 

 

"The addition of this Ore Reserve status to the forthcoming results of the conceptual study and our ongoing review process, will assist us immensely in identifying the most attractive route for taking the project forward and unlocking maximum shareholder value. We look forward to announcing the full results of the conceptual scoping study in the very early part of the New Year."

 

The mining specific information in this announcement that relates to Ore Reserves is based on information compiled by Mr Peter Lock, who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Lock is employed full time by Mining Plus which was commissioned by Bezant in late August 2010 to produce a conceptual scoping study on the Company's Mankayan Project. Mr Lock has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr Lock consents to the inclusion in this announcement of the matters based on the information compiled for his study in the form and context in which it appears.

 

Dr Bernard Olivier has reviewed and approved the technical information contained within this announcement in his capacity as a qualified person, as required under the AIM rules. Dr Olivier is Technical Director of the Company and a Member of the Australasian Institute of Mining and Metallurgy.

 

For further information, please contact:

 

Gerry Nealon

Executive Chairman, Bezant Resources Plc

Tel: +61 41 754 1873

 

Bernard Olivier

Technical Director, Bezant Resources Plc

Tel: +61 40 894 8182

 

Evan Kirby

Non-Executive Director, Bezant Resources Plc

Tel: +61 41 221 2827

 

James Harris / Matthew Chandler / David Altberg

Strand Hanson Limited

Tel: +44 (0)20 7409 3494

 

Alastair Stratton

Matrix Corporate Capital LLP

Tel: +44 (0)20 3206 7000

 

Laurence Read / Beth Harris

Threadneedle Communications (UK)

Email: Laurence.Read@threadneedlepr.co.uk

Tel: +44 (0)20 7653 9855

Mob: +44 (0)7979 955 923

 

or visit http://www.bezantresources.com

 

Notes to editors:

 

Bezant is currently focussed primarily on the copper and gold mineral sector and its core flagship project remains its Mankayan copper/gold project situated in the Mankayan-Lepanto mining district of the Philippines, an area of established copper and gold mining. The deposit is located approximately 260km north of Manila and 6km east of the copper/gold mine owned and operated by Lepanto Consolidated Mining Company. Since its discovery in the early 1970s, extensive drilling (more than 45,000 metres over 48 holes) and metallurgical work has been undertaken by Goldfields Asia Ltd, Pacific Falkon and others. Bezant currently has a JORC compliant mineral resource of 221.6 million tonnes Indicated and 36.2 million tonnes Inferred, grading at 0.49% for copper and 0.52g/t for gold, at a 0.4% copper cut-off. This equates to an Indicated Resource of 2.42 billion pounds (1.1 million tonnes) of copper and 3.7 million ounces of gold, with a further Inferred Resource of 0.44 billion pounds (0.2 million tonnes) of copper and 600,000 ounces of gold.

 

Mining Plus

Mining Plus is an innovative and practical consultancy company located in Perth, Melbourne and Kalgoorlie with affiliates overseas. It provides technical consulting services to Australian and International mining and exploration companies with experience of similar conceptual mining studies for a range of clients and commodities throughout the world (www.miningplus.com.au).

 

Glossary of technical terms:

 

"Indicated Resource"

 

That part of a Mineral Resource for which tonnage, densities, shape, physical characteristics, grade and mineral content can be estimated with a reasonable level of confidence. It is based on exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes. The locations are too widely or inappropriately spaced to confirm geological and/or grade continuity but are spaced closely enough for continuity to be assumed.

 

"Inferred Resource"

 

 

 

 

 

"Ore Reserve"

That part of a Mineral Resource for which tonnage, grade and mineral content can be estimated with a low level of confidence. It is inferred from geological evidence and assumed but not verified geological and/or grade continuity. It is based on information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes which may be limited or of uncertain quality and reliability.

 

The economically mineable part of Measured and/or Indicated resources, including diluting materials and allowances for losses which may occur when the material is mined.

 

"JORC"

The Joint Ore Reserves Committee: The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves, as published by the Joint Ore Reserves Committee of The Australasian Institute of Mining and Metallurgy, Australian Institute of Geoscientists and Minerals Council of Australia.

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCEQLFFBLFZFBL
Date   Source Headline
25th Aug 20114:35 pmRNSPrice Monitoring Extension
16th Aug 20114:40 pmRNSSecond Price Monitoring Extn
16th Aug 20114:35 pmRNSPrice Monitoring Extension
15th Aug 20117:00 amRNSUpdate re Eureka Project - Argentina
28th Jun 20114:36 pmRNSPrice Monitoring Extension
6th May 20114:41 pmRNSSecond Price Monitoring Extn
6th May 20114:37 pmRNSPrice Monitoring Extension
27th Apr 20114:40 pmRNSSecond Price Monitoring Extn
27th Apr 20114:35 pmRNSPrice Monitoring Extension
20th Apr 20114:41 pmRNSSecond Price Monitoring Extn
20th Apr 20114:35 pmRNSPrice Monitoring Extension
19th Apr 201111:00 amRNSIssue of Equity
30th Mar 20117:16 amRNSInterim Results
25th Feb 20117:00 amRNSPlacement
19th Jan 20117:00 amRNSPositive Scoping Study at Mankayan Project
12th Jan 20117:00 amRNSChange of Broker
17th Dec 20107:00 amRNSResource Update
10th Dec 201012:35 pmRNSResult of Annual General Meeting
7th Dec 20107:00 amRNSAcquisition
18th Nov 20105:26 pmRNSFinal Results
8th Oct 20104:40 pmRNSSecond Price Monitoring Extn
8th Oct 20104:35 pmRNSPrice Monitoring Extension
23rd Aug 20107:00 amRNSScoping Study Commissioned
18th May 20107:00 amRNSIssue of Equity
17th May 201011:30 amRNSResult of General Meeting
4th May 20107:00 amRNSNotice of General Meeting
25th Mar 20102:31 pmRNSHalf Yearly Report
20th Jan 20107:00 amRNSHolding in Company
24th Dec 200912:00 pmRNSPlacing
22nd Dec 200911:07 amRNSResult of AGM
26th Nov 20097:01 amRNSNotice of AGM 2009
26th Nov 20097:00 amRNSFinal Results for the Year Ended 30 June 2009
5th Nov 20094:40 pmRNSSecond Price Monitoring Extn
5th Nov 20094:35 pmRNSPrice Monitoring Extension
15th Oct 20091:50 pmRNSChange of Name of Nominated Adviser and Broker
27th Aug 20097:00 amRNSHolding in Company & Change of Registered Address
28th Jul 200911:32 amRNSResult of AGM
13th Jul 20097:00 amRNSResource Upgrade, Mankayan Project
3rd Jul 20097:00 amRNSNotice of AGM
30th Jun 20097:00 amRNSMetallurgical Testwork Results, Mankayan Project
23rd Jun 20098:00 amRNSMankayan Project
31st Mar 20097:45 amRNSInterim Results
21st Jan 20097:00 amRNSMankayan Project
9th Jan 20091:38 pmRNSHolding(s) in Company
5th Jan 20097:00 amRNSHolding in Company
23rd Dec 20087:00 amRNSAnnual Report and Accounts
19th Dec 20087:00 amRNSNotice of Substantial Share Holder
4th Dec 20087:00 amRNSChange of Directors and Change of Advisor
8th Oct 200811:50 amRNSResult of AGM
6th Oct 20087:00 amRNSDrilling Results for Mankayan Project

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.