Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBlencowe Resources Regulatory News (BRES)

Share Price Information for Blencowe Resources (BRES)

Share Price is delayed by 15 minutes
Get Live Data
8.10    0.06 (0.75%)
Bid:
7.90
Ask:
8.30
Spread: 0.40 (5.063%)
Market Cap: £39.85m
BRES Live PriceLast checked at - London Stock Exchange

Intraday Blencowe Resources Share Chart

JORC Resource Update

26 Nov 2020 07:16

RNS Number : 6003G
Blencowe Resources PLC
26 November 2020
 

26 November 2020 Blencowe Resources Plc

 

("Blencowe" or the "Company")

 

JORC Resource progressing at Orom-Cross

 

The Company is pleased to provide an update on progress of the Orom-Cross Graphite Project JORC Resource program.

 

Highlights

· Maiden Resource to be reported in early Q1 2021

· Leading graphite specialists SGS Lakefield undertaking phase two metallurgical work on track to deliver results in Q1 2021

· Metallurgical work to define the end product concentrate and allow more detailed discussions with potential off-takers and industrial customers

 

Following completion of the 69 hole (1,950m) diamond drill programme into the Eastern Limb Lode and the High-Grade Camp Lode in September, logging of core was completed in October and sample preparation have now been completed at a JORC-accredited lab in Tanzania. The Company intends to deliver a maiden JORC Resource for Orom-Cross in early Q1 of 2021.

 Preparation of 1,900 samples has been completed at SGS in Tanzania for both grade assaying and metallurgical testing. Samples have now been dispatched from Tanzania to SGS laboratories in South Africa for assaying of the relevant elements as well as moisture and Specific Gravity determinations. Once completed this data will be submitted to Minrom Geological Consultants to complete the JORC Resource modelling.

The Board anticipate that the maiden JORC Resource will only represent a small percentage of the overall Orom Cross deposit and give sufficient confidence for a minimum of 10 years mine life on which to deliver a feasibility study. Blencowe intends to incorporate these results to present a Feasibility Study in 2021, which will deliver first commercial outcomes for the project and map out first production.

In parallel to this work, separate samples are being dispatched to SGS Lakefield in Canada for Phase Two metallurgical testing, using the services of one the leading graphite specialists worldwide. SGS Lakefield have delivered met test work on a significant number of major graphite projects in the past and their expertise will be critical ahead. Their work will identify the end product concentrate at Orom-Cross and provide Blencowe with the process flow models and initial plant and processing stream(s) to deliver final product. This work stream is particularly important for us to progress interest with industrial groups that have established an interest in the Orom Cross graphite product. Following the metallurgical studies we are better positioned to enter into more detailed conversations with potential off-takers and industrial customers.

 

Executive Chairman, Cameron Pearce, commented; 

"The continued growth of electric vehicle (EV) transport continues to accelerate particularly with the recent announcement by the UK Government to remove petrol and diesel cars from 2030. All EVs are currently powered by lithium-ion batteries of which flake graphite forms over 50% of Li-ion battery, therefore, the graphite demand curve is expected to surge over the next decade. We continue to register notable interest for the Orom Cross graphite product and look forward to delivering the metallurgical test work so that we can progress commercial discussions with these industrial groups and progress the feasibility work to underpin a robust project."

 

 

 

For further information please contact:

 

 

Blencowe Resources Plc

Sam Quinn (UK Director)

 

 

 

www.blencoweresourcesplc.com

Tel: +44 (0)1624 681 250

info@blencoweresourcesplc.com

Brandon Hill Capital Limited

Jonathan Evans (Corporate Finance)

 

Tel: +44 (0)20 3463 5000

jonathan.evans@brandonhillcapital.com

Background

Orom-Cross is a potential world class graphite project both by size and end-product quality, with a high component of larger flakes identified from previous work performed. A 21-year Mining Licence was issued by the Ugandan Government in 2019 following extensive historical work on the deposit.

Orom-Cross presents as a large, shallow open pitable deposit, with an estimated resource in excess of 3 billion tonnes of graphite. Development of the resource is expected to benefit from a low strip ratio and free dig operations, thereby ensuring lower operating and capital costs.

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDPPGPGGUPUUMQ
Date   Source Headline
4th Jun 20267:01 amRNS-ROak Securities Research Note Following DFS Update
2nd Jun 202610:45 amRNSExercise of Share Options
29th May 20267:00 amRNSOrom Cross Graphite DFS NPV10 up 15% to US$1.254bn
28th May 20267:04 amRNS-RAppointment of Joint Broker
26th May 202612:46 pmRNSHalf-year Financial Report
18th May 20267:00 amRNSBeehive Deposit Maiden JORC Resource
7th May 20267:36 amRNSRocket Component Testing Programme
30th Apr 20267:00 amRNSBeehive Final Assay Results
16th Apr 20267:00 amRNSBeehive Drilling Results
17th Mar 20267:00 amRNSBeehive Drilling Returns Multiple 30m Intercepts
17th Mar 20267:00 amRNSBeehive Drilling Returns Multiple 30m Intercepts
13th Mar 202612:57 pmRNSEXERCISE OF SHARE OPTIONS
6th Mar 20267:00 amRNSMaiden 16.9 Mt JORC Resource for Iyan Deposit
26th Feb 20262:57 pmRNSResult of AGM
24th Feb 20267:00 amRNSFinal Ilyan Drilling Results
20th Feb 202611:03 amRNSLong Term Incentive Programme
16th Feb 20267:00 amRNSUS AD/CVD Ruling Supports Non-China Supply
10th Feb 20267:00 amRNSHigh Value Synthetic Diamond Manufacture
6th Feb 20267:00 amRNSIyan - Further Significant Graphite Intercepts
2nd Feb 20267:00 amRNSIyan Deposit Delivers Multiple Intercepts over 30M
30th Jan 202611:29 amRNSAnnual Financial Report
23rd Jan 20267:57 amRNSEuropean Processing & Offtake with Alkeemia
15th Jan 20267:14 amRNSTestwork Confirms Highest Purity
13th Jan 202610:50 amRNSBlock Listing Application
13th Jan 20267:00 amRNS-RBroker Research Initiation
9th Jan 20267:00 amRNSBeehive Delivers 2 Standout +90 metre Intercepts
7th Jan 20269:17 amRNSDFS Performance Shares - Replacement
7th Jan 20268:25 amRNSExercise of Warrants
5th Jan 20264:14 pmRNSExercise of Warrants
30th Dec 202510:54 amRNSIssue of DFS Performance Shares
30th Dec 202510:54 amRNSIssue of DFS Performance Shares
23rd Dec 20257:00 amRNSBeehive Returns 92.55m @ 6.83% TGC from Surface
18th Dec 20257:00 amRNSFurther Strong Deep-Hole Results at Iyan
16th Dec 202511:47 amRNSExercise of Warrants
12th Dec 20257:00 amRNSExceptional Iyan Deep Hole Highlights Scale
11th Dec 20257:00 amRNSFundraise of £3m
9th Dec 20257:01 amRNSOfftake MOU with Yunasko Ltd.
9th Dec 20257:00 amRNSExercise of Warrants
8th Dec 20253:46 pmRNSExercise of Warrants
2nd Dec 20257:00 amRNSExercise of Share Options
1st Dec 20258:58 amRNS-RPresentation & Interview
1st Dec 20257:00 amRNSDFS Results Confirms Outstanding Economics
27th Nov 20257:00 amRNSJORC Resource Upgrade
25th Nov 202510:30 amRNSPublication of a Prospectus
17th Nov 20257:00 amRNSExercise of Warrants
13th Nov 202512:08 pmRNSExercise of Warrants
13th Nov 20258:30 amRNS-RResourcing Tomorrow Conference
12th Nov 202510:47 amRNSHolding(s) in Company
7th Nov 20258:00 amRNS-RCEO Interview
31st Oct 20257:08 amRNSNorthern Syncline Drilling Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.