Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. View here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBezant Resources PLC Regulatory News (BZT)

Share Price Information for Bezant Resources PLC (BZT)

Share Price is delayed by 15 minutes
Get Live Data
0.15    0.0095 (6.76%)
Bid:
0.14
Ask:
0.16
Spread: 0.02 (14.286%)
Market Cap: £33.51m
BZT Live PriceLast checked at - London Stock Exchange

Intraday Bezant Resources PLC Share Chart

Drilling Report for Mankayan

15 Jul 2008 07:00

RNS Number : 0598Z
Bezant Resources PLC
15 July 2008
 



Bezant Resources Plc ("Bezant" or the "Company")

ASSAY RESULTS FOR DRILL HOLE BRC-53 MANKAYAN PROJECT, PHILIPPINES

Highlights:

 
- Extension of the known south-easterly boundary of the deposit.
- A total of 549m of copper and gold porphyry intersected in drill hole BRC-53.
- 105m of high-grade intersections with an average of 0.76% Cu-equivalent values (CuEQ*).

 

Bezant (AIM: BZT), the AIM listed gold and copper exploration and development company operating in the Philippines and Tanzania, today announces assay results for the fourth completed diamond drill hole (BRC-53) at its Mankayan Project, located 260km north of Manila in the Philippines. This is the fourth hole completed in the current ten hole (approximate 11,000m) drilling programme, presently being conducted at the Mankayan deposit.

Drill hole BRC-53 was drilled to a depth of 1,077m and assay results have been returned for a total of 549m of mineralised core, for the interval 528m to 1,077m, with the average assay results for the entire 549m of intersections being as follows:

CuEQ (%)

Cu (%)

Au (g/t)

Ag (g/t)

0.41

0.29

0.23

0.64

The hole, BRC-53, was drilled approximately 230m south-east of hole BRC-51 and 112m south-east of the historic drill hole THM-20. The latter drill hole (THM-20) has historically been the most south-easterly located hole and the results from hole BRC-53 have, therefore, significantly extended the known south-easterly boundary of the deposit.

The highlighted intersections shown in Table 1 (below), comprise the 105m of composite intersections, with weighted average grades of 0.52% Cu, 0.43g/t Au, 0.90g/t Ag and a weighted average CuEQ* grade of 0.76%.

The current drilling programme at Mankayan continues to be aggressively pursued with drill holes BRC-54 and BRC-55 (the fifth and sixth holes in the programme), currently at depths of 883m and 550m respectively. Each of these holes is still in highly mineralised zones.

Gerry Nealon, Executive Chairman, today commented:

"This fourth completed hole in the current 11,000 metre Mankayan drilling programme has expanded the mineralization boundary of the deposit with a positive copper-gold intersection to the south-east. Following the completion of drilling and subsequent data analysis, I look forward to communicating our first clear interpretation of the ore body. 

To view the full Table 1: Highlighted Intersections within BRC-53, paste the following link into your web browser:

http://www.rns-pdf.londonstockexchange.com/rns/0598Z_-2008-7-15.pdf

 

*Copper equivalent values are estimated using long-term metal prices including: Cu at USD$1.2 per pound and Au at USD$450 per ounce. CuEQ equals Cu per cent. plus Au grams per tonne times 14.47 / (1.20 (x) 22.05). Metallurgical recoveries are not considered and adjustment factors to account for differences in relative metallurgical recoveries for gold and copper will depend upon the completion of definitive metallurgical testing. It should also be noted that silver values were not included in the CuEQ calculations.

Dr. Bernard Olivier has reviewed and approved the technical information contained within this press release in his capacity as a competent person, as required under the AIM rules. Dr. Olivier is a Member of the Australasian Institute of Mining and Metallurgy. 

For further information, please contact:

Gerry Nealon

Executive Chairman, Bezant Resources Plc

Tel: +61 417541873

Bernard Olivier

Executive Director, Bezant Resources Plc

Tel: +61 40 894 8182

James Harris / Matthew Chandler

Strand Partners Limited

Tel: +44 (0) 20 7409 3494

Laurence Read/Beth Harris

Threadneedle Communications (UK)

Email: Laurence.Read@threadneedlepr.co.uk

Tel: +44 (0)20 7936 9696

Mob: +44 (0)7979 955 923

or visit http://www.bezantresources.com

Notes for editors:

The Mineral and Production Sharing Agreement covers a total of 534 hectares in the Guinaoang area of the Philippines (the "Mankayan Project"). This is located in the Mankayan-Lepanto mining district, an area of porphyry copper belts in the Philippines and is similar to several deposits that have already been developed, such as the St Thomas deposit near Baguio City. The site is adjacent to the copper/gold mine owned and run by Lepanto Consolidated Mining Company, with the Mankayan-Lepanto area having been mined for centuries and being readily accessible by both road and air. The Mankayan deposit was discovered in the early 1970s and since then has been extensively drilled, with four historical programmes being completed covering more than 45,000 metres of diamond drilling over 48 holes. The historic resource estimate is in the order of 166.5 million tonnes, at approximately 0.52% copper and 0.54 g/t of gold. 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLGXGDRCGBGGIU
Date   Source Headline
19th Jun 20264:02 pmRNSExercise of Warrants, Total Voting Rights
18th Jun 20263:20 pmRNSExercise of Warrants, Total Voting Rights
11th Jun 20268:00 amRNSExercise of Warrants, Total Voting Rights
11th Jun 20267:00 amRNSHope & Gorob Project Financing & Offtake Agreement
1st May 202612:14 pmRNSTotal Voting Rights
8th Apr 20267:00 amRNSHope & Gorob Project-New Mineral Resource Estimate
31st Mar 20267:00 amRNSFundraising, Directors' Dealing and TVR
30th Mar 20269:31 amRNSHope & Gorob Copper-Gold - Mine Development Update
30th Mar 20267:00 amRNSExercise of Warrants, Total Voting Rights
24th Mar 20261:24 pmRNSAdditional 20% interest in Hope and Gorob
11th Mar 202611:00 amRNSAppointment of mining and logistics contractor
11th Mar 202611:00 amRNSAppointment of mining and logistics contractor
10th Mar 20267:00 amRNSNLZM Mining Licence Renewed, Warrants Exercise TVR
10th Mar 20267:00 amRNSNLZM Mining Licence Renewed, Warrants Exercise TVR
3rd Mar 20262:11 pmRNSGrant of Options and Director/PDMR Shareholding
23rd Jan 202610:47 amRNSExercise of Warrants and TVR
14th Jan 202610:34 amRNSExercise of Warrants, Total Voting Rights
8th Jan 202610:53 amRNSExercise of Warrants, Total Voting Rights
29th Dec 20255:00 pmRNSDirector/PDMR Shareholding
29th Dec 20255:00 pmRNSDirector/PDMR Shareholding
24th Dec 20259:23 amRNSDirector/PDMR Shareholding
24th Dec 20259:23 amRNSDirector/PDMR Shareholding
17th Dec 20257:00 amRNSCompletion of NLZM Processing Plant Acquisition
8th Dec 20253:08 pmRNSResult of General Meeting
8th Dec 202510:23 amRNSExercise of Warrants, Total Voting Rights
4th Dec 20257:00 amRNSExercise of Warrants, Total Voting Rights
2nd Dec 202511:08 amRNS-RGeneral Meeting Presentation
19th Nov 20257:00 amRNSCircular re Proposed Acquisition and Notice of GM
12th Nov 202512:36 pmRNSHolding(s) in Company
6th Nov 20252:04 pmRNSExercise of Warrants and TVR
3rd Nov 20257:00 amRNSExercise of Warrants and Total Voting Rights
31st Oct 202512:37 pmRNSTotal Voting Rights
31st Oct 202511:37 amRNSPrepayment Facility and concentrate offtake agreed
30th Oct 20257:00 amRNSHope and Gorob Project Study Report
29th Oct 20252:39 pmRNSHope and Gorob Project Update
24th Oct 20257:00 amRNSExercise of Warrants, Total Voting Rights
16th Oct 20259:44 amRNSExercise of Warrants, Total Voting Rights
10th Oct 20259:01 amRNSBlackstone Investment - Mankayan Project Update
10th Oct 20257:00 amRNSExercise of Warrants, Total Voting Rights
2nd Oct 20259:21 amRNSHolding(s) in Company
2nd Oct 20257:00 amRNSUpdate on Blackstone Minerals Investment
30th Sep 20257:00 amRNSInterim Results for Six Months Ended 30 June 2025
17th Sep 202510:14 amRNSBlackstone Minerals - Mankayan Project Update
11th Sep 20251:03 pmRNSExercise of Warrants, Total Voting Rights
14th Aug 20257:00 amRNSProposed Acquisition of Processing Plant
29th Jul 20257:07 amRNSBlackstone Investment - Mankayan Project Update
25th Jul 202511:57 amRNSResult of AGM
14th Jul 202512:23 pmRNSBlackstone Investment - Mankayan Project Update
11th Jul 20252:46 pmRNSExercise of Warrants, Total Voting Rights
9th Jul 20252:50 pmRNSExercise of Warrants, Total Voting Rights

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.