Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBlencowe Resources Regulatory News (BRES)

Share Price Information for Blencowe Resources (BRES)

Share Price is delayed by 15 minutes
Get Live Data
8.10    0.06 (0.75%)
Bid:
7.90
Ask:
8.30
Spread: 0.40 (5.063%)
Market Cap: £39.85m
BRES Live PriceLast checked at - London Stock Exchange

Intraday Blencowe Resources Share Chart

Drilling Results

25 Sep 2025 07:00

RNS Number : 7199A
Blencowe Resources PLC
25 September 2025
 

Date: 25 September 2025

 

Blencowe Resources Plc

("Blencowe" or the "Company"),

 

Initial Drill Results at Orom-Cross Highlight High Grade Shallow Zones

First assay results from latest 7,750m programme confirm extensions to orebody and further high-grade zones

 

Blencowe Resources Plc (LSE: BRES) is pleased to announce the first batch of assay results from its Stage 7 drilling programme at its Orom-Cross graphite project in Northern Uganda. This campaign, the largest in the Company's history, included geotechnical holes, infill drilling and exploration drilling across both the Camp Lode and Northern Syncline deposits, as well step-out and deep drilling at the newly identified Beehive deposit.

Assays are being processed in batches for each component of the programme and will be reported regularly as results are returned. The first results, from the eight geotechnical holes drilled primarily to support pit design, have returned strong graphite grades.

These results confirm extensions to mineralisation and highlight high-grade zones within the existing deposits, further underscoring Orom-Cross's unique combination of high grade, shallow ore and large-scale potential.

 

Highlights:

Camp Lode

· Hole CLGT03: 27.54m @ 8.68% TGC, including 1.3m @ 18.98% TGC and 1.3m @ 13.46%TGC→ Confirms high-grade extensions to the orebody to the south-east.

· Hole CLGT02: 3.96m @ 9.08% TGC at depth.

· Shallow intersections in CLGT01 and CLGT04 confirm near-surface mineralisation and potential to extend the pit to the north.

Significance: Adds higher-grade tonnes to the Camp Lode resource and optimises mine scheduling for early production phases.

Northern Syncline

· Hole NSGT02: 27.98m @ 4.61% TGC, including 5.57m @ 8.10% TGC (majority

· Hole NSGT04: 12.37m @ 6.09% TGC.

Significance: Confirms shallow, high-grade mineralisation continuity in infill zones which are critical for low-cost, open-pitable production.

 

Drilling Programme Integration

· Geotechnical data will feed directly into Definitive Feasibility Study ("DFS") pit wall design and mine scheduling.

· All results will be incorporated into the JORC Resource upgrade, which is expected to deliver a material increase in Reserves to support large-scale mining over life of mine.

· Additional assays from infill, step-out and deep drilling (Beehive deposit) programmes are expected shortly.

 

Construction of a Permanent Camp

Work is now underway on building a permanent camp at Orom-Cross which is expected to support further exploration in 2026 and provide facilities for contractors during the construction of the mine. This permanent camp represents the first tangible permanent structures on site which underlines the progress being made. With the DFS expected to be completed in Q4 2025 the next steps thereafter will be project funding and then construction of the mine.

 

Executive Chairman Cameron Pearce commented:

"The results confirm high-grade extensions to both Camp Lode and Northern Syncline, while reinforcing the advantage of shallow, easily mined ore that underpins our low-cost production profile.

All this data will be fed directly into both our JORC Resource upgrade and the Definitive Feasibility Study, which is due for completion in Q4 2025. Increasing ore reserves at higher grades is a critical step and we expect this to not only enhance the mine plan but also translate into a considerable uplift to project economics and NPV.

Orom-Cross already benefits from a unique combination of attributes, including abundant low cost national-grid hydropower, established roads and infrastructure, and independent test work from both Wuhan University and American Energy Technologies confirming some of the highest SPG purities recorded (up to 99.99% GC). This underscores the exceptional quality of Orom-Cross graphite and its suitability for premium battery-grade markets. Together, these factors give Orom-Cross a rare blend of scale, quality and deliverability that make it a truly bankable graphite opportunity.

With assays now beginning to come through and more results to follow we look forward to a steady flow of updates, including the JORC upgrade and the DFS. These milestones will showcase Orom-Cross as a standout global graphite project, provide the platform to move directly into financing discussions, and ultimately set the stage for a major value re-rating as we continue to de-risk."

Preliminary drill results Camp Lode

 

Preliminary drill results Northern Syncline

 

Further Drilling Detail

The Company drilled four geotechnical holes in each of the Northern Syncline and Camp Lode deposits. While primarily designed for geotechnical assessment to inform pit wall design, all holes were sampled for assays and incorporated into resource database.

At Camp Lode, these holes have indicated a possible extension to the orebody in the south-east, with hole CLGT03 intersecting 27.54m @ 8.68%GC including 2 separate intersections of 1.3M with grades of 18.98%GC and 13.46%GC respectively. These represent very high grades of graphite in comparison to the overall Orom-Cross resource. An additional intersection from hole CLGT02 of 3.96m @ 9.08%GC at depth and intersections near surface in holes CLGT01 and CLGT04 indicate potential to extend the pit to the north.

Similarly, at Northern Syncline hole NSGT02 intersected 27.98m @ 4.61%GC (including 5.57m @ 8.10%GC) and NSGT04 with 12.37m @ 6.09%GC. The intersection from NSGT02 occurs within the area of the completed infill drilling with the majority of the intersection occurring within 30 meters of the surface. The ability to mine substantial volume of graphite from shallow depths contributes to Orom-Cross having operating costs sitting within the lowest percentile of graphite projects worldwide, and this is considered a major advantage as Blencowe drives towards first production.

The results from all eight holes will be included within the resource model updates. The assay labs are continuing to prioritise the Orom-Cross samples and the Company expects further results of the infill program shortly.

 

For further information please contact:

 

 Blencowe Resources Plc

 Sam Quinn

 

www.blencoweresourcesplc.com

Tel: +44 (0)1624 681 250

info@blencoweresourcesplc.com

 

Investor Relations

Sasha Sethi

Tel: +44 (0) 7891 677 441

sasha@flowcomms.com

 

Tavira Financial 

Jonathan Evans

Tel: +44 (0)20 3192 1733

jonathan.evans@tavira.group

 

Twitter https://twitter.com/BlencoweRes

LinkedIn https://www.linkedin.com/company/72382491/admin/

 

Background

Orom-Cross Graphite Project

Orom-Cross is a potential world class graphite project both by size and end-product quality, with a high component of more valuable larger flakes within the deposit.

A 21-year Mining Licence for the project was issued by the Ugandan Government in 2019 following extensive historical work on the deposit and Blencowe is finalising the Definitive Feasibility Study phase as it drives towards first production.

Orom-Cross presents as a large, shallow open-pitable deposit, with a maiden JORC Indicated & Inferred Mineral Resource deposit of 24.5Mt @ 6.0% Total Graphite Content. Development of the resource is expected to benefit from a low strip ratio and free dig operations, thereby ensuring lower operating and capital costs.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLBZLLLEKLXBBD
Date   Source Headline
4th Jun 20267:01 amRNS-ROak Securities Research Note Following DFS Update
2nd Jun 202610:45 amRNSExercise of Share Options
29th May 20267:00 amRNSOrom Cross Graphite DFS NPV10 up 15% to US$1.254bn
28th May 20267:04 amRNS-RAppointment of Joint Broker
26th May 202612:46 pmRNSHalf-year Financial Report
18th May 20267:00 amRNSBeehive Deposit Maiden JORC Resource
7th May 20267:36 amRNSRocket Component Testing Programme
30th Apr 20267:00 amRNSBeehive Final Assay Results
16th Apr 20267:00 amRNSBeehive Drilling Results
17th Mar 20267:00 amRNSBeehive Drilling Returns Multiple 30m Intercepts
17th Mar 20267:00 amRNSBeehive Drilling Returns Multiple 30m Intercepts
13th Mar 202612:57 pmRNSEXERCISE OF SHARE OPTIONS
6th Mar 20267:00 amRNSMaiden 16.9 Mt JORC Resource for Iyan Deposit
26th Feb 20262:57 pmRNSResult of AGM
24th Feb 20267:00 amRNSFinal Ilyan Drilling Results
20th Feb 202611:03 amRNSLong Term Incentive Programme
16th Feb 20267:00 amRNSUS AD/CVD Ruling Supports Non-China Supply
10th Feb 20267:00 amRNSHigh Value Synthetic Diamond Manufacture
6th Feb 20267:00 amRNSIyan - Further Significant Graphite Intercepts
2nd Feb 20267:00 amRNSIyan Deposit Delivers Multiple Intercepts over 30M
30th Jan 202611:29 amRNSAnnual Financial Report
23rd Jan 20267:57 amRNSEuropean Processing & Offtake with Alkeemia
15th Jan 20267:14 amRNSTestwork Confirms Highest Purity
13th Jan 202610:50 amRNSBlock Listing Application
13th Jan 20267:00 amRNS-RBroker Research Initiation
9th Jan 20267:00 amRNSBeehive Delivers 2 Standout +90 metre Intercepts
7th Jan 20269:17 amRNSDFS Performance Shares - Replacement
7th Jan 20268:25 amRNSExercise of Warrants
5th Jan 20264:14 pmRNSExercise of Warrants
30th Dec 202510:54 amRNSIssue of DFS Performance Shares
30th Dec 202510:54 amRNSIssue of DFS Performance Shares
23rd Dec 20257:00 amRNSBeehive Returns 92.55m @ 6.83% TGC from Surface
18th Dec 20257:00 amRNSFurther Strong Deep-Hole Results at Iyan
16th Dec 202511:47 amRNSExercise of Warrants
12th Dec 20257:00 amRNSExceptional Iyan Deep Hole Highlights Scale
11th Dec 20257:00 amRNSFundraise of £3m
9th Dec 20257:01 amRNSOfftake MOU with Yunasko Ltd.
9th Dec 20257:00 amRNSExercise of Warrants
8th Dec 20253:46 pmRNSExercise of Warrants
2nd Dec 20257:00 amRNSExercise of Share Options
1st Dec 20258:58 amRNS-RPresentation & Interview
1st Dec 20257:00 amRNSDFS Results Confirms Outstanding Economics
27th Nov 20257:00 amRNSJORC Resource Upgrade
25th Nov 202510:30 amRNSPublication of a Prospectus
17th Nov 20257:00 amRNSExercise of Warrants
13th Nov 202512:08 pmRNSExercise of Warrants
13th Nov 20258:30 amRNS-RResourcing Tomorrow Conference
12th Nov 202510:47 amRNSHolding(s) in Company
7th Nov 20258:00 amRNS-RCEO Interview
31st Oct 20257:08 amRNSNorthern Syncline Drilling Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.