If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBlencowe Resources Regulatory News (BRES)

Share Price Information for Blencowe Resources (BRES)

Share Price is delayed by 15 minutes
Get Live Data
7.35    0.00 (0.00%)
Bid:
0.00
Ask:
0.00
Spread: 0.30 (4.167%)
Market Cap: £36.19m
BRES Live PriceLast checked at - London Stock Exchange

Intraday Blencowe Resources Share Chart

JORC Resource Update

26 Nov 2020 07:16

RNS Number : 6003G
Blencowe Resources PLC
26 November 2020
 

26 November 2020 Blencowe Resources Plc

 

("Blencowe" or the "Company")

 

JORC Resource progressing at Orom-Cross

 

The Company is pleased to provide an update on progress of the Orom-Cross Graphite Project JORC Resource program.

 

Highlights

· Maiden Resource to be reported in early Q1 2021

· Leading graphite specialists SGS Lakefield undertaking phase two metallurgical work on track to deliver results in Q1 2021

· Metallurgical work to define the end product concentrate and allow more detailed discussions with potential off-takers and industrial customers

 

Following completion of the 69 hole (1,950m) diamond drill programme into the Eastern Limb Lode and the High-Grade Camp Lode in September, logging of core was completed in October and sample preparation have now been completed at a JORC-accredited lab in Tanzania. The Company intends to deliver a maiden JORC Resource for Orom-Cross in early Q1 of 2021.

 Preparation of 1,900 samples has been completed at SGS in Tanzania for both grade assaying and metallurgical testing. Samples have now been dispatched from Tanzania to SGS laboratories in South Africa for assaying of the relevant elements as well as moisture and Specific Gravity determinations. Once completed this data will be submitted to Minrom Geological Consultants to complete the JORC Resource modelling.

The Board anticipate that the maiden JORC Resource will only represent a small percentage of the overall Orom Cross deposit and give sufficient confidence for a minimum of 10 years mine life on which to deliver a feasibility study. Blencowe intends to incorporate these results to present a Feasibility Study in 2021, which will deliver first commercial outcomes for the project and map out first production.

In parallel to this work, separate samples are being dispatched to SGS Lakefield in Canada for Phase Two metallurgical testing, using the services of one the leading graphite specialists worldwide. SGS Lakefield have delivered met test work on a significant number of major graphite projects in the past and their expertise will be critical ahead. Their work will identify the end product concentrate at Orom-Cross and provide Blencowe with the process flow models and initial plant and processing stream(s) to deliver final product. This work stream is particularly important for us to progress interest with industrial groups that have established an interest in the Orom Cross graphite product. Following the metallurgical studies we are better positioned to enter into more detailed conversations with potential off-takers and industrial customers.

 

Executive Chairman, Cameron Pearce, commented; 

"The continued growth of electric vehicle (EV) transport continues to accelerate particularly with the recent announcement by the UK Government to remove petrol and diesel cars from 2030. All EVs are currently powered by lithium-ion batteries of which flake graphite forms over 50% of Li-ion battery, therefore, the graphite demand curve is expected to surge over the next decade. We continue to register notable interest for the Orom Cross graphite product and look forward to delivering the metallurgical test work so that we can progress commercial discussions with these industrial groups and progress the feasibility work to underpin a robust project."

 

 

 

For further information please contact:

 

 

Blencowe Resources Plc

Sam Quinn (UK Director)

 

 

 

www.blencoweresourcesplc.com

Tel: +44 (0)1624 681 250

info@blencoweresourcesplc.com

Brandon Hill Capital Limited

Jonathan Evans (Corporate Finance)

 

Tel: +44 (0)20 3463 5000

jonathan.evans@brandonhillcapital.com

Background

Orom-Cross is a potential world class graphite project both by size and end-product quality, with a high component of larger flakes identified from previous work performed. A 21-year Mining Licence was issued by the Ugandan Government in 2019 following extensive historical work on the deposit.

Orom-Cross presents as a large, shallow open pitable deposit, with an estimated resource in excess of 3 billion tonnes of graphite. Development of the resource is expected to benefit from a low strip ratio and free dig operations, thereby ensuring lower operating and capital costs.

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDPPGPGGUPUUMQ
Date   Source Headline
12th Nov 202510:47 amRNSHolding(s) in Company
7th Nov 20258:00 amRNS-RCEO Interview
31st Oct 20257:08 amRNSNorthern Syncline Drilling Results
23rd Oct 202510:48 amRNSExercise of Warrants
21st Oct 20257:00 amRNSFurther Drilling Results - Camp Lode
17th Oct 202511:08 amRNS-RInterview with CEO Mike Ralston -DFS Progress
17th Oct 20257:00 amRNSFurther Battery Testing Success
15th Oct 20255:00 pmRNSHolding(s) in Company
8th Oct 202512:24 pmRNSExercise of Warrants
3rd Oct 20257:00 amRNSIssue of DFC Performance Shares and DFS Options
1st Oct 20251:19 pmRNSExercise of Warrants
26th Sep 20259:04 amRNSHolding(s) in Company
25th Sep 20257:00 amRNSDrilling Results
23rd Sep 20257:00 amRNSHolding(s) in Company
12th Sep 20257:00 amRNSFundraise of £1.12m and Exercise of Options at 6p
10th Sep 20257:00 amRNS-RUpdated Corporate Presentation
4th Sep 20257:00 amRNSAppointment of Project Finance Adviser
22nd Aug 20257:00 amRNSCompletion of Orom-Cross DFS Programmes
12th Aug 20257:00 amRNSIssue of Equity
1st Aug 20257:00 amRNSOfftake Agreement Signed
30th Jul 20257:00 amRNSExercise of Warrants
17th Jul 20257:00 amRNSStage 7 Drill Program Completed
8th Jul 202510:48 amRNSExercise of Warrants
8th Jul 20257:00 amRNSReceipt of US$0.75 million from DFC
2nd Jul 20257:00 amRNSDeep Drilling at Northern Syncline
26th Jun 20257:00 amRNSStage 7 Drilling Program Update
13th Jun 20257:00 amRNSSAFELOOP Testing Update
2nd Jun 20253:56 pmRNSInterim Consolidated FS Six Month End 31 Mar 2025
23rd May 20257:00 amRNSFurther US$0.5M Grant Funding Received From DFC
22nd May 20259:36 amRNSHolding(s) in Company
21st May 20257:00 amRNS-RInterview with CEO
7th May 20257:00 amRNSStage 7 Drill Program Nears Completion
22nd Apr 20254:43 pmRNSResults of Retail Offer - Replacement
16th Apr 20258:14 amRNSResults of Retail Offer
15th Apr 20254:40 pmRNSRetail Offer to Raise up to £100,000
15th Apr 20254:35 pmRNSFundraise of £1m to support completion of the DFS
8th Apr 20257:39 amRNSOfftake Agreement with TaiDa
31st Mar 20257:00 amRNSDrilling Update
21st Mar 20257:00 amRNSESIA Approval
19th Mar 20257:00 amRNSOfftake for Purified Graphite
3rd Mar 20257:00 amRNSAFC Expression of Interest
26th Feb 20254:32 pmRNSResult of AGM
20th Feb 20257:00 amRNSHydropower Study
14th Feb 20257:00 amRNS7,000m Drilling Programme
31st Jan 20258:56 amRNSAnnual Financial Report
30th Jan 20257:00 amRNSSAFELOOP Update
28th Jan 20257:00 amRNS-RWebinar 25 February 2025
9th Jan 20257:00 amRNSCommencement of Drilling
19th Dec 202411:02 amRNSResult of Meeting
10th Dec 202410:04 amRNS-RUpdated Corporate Presentation

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.