Ben Richardson, CEO at SulNOx, confident they can cost-effectively decarbonise commercial shipping. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBezant Res Regulatory News (BZT)

Share Price Information for Bezant Res (BZT)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.021
Bid: 0.018
Ask: 0.024
Change: 0.00 (0.00%)
Spread: 0.006 (33.333%)
Open: 0.021
High: 0.021
Low: 0.021
Prev. Close: 0.021
BZT Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Minemba Prospect Kalengwa Copper Project, Zambia

22 Apr 2021 16:33

RNS Number : 3594W
Bezant Resources PLC
22 April 2021
 

22 April 2021

Bezant Resources Plc

("Bezant" or the "Company")

Minemba Prospect Kalengwa Copper Project, Zambia

 

 

Bezant (AIM: BZT), the copper-gold exploration and development company, is pleased to announce a further significant copper intercept in its second drill hole at the Minemba prospect within the Kalengwa exploration project area in Zambia (the "Kalengwa Exploration Project") in which the Company has a 30% interest and acts as operator.

 

Highlights

· Copper mineralisation has been intersected over 114m downhole width within altered and brecciated gabbro intrusive rocks in the second hole at Minemba

· Preliminary hand-held XRF measurements (to be confirmed with geochemical assays taken from half-core samples) returned copper grades over the following down-hole intervals*:

o 6m @ 1.67% Cu from 99-105m 

§ including 2m @ 2.90% Cu from 103-105m

o and 17m @ 0.94% Cu from 119-136m

§ including 3m @ 3.49% Cu from 125-128m

o and 20m @ 0.84% Cu from 144-164m

§ including 5m @ 1.62% Cu from 144-149m

o and 20m @ 1.05% Cu from 193-213m

§ including 12m @ 1.21% Cu from 193-205m

*Down-hole widths quoted - true widths not currently known

· The provisional results support the width and tenor of the intersections encountered in the first hole MB-01, located about 100m distant.

· Mineralisation in MB-02 occurs as disseminations and replacements of chalcopyrite within the gabbro intrusive

· Combined with records from historic drilling, mineralisation at Minemba has now been traced laterally for at least 350m

· The Company is planning for a detailed geophysical survey at Minemba to help direct further drilling by mapping the extent of the magnetic gabbro and assisting in delineating areas of conductive copper-pyrite mineralisation

· Further drilling is being planned which will be guided by geology and geophysics

· The provisional results are subject to lab assays which are anticipated to be available in the second half of May 2021

 

 

Colin Bird, Executive Chairman of Bezant, commented:

"We are very pleased with the 114m interval of continuous mineralisation. The archives did not suggest this to be the case and we are particularly encouraged by the geological sequence which is the same as in the nearby rich copper pit at Kalengwa which produced 1.9Mt @ 9.44% Cu.

We have identified 350m of mineralised strike to date and, in order to build up a significant copper tonnage, we intend to carry out a ground IP geophysics survey as well as drilling at least two further holes in the vicinity of the two already completed holes. We are pleased with the results to date as we have not yet tested several other targets on the large Kalengwa property, including a 13km zone of enhanced soil geochemistry along an interpreted structure. We plan to carry out initial geophysical surveying on this target while the geophysics crew is on site."

 

Bezant Drilling

The aim of Bezant's drill programme was to test the down-plunge and along-strike extent of the earlier drill intercepts at Minemba within the gabbro intrusive (potential mineral feeder zone) while also looking to test the boundaries of this unit with the Kalengwa Mine sedimentary package (potential host unit). Two holes were planned in this initial reconnaissance programme.

 

Hole MB-02 was drilled at -50o towards the northwest, stepping out about 100m northeast from historic hole MN 496 and a similar distance north-northeast from the first Bezant hole, MB-01. The hole was completed at a depth of 237.2m, with a summary log as follows:

0 - 31m Overburden and saprolite

31 - 99m Partly weathered massive and brecciated gabbro

99 - 219m Gabbro intrusive rock, brecciated in parts, with carbonate veining; iron occurs as magnetite & hematite; chalcopyrite appears throughout the interval as irregular disseminations and blebs, associated with pyrite

219 - 237.2m Shale/Siltstone conglomerate unit with disseminated pyrite

End of hole

 

This second hole at Minemba supports the occurrence in MB-01 of more widespread disseminated copper mineralisation than reported in the historic holes and mineralisation is now recorded in historic and current drilling over at least 350m in a NE-SW direction, as well as more than 100m in a vertical dimension.

Core from this hole is being fully logged and will be split for laboratory assay.

The Company is now planning a geophysical survey to define the shape and extent of the deposit to help guide further drilling.

 

Minemba Target

The Minemba target was first identified by Roan Consolidated Mines ('RCM'), the operator of the Kalengwa open pit copper-silver mine in the 1960s, based on a copper geochemical anomaly found by auger drilling 4km to the northeast of Kalengwa, associated with a discrete magnetic anomaly believe to be related to gabbro intrusive rocks. Five diamond drill holes spaced 100-200m apart and angled towards the north were completed at that time. Four of these reported steeply-dipping chalcopyrite-pyrite mineralisation over narrow intervals at depths ranging from 80-200m below surface within the gabbro. Drill intercepts included 4.3m @ 1.43% Cu (hole MN 496) and 2.7m @ 2.08% Cu (MN 495). Despite the proximity to the high grade Kalengwa mine, no further diamond drilling was subsequently carried out.

Bezant reviewed the extensive dataset from previous exploration over the Kalengwa exploration licence and concluded that Minemba was located on a structural mirror image of the Kalengwa deposit setting, aligned directly with the offset continuation of the NE-trending Kalengwa Lineament and therefore the target was prioritised for further drill testing.

 

 

 

Technical Sign-Off

Technical information in this announcement has been reviewed by Edward (Ed) Slowey, BSc, PGeo, technical director of Bezant. Mr Slowey is a graduate geologist with more than 40 years' relevant experience in mineral exploration and mining, a founder member of the Institute of Geologists of Ireland and is a Qualified Person under the AIM rules. Mr Slowey has reviewed and approved this announcement.

 

 

For further information, please contact:

 

Bezant Resources PlcColin Bird

Executive Chairman

 

+27 726 118 724

 

Beaumont Cornish (Nominated Adviser) Roland Cornish

 

+44 (0) 020 7628 3396

Novum Securities Limited (Broker)

Jon Belliss

 

+44 (0) 20 7399 9400

 

or visit http://www.bezantresources.com 

 

 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 as it forms part of UK Domestic Law by virtue of the European Union (Withdrawal) Act 2018 ("UK MAR").

 

Glossary

"brecciated"

Rock fragmented into angular components

"chalcopyrite"

A copper-iron sulphide mineral, CuFeS2, often found in copper ores

"conglomerate"

Sedimentary rock formed by the cementing together of water-rounded pebbles

"Cu"

Chemical symbol for copper

"gabbro"

A coarse grained mafic intrusive rock composed of pyroxene and plagioclase, similar in composition to dolerite

"hematite"

A mineral composed of ferric iron oxide.

"magnetite"

A magnetic iron oxide, Fe3O4

"pyrite"

Iron sulphide mineral, FeS2

"silicified"

Descriptive of a rock in which original minerals have been replaced by silica.

"XRF Spectrometer"

Instrument to determine the chemistry of a sample by measuring the fluorescent (or secondary) X-ray emitted from a sample when it is excited by a primary X-ray source

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLPPUUWCUPGGAP
Date   Source Headline
6th May 20114:41 pmRNSSecond Price Monitoring Extn
6th May 20114:37 pmRNSPrice Monitoring Extension
27th Apr 20114:40 pmRNSSecond Price Monitoring Extn
27th Apr 20114:35 pmRNSPrice Monitoring Extension
20th Apr 20114:41 pmRNSSecond Price Monitoring Extn
20th Apr 20114:35 pmRNSPrice Monitoring Extension
19th Apr 201111:00 amRNSIssue of Equity
30th Mar 20117:16 amRNSInterim Results
25th Feb 20117:00 amRNSPlacement
19th Jan 20117:00 amRNSPositive Scoping Study at Mankayan Project
12th Jan 20117:00 amRNSChange of Broker
17th Dec 20107:00 amRNSResource Update
10th Dec 201012:35 pmRNSResult of Annual General Meeting
7th Dec 20107:00 amRNSAcquisition
18th Nov 20105:26 pmRNSFinal Results
8th Oct 20104:40 pmRNSSecond Price Monitoring Extn
8th Oct 20104:35 pmRNSPrice Monitoring Extension
23rd Aug 20107:00 amRNSScoping Study Commissioned
18th May 20107:00 amRNSIssue of Equity
17th May 201011:30 amRNSResult of General Meeting
4th May 20107:00 amRNSNotice of General Meeting
25th Mar 20102:31 pmRNSHalf Yearly Report
20th Jan 20107:00 amRNSHolding in Company
24th Dec 200912:00 pmRNSPlacing
22nd Dec 200911:07 amRNSResult of AGM
26th Nov 20097:01 amRNSNotice of AGM 2009
26th Nov 20097:00 amRNSFinal Results for the Year Ended 30 June 2009
5th Nov 20094:40 pmRNSSecond Price Monitoring Extn
5th Nov 20094:35 pmRNSPrice Monitoring Extension
15th Oct 20091:50 pmRNSChange of Name of Nominated Adviser and Broker
27th Aug 20097:00 amRNSHolding in Company & Change of Registered Address
28th Jul 200911:32 amRNSResult of AGM
13th Jul 20097:00 amRNSResource Upgrade, Mankayan Project
3rd Jul 20097:00 amRNSNotice of AGM
30th Jun 20097:00 amRNSMetallurgical Testwork Results, Mankayan Project
23rd Jun 20098:00 amRNSMankayan Project
31st Mar 20097:45 amRNSInterim Results
21st Jan 20097:00 amRNSMankayan Project
9th Jan 20091:38 pmRNSHolding(s) in Company
5th Jan 20097:00 amRNSHolding in Company
23rd Dec 20087:00 amRNSAnnual Report and Accounts
19th Dec 20087:00 amRNSNotice of Substantial Share Holder
4th Dec 20087:00 amRNSChange of Directors and Change of Advisor
8th Oct 200811:50 amRNSResult of AGM
6th Oct 20087:00 amRNSDrilling Results for Mankayan Project
17th Sep 200811:19 amRNSNotice of AGM
21st Jul 20087:00 amRNSResource Update
15th Jul 20087:00 amRNSDrilling Report for Mankayan
11th Jun 20087:00 amRNSMankayan Project
6th May 20087:02 amRNSMemorandum of Understanding

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.