The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBotswana Diam Regulatory News (BOD)

Share Price Information for Botswana Diam (BOD)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.325
Bid: 0.30
Ask: 0.35
Change: 0.00 (0.00%)
Spread: 0.05 (16.667%)
Open: 0.325
High: 0.33
Low: 0.325
Prev. Close: 0.325
BOD Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Update on Thorny River project development

4 Apr 2019 07:00

RNS Number : 0610V
Botswana Diamonds PLC
04 April 2019
 

4th April 2019

Botswana Diamonds PLC

("Botswana Diamonds" or the "Company")

 

Update on Thorny River project development

 

· Bulk sampling (mining) on track to commence in Q2 2019 subject to approvals;

· 33 drill holes completed in the current programme to define the bulk sampling plan;

· Thorny River drill plan concluded with data from a total of 77 holes drilled

· Commissioning of the diamond processing plant which will process the Thorny River kimberlite has been completed.

 

 

Botswana Diamonds ("BOD") the AIM and BSE listed explorer is pleased to announce that the intensification drilling programme has been concluded on the farms Frischgewaagt and Hartbeesfontein which form part of the Thorny River project. The purpose of this drilling programme was to enable detailed planning for a bulk sampling (mining) programme, which will commence after the necessary regulatory approvals have been received; these are expected during the course of Q2 2019.

 

This programme comprised 33 holes and 1,282 meters of drilling which, together with previous work, has resulted in a total drilled depth of 3,299 meters in five areas on the two farms whilst BOD has been active on the property. The intensification drilling programme has allowed further definition of the kimberlite blow/fissure complex and added to data already generated by gravity, magnetic, maxmin and other advanced exploration techniques.

 

A summary of all of the data is provided in the following table by area drilled:

 

 

Holes Drilled

Kimberlite Intersections

Kimberlite Strike Length (m)

Area

Number of holes (m)

Total meters

Average depth (m)

Deepest hole (m)

Shallowest Intersection (m)

Deepest Intersection (m)

Minimum Intersection (m)

Maximum Intersection (m)

1

14

527

38

73

9.3

48

0.2

4.2

720

2

15

539

38

60

9.5

36.5

0.7

4.0

1100

3

20

897

47

79

8

50

0.1

18.0

800

4

21

1033

54

123

4

102

1.0

8.0

780

5

7

303

43

67

24

61

1.3

9.0

500

Total

77

3299

54

123

4

102

0.1

18.0

3900

 

 

The map below details the target areas on the two properties. 

 

Link to Map http://www.rns-pdf.londonstockexchange.com/rns/0610V_1-2019-4-3.pdf

 

A bulk sampling target of 3.9 km of linear kimberlite fissure intersection has been identified from the results with intersections of up to 18 meters from 4 meters below surface. Areas hosting possible blows have also been identified, and these will form part of the bulk sampling (mining) area, which is adjacent to that from which a bulk sample was taken in early 2018 (which indicated diamond values of US$120 - US$220 / carat and grades of 46 - 74 carats per hundred tonnes (or in-situ value of US$55 - US$160 / tonne)).

 

Following refurbishment, wet commissioning has been concluded on a nearby kimberlite treatment facility where the bulk samples will be processed.

 

Early stage work is also progressing on potential secondary (alluvial) diamond deposits in the project area, with a number of targets being identified. The nearby and worked-out Marsfontein diamond mine was host to eluvial diamond deposits running at grades of 1,433 cpht.

 

 

This release has been approved by James Campbell, Managing Director of Botswana Diamonds plc, a qualified geologist (Pr.Sci.Nat), a Fellow of the Southern African Institute of Mining and Metallurgy, a Fellow of the Institute of Materials, Metals and Mining (UK) and with over 33-years' experience in the diamond sector. 

 

This announcement contains inside information for the purposes of Article 7 of Regulation (EU) 596/2014. The person who arranged for the release of this announcement on behalf of the Company was James Campbell, Director

 

A copy of this announcement is available on the Company's website, at www.botswanadiamonds.co.uk

ENDS

Enquiries:

Botswana Diamonds PLC John Teeling, Chairman

James Campbell, Managing Director

Jim Finn, Director

 

 

+353 1 833 2833

+27 83 457 3724

+353 1 833 2833

Beaumont Cornish - Nominated Adviser Michael Cornish

Roland Cornish

 

+44 (0) 020 7628 3396

SVS Securities Plc - Broker Tom Curran

Ben Tadd

 

+44 (0) 20 3700 0100

 

Blytheweigh - PRJulia TilleyFergus Cowan

+44 (0) 20 7138 3206

+44 (0) 207 138 3553

+44 (0) 207 138 3208

Teneo

Luke Hogg

Alan Tyrrell

 

+353 (0) 1 661 4055

+353 (0) 1 661 4055

 

Glossary

 

Kimberlite: Also called blue ground, a dark-coloured, heavy, often altered and brecciated (fragmented), intrusive igneous rock that contains diamonds in its rock matrix.

 

Kimberlite Blow: Some kimberlite dykes are observed to expand along strike into lenticular features 10-20 times the dyke width and up to 100 m in length; these are termed "blows" and may represent the lowermost portions of root zone intrusions.

 

Wet Commissioning: Means water or a solvent has been introduced into the system and sub-systems.

 

CPHT: Carats per hundred tons.

 

www.botswanadiamonds.co.uk

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLIJMRTMBBMBTL
Date   Source Headline
8th Oct 202111:00 amRNSPrice Monitoring Extension
8th Oct 20219:05 amRNSSecond Price Monitoring Extn
8th Oct 20219:00 amRNSPrice Monitoring Extension
6th Oct 202111:00 amRNSPrice Monitoring Extension
5th Oct 20212:00 pmRNSPrice Monitoring Extension
4th Oct 20217:00 amRNSSunland Minerals’ Prospecting Licences renewed
29th Sep 20217:00 amRNSAcquisition of control of the Thorny River Project
21st Sep 20217:00 amRNSThick kimberlite intersections on Thorny River
1st Sep 20217:00 amRNSDrilling commences on Thorny River
23rd Aug 20217:00 amRNSJV acquisition of Ghaghoo diamond mine in Botswana
10th Aug 20217:00 amRNSDiamonds recovered from River Kimberlite Extension
3rd Aug 202112:00 pmRNSUpdate on Treatment of Thorny River drill samples
10th Jun 20217:00 amRNSThorny River advances towards resource assessment
28th May 20212:51 pmRNSTotal Voting Rights
13th May 20214:12 pmRNSExercise of Warrants
5th May 202111:06 amRNSSecond Price Monitoring Extn
5th May 202111:00 amRNSPrice Monitoring Extension
5th May 20217:00 amRNSDiscovery of New, Kimberlite Blow at Thorny River
15th Apr 20217:00 amRNSSecond stage drilling campaign at Thorny River
29th Mar 20217:00 amRNSUnaudited Interim Statement and Financial Results
22nd Mar 20217:00 amRNSDiamonds recovered from Thorny River
26th Feb 20213:33 pmRNSTotal Voting Rights
16th Feb 20217:00 amRNSAgreement to fast-track diamond exploration
8th Feb 20214:40 pmRNSSecond Price Monitoring Extn
8th Feb 20214:36 pmRNSPrice Monitoring Extension
28th Jan 202111:55 amRNSResults of AGM
22nd Jan 20217:00 amRNSPlacing to raise £363,000
16th Dec 20207:00 amRNSModel of Kimberlite Pipe at Thorny River
14th Dec 20207:00 amRNSAnnual Results for the Year Ended 30 June 2020
2nd Dec 20207:00 amRNSKimberlite pipe discovered at Thorny River
30th Nov 20207:00 amRNSAcquisition of Sekaka Diamonds completed
25th Nov 20202:06 pmRNSSecond Price Monitoring Extn
25th Nov 20202:00 pmRNSPrice Monitoring Extension
18th Nov 20207:00 amRNSDrilling commences on Thorny River and Marsfontein
16th Nov 20207:00 amRNSAcquisition of Sekaka Diamonds
9th Nov 20207:00 amRNSMarsfontein and Thorny River Exploration Update
12th Oct 20207:00 amRNSPrecision geophysics to zero-in on drill targets
30th Sep 20205:00 pmRNSTotal Voting Rights
25th Sep 202010:00 amRNSAppointment of Joint Broker
15th Sep 20207:00 amRNSKimberlite Intersection from Marsfontein Drilling
7th Sep 20207:00 amRNSPlacing to raise GBP £300,000
20th Jul 20207:00 amRNSAcquisition of KX36 Diamond Discovery in Botswana
12th Jun 20204:49 pmRNSExercise of Warrants
29th May 20207:00 amRNSMacro diamonds recovered from Marsfontein sample
1st Apr 20207:00 amRNSNew Prospecting Licenses awarded in Botswana
30th Mar 20202:06 pmRNSSecond Price Monitoring Extn
30th Mar 20202:01 pmRNSPrice Monitoring Extension
30th Mar 202011:05 amRNSSecond Price Monitoring Extn
30th Mar 202011:00 amRNSPrice Monitoring Extension
30th Mar 20209:05 amRNSSecond Price Monitoring Extn

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.