PYX Resources: Achieving volume and diversification milestones. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBlencowe Resou. Regulatory News (BRES)

Share Price Information for Blencowe Resou. (BRES)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 5.75
Bid: 5.50
Ask: 6.00
Change: 0.00 (0.00%)
Spread: 0.50 (9.091%)
Open: 5.75
High: 5.75
Low: 5.75
Prev. Close: 5.75
BRES Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Results of Metallurgical Test Work

13 Jul 2021 07:34

RNS Number : 0494F
Blencowe Resources PLC
13 July 2021
 

Date: 13 July 2021 Blencowe Resources Plc

 

Results of Metallurgical Test Work by SGS Lakefield

98% TGC Underlines Exceptional Qualities of End Products

 

Highlights:

· Concentrate grades consistently ranged at the top end of the spectrum, between 97-98% TGC (versus an internal target of 94% TGC)

· Low impurities

· Approximately 40% of the end product presents as jumbo/XL/large flakes and 60% as medium/smaller flakes

· the process requires no primary crushing or grinding of the ore which offers a material advantage over hard-rock graphite deposits, both in terms of lower capital expenditure and lower operating costs

· offtake discussions can be advanced rapidly with latest test work

 

 

 

Blencowe Resources Plc, is pleased to announce that metallurgical test work on its Orom-Cross graphite project in Northern Uganda has been successfully completed by SGS Lakefield, generally regarded as one of the leading technical consultants in the world on matters concerning graphite concentrates. This work is critical to understanding the quality of the end-product(s) that Orom-Cross can deliver to market as a high grade graphite concentrate, as well as what the process flow will look like to achieve this.

Scope of Metallurgical Testwork

The critical issues to determine quality of end product are (1) high TCG concentrate, with anything over 94% considered good and anything above 97% considered excellent, (2) low impurities, and (3) flakes sizes. As example +32 mesh Super Jumbo (97% TGC) will sell for over US$2,500/tonne in comparison to -100 mesh Small flakes (97% TGC) selling for circa US$700/t.

Blencowe appointed SGS Lakefield in Canada to undertake metallurgical testwork on material gathered from its 69 hole, 1950 metre 2020 diamond drilling programme, which covered both the Northern Syncline and Camp Lode areas.

The metallurgical test program was designed to deliver the following Key Objectives:

· To confirm if a 95-97% TGC (Total Graphite Content) pure concentrate is possible. Entry level concentrate is generally accepted as 94% TGC and each 1% above that attracts a significant premium on price in the market.

· To confirm what impurities (specifically Thorium and Vanadium) may exist within the concentrate, and at what levels.

· To confirm ~80% recovery is achievable for this concentrate.

· To confirm the liberation process in order to maintain as high a percentage of Jumbo/XL/Large flakes within the concentrate as these attract the highest prices in the market.

· To confirm the process flow diagram for plant design as part of the forthcoming Feasibility Study.

· To deliver bulk concentrate to allow Blencowe to initiate discussions with potential off-take partners.

Results of Metallurgical Testwork

Blencowe is pleased to announce that all 5 Key Objectives have been met and/or exceeded in this round of testwork, specifically:

· Concentrate grades consistently ranged at the top end of the spectrum, between 97-98% TGC.

· Low, or in most cases, no impurities were found within the concentrate.

· Open cycle and locked cycle floatation test produced excellent recoveries between 80-90%.

· Approximately 40% of the end product presents as jumbo/XL/large flakes and 60% as medium/smaller flakes.

· A simple, neat process flow indicates a standard processing facility that can easily be designed and later expanded to meet strong anticipated growth ahead in the demand for graphite.

Overall the metallurgical test-work undertaken to date shows a robust flowsheet capable of repeatable metallurgy for a wide range of feed samples from Orom-Cross. This consistency is very important in delivering an end product of the highest quality.

Offtake Discussions

Blencowe is now better positioned to advance discussions with strategic groups in the knowledge it can deliver a range of high grade end products, and it can now deliver samples as required to provide evidence for further due diligence or local testing. Blencowe anticipates using already identified specialist consultants, with considerable experience in graphite sales and marketing, to provide advice and support as to where to sell its products moving forward.

 

Processing and Plant Design

A total of eight rougher and cleaner flotation tests were carried out on the Master Composite (being a combination of Northern Syncline and Camp Lode samples) that culminated in a flowsheet which is atypical of similar graphite projects. The flowsheet consists of a flash and rougher flotation stage followed by a primary cleaning circuit with a polishing mill followed by three stages of cleaner flotation. The intermediate concentrate is classified and then further upgraded in secondary cleaning circuits with stirred media mills (SMM) followed by cleaner flotation.

The proposed flowsheet was employed in a locked cycle test (LCT) to determine the metallurgical response under closed circuit conditions.

The final Master Composite concentrate graded 97.3% TGC, with a 90.1% TC (total carbon) recovery, which exceeded the company's expectations and places the project at the higher end of its peers.

The size fraction analysis results of the combined concentrate of the LCT are presented in Table 1.

At the end of the metallurgical program the suitability of the flowsheet and conditions of the proposed flowsheet were evaluated on four separate composites, which represented the high grade and low grade samples in each of the Northern Syncline and Camp Lode zones. The purpose was to understand the consistency of all graphite within Orom-Cross and also to evaluate the priority areas to mine in the event of a wide range of results.

The results show a remarkably consistent end product over both zones and also within the higher and lower in situ grades. Consistency is very valuable in these circumstances, both for mine planning as well as processing.

Combined concentrate grades ranged between 94.7% TGC for the Camp Lode high-grade composite to 98.1% TGC for the Camp Lode and North Syncline low-grade composites. The open circuit recoveries of the North Syncline and Camp Lode high-grade composites were 80.9% and 88.4% TC respectively. Despite the lower head grades of the North Syncline and Camp Lode low-grade composites, the open stage recoveries for the two samples remained high at 80.9% and 80.4% TC respectively.

 

Table 1: Size Fraction Analysis of Combined Concentrate of LCT

Particle Size

 

Assays

Distribution

Flake Category

Tyler mesh

 

(µm)

% C(t) (TGC)

% C(t)

 

+32

 

+500

98.1

1.5

Super Jumbo

-32 + 48

 

-500 + 297

98.0

12.3

Jumbo

-48 + 80

 

-297 + 177

97.7

22.6

Large

-80 + 100

 

-177 + 149

97.5

9.6

Medium

-100 + 200

 

-149 + 74

97.0

27.0

Small

-200

 

-74

96.6

13.0

Amorphous

-325

 

95.7

13.9

 

The above table highlights that Blencowe will be able to produce a range of high quality end products from Orom-Cross.

· 36.4% as Super Jumbo/Jumbo/Large flakes with an average 98% TGC.

· 63.6% as Medium/Small/Fines with an average 97% TGC.

 

The design of the processing plant is based on the SGS test-work and best practice in similar operations. Importantly, the process requires no primary crushing or grinding of the ore which offers a material advantage over hard-rock graphite deposits, both in terms of lower capital expenditure and lower operating costs. The basic flowsheet is shown below in Figure 1:

http://www.rns-pdf.londonstockexchange.com/rns/0494F_1-2021-7-13.pdf

 

 

Figure 1: Proposed Orom Flowsheet

 

 

Blencowe will mandate an experienced engineering firm to begin formal plant design and this work is expected to be included as part of the Pre-Feasibility Study.

 

 

Cameron Pearce, Executive Chairman's Statement:

"We are absolutely delighted to share these exceptional metallurgical test results for Orom-Cross. They highlight the fact that we have a very high quality of end products that we will produce, which should not only be in higher demand but should also deliver higher prices. In all facets these results have exceeded our expectations and they underline the world class potential of Orom-Cross.

Our ongoing drilling programs recently delivered our first 16Mt JORC Resource which we are in the process of upgrading via 2,000m further infill drilling, and we know that we have literally billions of tonnes of graphite at Orom-Cross which we can continue to develop as and when required. Now our metallurgical test results have added considerable weight to this by showing what an impressive range of end products we can deliver. The next step is to engage in more detail with strategic groups that have been waiting for the test work result and to begin reviewing the project economics of the mine.

Orom-Cross continues to emerge as a world class graphite project in a safe location. As we begin to outline the economics of Orom-Cross the full potential of what can be achieved will become abundantly clear."

 

For further information please contact:

 

Blencowe Resources Plc

Sam Quinn

 

 

Investor Relations

Sasha Sethi

 

 

www.blencoweresourcesplc.com

Tel: +44 (0)1624 681 250

info@lionsheadconsultants.com

 

Tel: +44 (0)7891 677 441

sasha@flowscomm.com

 

Brandon Hill Capital Limited

Jonathan Evans

 

Tel: +44 (0)20 3463 5000

jonathan.evans@brandonhillcapital.com

 

 First Equity Limited Tel: +44(0)20 7330 1883

 Jason Robertson jasonrobertson@firstequitylimited.com

 

Twitter https://twitter.com/BlencoweRes

LinkedIn https://www.linkedin.com/company/72382491/admin/

 

Background

Orom-Cross is a potential world class graphite project both by size and end-product quality, with a high component of more valuable larger flakes within the deposit. A 21-year Mining Licence for the project was issued by the Ugandan Government in 2019 following extensive historical work on the deposit and Blencowe is moving into the studies phase shortly as it drives towards first production.

Orom-Cross presents as a large, shallow open pitable deposit, with an estimated overall resource between 2-3 billion tonnes of graphite. Development of the resource is expected to benefit from a low strip ratio and free dig operations thereby ensuring lower operating and capital costs.

 

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCSFFSMDEFSEDW
Date   Source Headline
2nd Jun 20219:54 amRNSHalf-year Report
1st Jun 20217:00 amRNSTR-1: Standard form notification of major holdings
24th May 20217:00 amRNSMetallurgical Test Work
19th May 202111:34 amRNSUpdated Corporate Presentation
14th May 202112:00 pmRNSTransaction in Shares
4th May 20217:00 amRNSStage Two Drilling Program Commences
29th Apr 20212:12 pmRNSDirector/PDMR Shareholding
26th Apr 20211:26 pmRNSHolding(s) in Company
13th Apr 20217:30 amRNSInvestor Webinar
13th Apr 20217:00 amRNSMaiden JORC Mineral Resource
7th Apr 20212:30 pmRNSWarrant Exercise
31st Mar 202110:08 amRNSResult of AGM
24th Mar 202111:30 amRNSWarrant Exercise
8th Mar 20214:30 pmRNSNotice of AGM
1st Mar 20217:00 amRNSDrilling Results
12th Feb 20217:00 amRNSTR-1: Standard form notification of major holdings
8th Feb 20212:12 pmRNSWarrant Exercise
8th Feb 20217:07 amRNSDrilling Results at Camp Lode
26th Jan 20217:00 amRNSAnnual Financial Report
22nd Jan 20211:07 pmRNSInvestor Conference Call
18th Jan 20217:00 amRNSPlacing to Raise £500,000
16th Dec 20207:00 amRNSPlacing to Raise £300,000
9th Dec 20209:52 amRNSTR-1: Standard form notification of major holdings
1st Dec 202011:01 amRNSBlock Listing Application Update
27th Nov 202012:11 pmRNSBlock Listing Application Update
26th Nov 20207:16 amRNSJORC Resource Update
25th Nov 20201:59 pmRNSBlock Listing Application & Issue of Equity
23rd Nov 20207:00 amRNSDirector Warrant Exercise and Purchase of Shares
5th Nov 20207:00 amRNSPublication of New Research Note
14th Oct 20202:07 pmRNSHolding(s) in Company
14th Oct 20207:21 amRNSHolding(s) in Company
14th Oct 20207:20 amRNSHolding(s) in Company
13th Oct 202010:21 amRNSHolding(s) in Company
9th Oct 20204:03 pmRNSTR-1: Standard form notification of major holdings
7th Oct 20209:47 amRNSTR-1: Standard form notification of major holdings
6th Oct 202012:59 pmRNSIssue of Equity
21st Sep 20207:00 amRNSSamples Sent for Assay to Deliver Maiden Resource
18th Aug 20207:00 amRNSTR-1: Standard form notification of major holdings
17th Aug 202010:22 amRNSUpdated presentation on the company website
10th Aug 20207:00 amRNSFirst Stage Value-Add Completed at Orom-Cross
4th Aug 20207:00 amRNSAppointment of SGS Lakefield
20th Jul 20207:00 amRNSJORC Resource Drilling Program Completed
16th Jul 20203:57 pmRNSTR-1: Standard form notification of major holdings
2nd Jul 20207:00 amRNSPhase 1 Drilling Program Update
16th Jun 20207:00 amRNSUpdate on the High-Grade Graphite Zone
2nd Jun 20207:00 amRNSHalf-year Report
27th May 20207:00 amRNSNew High-Grade Graphite Zone Identified
11th May 20207:00 amRNSRecommencement of metallurgical test work
5th May 20201:32 pmRNSTR-1: Notification of major holdings
5th May 20207:00 amRNSNew Research Initiation

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.