Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBlencowe Resources Regulatory News (BRES)

Share Price Information for Blencowe Resources (BRES)

Share Price is delayed by 15 minutes
Get Live Data
7.00    0.00 (0.00%)
Bid:
6.80
Ask:
7.20
Spread: 0.40 (5.882%)
Market Cap: £34.47m
BRES Live PriceLast checked at - London Stock Exchange

Intraday Blencowe Resources Share Chart

JORC Resource Update

26 Nov 2020 07:16

RNS Number : 6003G
Blencowe Resources PLC
26 November 2020
 

26 November 2020 Blencowe Resources Plc

 

("Blencowe" or the "Company")

 

JORC Resource progressing at Orom-Cross

 

The Company is pleased to provide an update on progress of the Orom-Cross Graphite Project JORC Resource program.

 

Highlights

· Maiden Resource to be reported in early Q1 2021

· Leading graphite specialists SGS Lakefield undertaking phase two metallurgical work on track to deliver results in Q1 2021

· Metallurgical work to define the end product concentrate and allow more detailed discussions with potential off-takers and industrial customers

 

Following completion of the 69 hole (1,950m) diamond drill programme into the Eastern Limb Lode and the High-Grade Camp Lode in September, logging of core was completed in October and sample preparation have now been completed at a JORC-accredited lab in Tanzania. The Company intends to deliver a maiden JORC Resource for Orom-Cross in early Q1 of 2021.

 Preparation of 1,900 samples has been completed at SGS in Tanzania for both grade assaying and metallurgical testing. Samples have now been dispatched from Tanzania to SGS laboratories in South Africa for assaying of the relevant elements as well as moisture and Specific Gravity determinations. Once completed this data will be submitted to Minrom Geological Consultants to complete the JORC Resource modelling.

The Board anticipate that the maiden JORC Resource will only represent a small percentage of the overall Orom Cross deposit and give sufficient confidence for a minimum of 10 years mine life on which to deliver a feasibility study. Blencowe intends to incorporate these results to present a Feasibility Study in 2021, which will deliver first commercial outcomes for the project and map out first production.

In parallel to this work, separate samples are being dispatched to SGS Lakefield in Canada for Phase Two metallurgical testing, using the services of one the leading graphite specialists worldwide. SGS Lakefield have delivered met test work on a significant number of major graphite projects in the past and their expertise will be critical ahead. Their work will identify the end product concentrate at Orom-Cross and provide Blencowe with the process flow models and initial plant and processing stream(s) to deliver final product. This work stream is particularly important for us to progress interest with industrial groups that have established an interest in the Orom Cross graphite product. Following the metallurgical studies we are better positioned to enter into more detailed conversations with potential off-takers and industrial customers.

 

Executive Chairman, Cameron Pearce, commented; 

"The continued growth of electric vehicle (EV) transport continues to accelerate particularly with the recent announcement by the UK Government to remove petrol and diesel cars from 2030. All EVs are currently powered by lithium-ion batteries of which flake graphite forms over 50% of Li-ion battery, therefore, the graphite demand curve is expected to surge over the next decade. We continue to register notable interest for the Orom Cross graphite product and look forward to delivering the metallurgical test work so that we can progress commercial discussions with these industrial groups and progress the feasibility work to underpin a robust project."

 

 

 

For further information please contact:

 

 

Blencowe Resources Plc

Sam Quinn (UK Director)

 

 

 

www.blencoweresourcesplc.com

Tel: +44 (0)1624 681 250

info@blencoweresourcesplc.com

Brandon Hill Capital Limited

Jonathan Evans (Corporate Finance)

 

Tel: +44 (0)20 3463 5000

jonathan.evans@brandonhillcapital.com

Background

Orom-Cross is a potential world class graphite project both by size and end-product quality, with a high component of larger flakes identified from previous work performed. A 21-year Mining Licence was issued by the Ugandan Government in 2019 following extensive historical work on the deposit.

Orom-Cross presents as a large, shallow open pitable deposit, with an estimated resource in excess of 3 billion tonnes of graphite. Development of the resource is expected to benefit from a low strip ratio and free dig operations, thereby ensuring lower operating and capital costs.

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDPPGPGGUPUUMQ
Date   Source Headline
9th Dec 20247:00 amRNSExercise of Warrants
28th Nov 20247:00 amRNSBlencowe Joins European EV Consortium
26th Nov 202412:12 pmRNSPublication of a Prospectus
19th Nov 20248:00 amRNSShareholder Question & Answers
13th Nov 20247:00 amRNS6,700m Drilling Programme to Commence
12th Nov 20243:11 pmRNSHolding(s) in Company
7th Nov 20247:00 amRNSResults of Retail Offer
6th Nov 20247:01 amRNSBookBuild Retail Offer
6th Nov 20247:00 amRNSCapital Raise of £1.5m
8th Oct 20247:00 amRNSGlobal MSP Accreditation
5th Sep 20247:00 amRNSMoU signed for Graphite Beneficiation in Uganda
2nd Sep 20247:00 amRNS600 tonne Processing Graphite to Battery Ready SPG
22nd Jul 20247:00 amRNSIssue of Equity
15th Jul 20247:00 amRNSDFC Grant Fourth Tranche
5th Jul 20247:00 amRNSConversion of 600t bulk sample to concentrate
25th Jun 20247:17 amRNS600t Bulk Sample Nearing Completion
14th Jun 20247:00 amRNSHalf-year Report
10th Jun 20247:00 amRNSFirst offtake for 15,000 tonnes
3rd Jun 20247:00 amRNSCorporate Presentation Updated
28th May 20249:00 amRNSCEO Video Interview
15th Apr 20247:00 amRNSBulk Sample Update
10th Apr 20247:00 amRNSReceipt of Third Tranche from DFC
26th Feb 20248:52 amRNSResult of AGM
9th Feb 20247:00 amRNSSubscription & Conditional Subscription - Replace
6th Feb 20247:00 amRNSSubscription & Conditional Subscription
31st Jan 20247:00 amRNSAnnual Financial Report
29th Jan 20247:00 amRNSDFC LOI Regarding Project Financing
25th Jan 20247:00 amRNSReceipt of further $1m Tranche from the DFC
2nd Jan 20247:00 amRNSProject Update
11th Dec 20237:00 amRNSDFS Update
30th Oct 20237:00 amRNSSPG Test Work Completed
10th Oct 202312:16 pmRNSReceipt of $1m Grant First Tranche from DFC
22nd Sep 20237:05 amRNSCorporate Presentation
22nd Sep 20237:00 amRNSDFC Grant Completed
4th Sep 20237:00 amRNSBulk Sampling Completed
23rd Aug 20237:16 amRNSHolding(s) in Company
14th Aug 20237:57 amRNSBulk Sampling Update & China Visit
18th Jul 20237:00 amRNSWarrants Update
22nd Jun 20231:49 pmRNSCEO Interview
19th Jun 20237:00 amRNSMetallurgical test work results
2nd Jun 20237:00 amRNSHalf-year Report
24th May 20238:59 amRNSHolding(s) in Company
18th May 20237:46 amRNSPlacing to Raise £635,000
9th May 20237:00 amRNSWebinar Today
2nd May 20237:11 amRNSInvestor Webinar & Updated Presentation
27th Apr 20233:22 pmRNSStrategic Funding Partner for Orom-Cross
18th Apr 20237:00 amRNSWarrant Expiry Extension
2nd Mar 20237:49 amRNSResearch Note
27th Feb 20237:00 amRNSBulk Sampling Complete
15th Feb 202310:17 amRNSResult of AGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.