If you would like to ask our webinar guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund a question please submit them here.

 

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBlencowe Resou. Regulatory News (BRES)

Share Price Information for Blencowe Resou. (BRES)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 5.25
Bid: 5.00
Ask: 5.50
Change: 0.20 (3.96%)
Spread: 0.50 (10.00%)
Open: 5.05
High: 5.25
Low: 5.10
Prev. Close: 5.05
BRES Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Results of Metallurgical Test Work

13 Jul 2021 07:34

RNS Number : 0494F
Blencowe Resources PLC
13 July 2021
 

Date: 13 July 2021 Blencowe Resources Plc

 

Results of Metallurgical Test Work by SGS Lakefield

98% TGC Underlines Exceptional Qualities of End Products

 

Highlights:

· Concentrate grades consistently ranged at the top end of the spectrum, between 97-98% TGC (versus an internal target of 94% TGC)

· Low impurities

· Approximately 40% of the end product presents as jumbo/XL/large flakes and 60% as medium/smaller flakes

· the process requires no primary crushing or grinding of the ore which offers a material advantage over hard-rock graphite deposits, both in terms of lower capital expenditure and lower operating costs

· offtake discussions can be advanced rapidly with latest test work

 

 

 

Blencowe Resources Plc, is pleased to announce that metallurgical test work on its Orom-Cross graphite project in Northern Uganda has been successfully completed by SGS Lakefield, generally regarded as one of the leading technical consultants in the world on matters concerning graphite concentrates. This work is critical to understanding the quality of the end-product(s) that Orom-Cross can deliver to market as a high grade graphite concentrate, as well as what the process flow will look like to achieve this.

Scope of Metallurgical Testwork

The critical issues to determine quality of end product are (1) high TCG concentrate, with anything over 94% considered good and anything above 97% considered excellent, (2) low impurities, and (3) flakes sizes. As example +32 mesh Super Jumbo (97% TGC) will sell for over US$2,500/tonne in comparison to -100 mesh Small flakes (97% TGC) selling for circa US$700/t.

Blencowe appointed SGS Lakefield in Canada to undertake metallurgical testwork on material gathered from its 69 hole, 1950 metre 2020 diamond drilling programme, which covered both the Northern Syncline and Camp Lode areas.

The metallurgical test program was designed to deliver the following Key Objectives:

· To confirm if a 95-97% TGC (Total Graphite Content) pure concentrate is possible. Entry level concentrate is generally accepted as 94% TGC and each 1% above that attracts a significant premium on price in the market.

· To confirm what impurities (specifically Thorium and Vanadium) may exist within the concentrate, and at what levels.

· To confirm ~80% recovery is achievable for this concentrate.

· To confirm the liberation process in order to maintain as high a percentage of Jumbo/XL/Large flakes within the concentrate as these attract the highest prices in the market.

· To confirm the process flow diagram for plant design as part of the forthcoming Feasibility Study.

· To deliver bulk concentrate to allow Blencowe to initiate discussions with potential off-take partners.

Results of Metallurgical Testwork

Blencowe is pleased to announce that all 5 Key Objectives have been met and/or exceeded in this round of testwork, specifically:

· Concentrate grades consistently ranged at the top end of the spectrum, between 97-98% TGC.

· Low, or in most cases, no impurities were found within the concentrate.

· Open cycle and locked cycle floatation test produced excellent recoveries between 80-90%.

· Approximately 40% of the end product presents as jumbo/XL/large flakes and 60% as medium/smaller flakes.

· A simple, neat process flow indicates a standard processing facility that can easily be designed and later expanded to meet strong anticipated growth ahead in the demand for graphite.

Overall the metallurgical test-work undertaken to date shows a robust flowsheet capable of repeatable metallurgy for a wide range of feed samples from Orom-Cross. This consistency is very important in delivering an end product of the highest quality.

Offtake Discussions

Blencowe is now better positioned to advance discussions with strategic groups in the knowledge it can deliver a range of high grade end products, and it can now deliver samples as required to provide evidence for further due diligence or local testing. Blencowe anticipates using already identified specialist consultants, with considerable experience in graphite sales and marketing, to provide advice and support as to where to sell its products moving forward.

 

Processing and Plant Design

A total of eight rougher and cleaner flotation tests were carried out on the Master Composite (being a combination of Northern Syncline and Camp Lode samples) that culminated in a flowsheet which is atypical of similar graphite projects. The flowsheet consists of a flash and rougher flotation stage followed by a primary cleaning circuit with a polishing mill followed by three stages of cleaner flotation. The intermediate concentrate is classified and then further upgraded in secondary cleaning circuits with stirred media mills (SMM) followed by cleaner flotation.

The proposed flowsheet was employed in a locked cycle test (LCT) to determine the metallurgical response under closed circuit conditions.

The final Master Composite concentrate graded 97.3% TGC, with a 90.1% TC (total carbon) recovery, which exceeded the company's expectations and places the project at the higher end of its peers.

The size fraction analysis results of the combined concentrate of the LCT are presented in Table 1.

At the end of the metallurgical program the suitability of the flowsheet and conditions of the proposed flowsheet were evaluated on four separate composites, which represented the high grade and low grade samples in each of the Northern Syncline and Camp Lode zones. The purpose was to understand the consistency of all graphite within Orom-Cross and also to evaluate the priority areas to mine in the event of a wide range of results.

The results show a remarkably consistent end product over both zones and also within the higher and lower in situ grades. Consistency is very valuable in these circumstances, both for mine planning as well as processing.

Combined concentrate grades ranged between 94.7% TGC for the Camp Lode high-grade composite to 98.1% TGC for the Camp Lode and North Syncline low-grade composites. The open circuit recoveries of the North Syncline and Camp Lode high-grade composites were 80.9% and 88.4% TC respectively. Despite the lower head grades of the North Syncline and Camp Lode low-grade composites, the open stage recoveries for the two samples remained high at 80.9% and 80.4% TC respectively.

 

Table 1: Size Fraction Analysis of Combined Concentrate of LCT

Particle Size

 

Assays

Distribution

Flake Category

Tyler mesh

 

(µm)

% C(t) (TGC)

% C(t)

 

+32

 

+500

98.1

1.5

Super Jumbo

-32 + 48

 

-500 + 297

98.0

12.3

Jumbo

-48 + 80

 

-297 + 177

97.7

22.6

Large

-80 + 100

 

-177 + 149

97.5

9.6

Medium

-100 + 200

 

-149 + 74

97.0

27.0

Small

-200

 

-74

96.6

13.0

Amorphous

-325

 

95.7

13.9

 

The above table highlights that Blencowe will be able to produce a range of high quality end products from Orom-Cross.

· 36.4% as Super Jumbo/Jumbo/Large flakes with an average 98% TGC.

· 63.6% as Medium/Small/Fines with an average 97% TGC.

 

The design of the processing plant is based on the SGS test-work and best practice in similar operations. Importantly, the process requires no primary crushing or grinding of the ore which offers a material advantage over hard-rock graphite deposits, both in terms of lower capital expenditure and lower operating costs. The basic flowsheet is shown below in Figure 1:

http://www.rns-pdf.londonstockexchange.com/rns/0494F_1-2021-7-13.pdf

 

 

Figure 1: Proposed Orom Flowsheet

 

 

Blencowe will mandate an experienced engineering firm to begin formal plant design and this work is expected to be included as part of the Pre-Feasibility Study.

 

 

Cameron Pearce, Executive Chairman's Statement:

"We are absolutely delighted to share these exceptional metallurgical test results for Orom-Cross. They highlight the fact that we have a very high quality of end products that we will produce, which should not only be in higher demand but should also deliver higher prices. In all facets these results have exceeded our expectations and they underline the world class potential of Orom-Cross.

Our ongoing drilling programs recently delivered our first 16Mt JORC Resource which we are in the process of upgrading via 2,000m further infill drilling, and we know that we have literally billions of tonnes of graphite at Orom-Cross which we can continue to develop as and when required. Now our metallurgical test results have added considerable weight to this by showing what an impressive range of end products we can deliver. The next step is to engage in more detail with strategic groups that have been waiting for the test work result and to begin reviewing the project economics of the mine.

Orom-Cross continues to emerge as a world class graphite project in a safe location. As we begin to outline the economics of Orom-Cross the full potential of what can be achieved will become abundantly clear."

 

For further information please contact:

 

Blencowe Resources Plc

Sam Quinn

 

 

Investor Relations

Sasha Sethi

 

 

www.blencoweresourcesplc.com

Tel: +44 (0)1624 681 250

info@lionsheadconsultants.com

 

Tel: +44 (0)7891 677 441

sasha@flowscomm.com

 

Brandon Hill Capital Limited

Jonathan Evans

 

Tel: +44 (0)20 3463 5000

jonathan.evans@brandonhillcapital.com

 

 First Equity Limited Tel: +44(0)20 7330 1883

 Jason Robertson jasonrobertson@firstequitylimited.com

 

Twitter https://twitter.com/BlencoweRes

LinkedIn https://www.linkedin.com/company/72382491/admin/

 

Background

Orom-Cross is a potential world class graphite project both by size and end-product quality, with a high component of more valuable larger flakes within the deposit. A 21-year Mining Licence for the project was issued by the Ugandan Government in 2019 following extensive historical work on the deposit and Blencowe is moving into the studies phase shortly as it drives towards first production.

Orom-Cross presents as a large, shallow open pitable deposit, with an estimated overall resource between 2-3 billion tonnes of graphite. Development of the resource is expected to benefit from a low strip ratio and free dig operations thereby ensuring lower operating and capital costs.

 

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCSFFSMDEFSEDW
Date   Source Headline
15th Apr 20247:00 amRNSBulk Sample Update
10th Apr 20247:00 amRNSReceipt of Third Tranche from DFC
26th Feb 20248:52 amRNSResult of AGM
9th Feb 20247:00 amRNSSubscription & Conditional Subscription - Replace
6th Feb 20247:00 amRNSSubscription & Conditional Subscription
31st Jan 20247:00 amRNSAnnual Financial Report
29th Jan 20247:00 amRNSDFC LOI Regarding Project Financing
25th Jan 20247:00 amRNSReceipt of further $1m Tranche from the DFC
2nd Jan 20247:00 amRNSProject Update
11th Dec 20237:00 amRNSDFS Update
30th Oct 20237:00 amRNSSPG Test Work Completed
10th Oct 202312:16 pmRNSReceipt of $1m Grant First Tranche from DFC
22nd Sep 20237:05 amRNSCorporate Presentation
22nd Sep 20237:00 amRNSDFC Grant Completed
4th Sep 20237:00 amRNSBulk Sampling Completed
23rd Aug 20237:16 amRNSHolding(s) in Company
14th Aug 20237:57 amRNSBulk Sampling Update & China Visit
18th Jul 20237:00 amRNSWarrants Update
22nd Jun 20231:49 pmRNSCEO Interview
19th Jun 20237:00 amRNSMetallurgical test work results
2nd Jun 20237:00 amRNSHalf-year Report
24th May 20238:59 amRNSHolding(s) in Company
18th May 20237:46 amRNSPlacing to Raise £635,000
9th May 20237:00 amRNSWebinar Today
2nd May 20237:11 amRNSInvestor Webinar & Updated Presentation
27th Apr 20233:22 pmRNSStrategic Funding Partner for Orom-Cross
18th Apr 20237:00 amRNSWarrant Expiry Extension
2nd Mar 20237:49 amRNSResearch Note
27th Feb 20237:00 amRNSBulk Sampling Complete
15th Feb 202310:17 amRNSResult of AGM
23rd Jan 20237:00 amRNSAppointment of Leading Engineering Firm to DFS
16th Jan 20237:00 amRNSFinal Metallurgical Testing Programs
13th Jan 20237:00 amRNSAnnual Results 30 September 2022 & Notice of AGM
11th Jan 20234:40 pmRNSSecond Price Monitoring Extn
11th Jan 20234:35 pmRNSPrice Monitoring Extension
11th Jan 20237:00 amRNSExport Approval for Bulk Samples
6th Dec 20227:00 amRNSMetallurgical Test Work Update
17th Nov 20229:00 amRNSPrice Monitoring Extension
27th Oct 202211:10 amRNSIssue of Options
26th Oct 20227:00 amRNSStrategic Investment
24th Oct 20224:41 pmRNSSecond Price Monitoring Extn
24th Oct 20224:36 pmRNSPrice Monitoring Extension
6th Oct 202212:45 pmRNSWebinar Call
3rd Oct 20229:06 amRNSSecond Price Monitoring Extn
3rd Oct 20229:00 amRNSPrice Monitoring Extension
3rd Oct 20227:00 amRNSStrategic Party
27th Sep 202210:56 amRNSChange of Registered Office
26th Sep 20227:00 amRNSDFS Update
6th Sep 20227:00 amRNSAkelikongo Nickel Project Update
25th Jul 202210:00 amRNSInvestor Webinar

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.