Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBlencowe Resou. Regulatory News (BRES)

Share Price Information for Blencowe Resou. (BRES)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 4.75
Bid: 4.50
Ask: 5.00
Change: 0.00 (0.00%)
Spread: 0.50 (11.111%)
Open: 4.75
High: 4.75
Low: 4.75
Prev. Close: 4.75
BRES Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Phase 1 Drilling Program Update

2 Jul 2020 07:00

RNS Number : 7755R
Blencowe Resources PLC
02 July 2020
 

Date: 2 July 2020 Blencowe Resources Plc

("Blencowe" or the "Company")

 

 

Blencowe Nears Completion of Phase 1 Drilling Program at Orom-Cross Graphite Project

 

The Company is pleased to provide a further update to the comprehensive JORC Resource diamond drilling program that has commenced on its Orom-Cross Graphite Project in Northern Uganda ("Project").

Highlights

· 59 hole drill program targeting western anomaly

· 57 holes completed, first batch of 20 holes to be assayed from next week

· Second drill rig has now been mobilised at the newly identified high grade zone

· Maiden JORC (2012) Indicated Resource anticipated early Q4 2020

 

Drilling Program Update

The Company has made good progress following the resumption of drilling at the Project after the nationwide lockdown during Q2 2020 as a result of the Covid-19 pandemic. Drilling has focused on the western anomaly, which includes a newly identified 'high-grade' zone, with 57 holes now completed and 2 remaining.

Of the 57 holes, 50 holes have already been logged and sampled, with the first batch of 20 holes due to leave site this week for assaying in the nearest JORC accredited independent laboratory in Mwanza (Tanzania). The second batch will be dispatched next week.

As part of the decision to further test the identified high-grade zone close to the camp site, a second drill rig has been mobilised to site and drill-out of this lode will commence this weekend. These extra holes are expected to fall within the Company's existing 2020 drilling budget given the efficiency of operations to date.

The Company expects the full drill program to be completed by late July, with all remaining samples dispatched to the Mwanza lab at a similar time. Drill-hole sites will then be rehabilitated as part of the outlined work program.

To date all drilling has gone according to plan with visible graphite showing in all areas, including larger flakes as targeted by the Company. The next phase of the program will focus on assaying and samples from this drilling campaign will be sent to technical experts to recommence metallurgical test work in Q4 2020.

The current drill program has been designed to delineate approximately 8 to 10 million tonnes to a JORC (2012) Indicated standard, which would provide the initial resource for 10 years of mining. The area targeted represents less than 1% of the Project.

 

Cameron Pearce Executive Chairman commented:

"We are pleased with the quality and speed of execution for the current drilling program at Orom-Cross, as well as all preliminary indications. We are grateful to our in-country partners for their considerable efforts to effectively manage this campaign in challenging circumstances and we look forward to delivering a maiden JORC Resource for Orom-Cross early in Q4 2020."

 "Blencowe acquired this Project as we believe graphite demand is set to increase materially over the next decade and beyond due to a combination of rapidly increasing demand for lithium-ion batteries coupled with a supply chain that remains relatively stagnant, particularly for larger flake and higher value projects such as those expected from Orom-Cross. We believe that Orom-Cross production will coincide neatly with this anticipated shortfall of graphite in world markets."

 

 

 

For further information please contact:

 

 

Blencowe Resources Plc

Sam Quinn (London Director)

 

 

 

www.blencoweresourcesplc.com

Tel: +44 (0)1624 681 250

info@blencoweresourcesplc.com

Brandon Hill Capital Limited

Jonathan Evans (Corporate Finance)

 

Tel: +44 (0)20 3463 5000

jonathan.evans@brandonhillcapital.com

 

Background

Orom-Cross is a potential world class graphite project both by size and end-product quality, with a high component of larger flakes identified from previous work performed. A 21-year Mining Licence was issued by the Ugandan Government in 2019 following extensive historical work on the deposit.

Orom-Cross presents as a large, shallow open pitable deposit, with an estimated resource in excess of 3 billion tonnes of graphite. Development of the resource is expected to benefit from a low strip ratio and free dig operations, thereby ensuring lower operating and capital costs.

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLEAKXFEDSEEFA
Date   Source Headline
15th Apr 20247:00 amRNSBulk Sample Update
10th Apr 20247:00 amRNSReceipt of Third Tranche from DFC
26th Feb 20248:52 amRNSResult of AGM
9th Feb 20247:00 amRNSSubscription & Conditional Subscription - Replace
6th Feb 20247:00 amRNSSubscription & Conditional Subscription
31st Jan 20247:00 amRNSAnnual Financial Report
29th Jan 20247:00 amRNSDFC LOI Regarding Project Financing
25th Jan 20247:00 amRNSReceipt of further $1m Tranche from the DFC
2nd Jan 20247:00 amRNSProject Update
11th Dec 20237:00 amRNSDFS Update
30th Oct 20237:00 amRNSSPG Test Work Completed
10th Oct 202312:16 pmRNSReceipt of $1m Grant First Tranche from DFC
22nd Sep 20237:05 amRNSCorporate Presentation
22nd Sep 20237:00 amRNSDFC Grant Completed
4th Sep 20237:00 amRNSBulk Sampling Completed
23rd Aug 20237:16 amRNSHolding(s) in Company
14th Aug 20237:57 amRNSBulk Sampling Update & China Visit
18th Jul 20237:00 amRNSWarrants Update
22nd Jun 20231:49 pmRNSCEO Interview
19th Jun 20237:00 amRNSMetallurgical test work results
2nd Jun 20237:00 amRNSHalf-year Report
24th May 20238:59 amRNSHolding(s) in Company
18th May 20237:46 amRNSPlacing to Raise £635,000
9th May 20237:00 amRNSWebinar Today
2nd May 20237:11 amRNSInvestor Webinar & Updated Presentation
27th Apr 20233:22 pmRNSStrategic Funding Partner for Orom-Cross
18th Apr 20237:00 amRNSWarrant Expiry Extension
2nd Mar 20237:49 amRNSResearch Note
27th Feb 20237:00 amRNSBulk Sampling Complete
15th Feb 202310:17 amRNSResult of AGM
23rd Jan 20237:00 amRNSAppointment of Leading Engineering Firm to DFS
16th Jan 20237:00 amRNSFinal Metallurgical Testing Programs
13th Jan 20237:00 amRNSAnnual Results 30 September 2022 & Notice of AGM
11th Jan 20234:40 pmRNSSecond Price Monitoring Extn
11th Jan 20234:35 pmRNSPrice Monitoring Extension
11th Jan 20237:00 amRNSExport Approval for Bulk Samples
6th Dec 20227:00 amRNSMetallurgical Test Work Update
17th Nov 20229:00 amRNSPrice Monitoring Extension
27th Oct 202211:10 amRNSIssue of Options
26th Oct 20227:00 amRNSStrategic Investment
24th Oct 20224:41 pmRNSSecond Price Monitoring Extn
24th Oct 20224:36 pmRNSPrice Monitoring Extension
6th Oct 202212:45 pmRNSWebinar Call
3rd Oct 20229:06 amRNSSecond Price Monitoring Extn
3rd Oct 20229:00 amRNSPrice Monitoring Extension
3rd Oct 20227:00 amRNSStrategic Party
27th Sep 202210:56 amRNSChange of Registered Office
26th Sep 20227:00 amRNSDFS Update
6th Sep 20227:00 amRNSAkelikongo Nickel Project Update
25th Jul 202210:00 amRNSInvestor Webinar

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.