Gordon Stein, CFO of CleanTech Lithium, explains why CTL acquired the 23 Laguna Verde licenses. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBotswana Diam Regulatory News (BOD)

Share Price Information for Botswana Diam (BOD)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.325
Bid: 0.30
Ask: 0.35
Change: 0.00 (0.00%)
Spread: 0.05 (16.667%)
Open: 0.325
High: 0.325
Low: 0.325
Prev. Close: 0.325
BOD Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Update on Thorny River project development

4 Apr 2019 07:00

RNS Number : 0610V
Botswana Diamonds PLC
04 April 2019
 

4th April 2019

Botswana Diamonds PLC

("Botswana Diamonds" or the "Company")

 

Update on Thorny River project development

 

· Bulk sampling (mining) on track to commence in Q2 2019 subject to approvals;

· 33 drill holes completed in the current programme to define the bulk sampling plan;

· Thorny River drill plan concluded with data from a total of 77 holes drilled

· Commissioning of the diamond processing plant which will process the Thorny River kimberlite has been completed.

 

 

Botswana Diamonds ("BOD") the AIM and BSE listed explorer is pleased to announce that the intensification drilling programme has been concluded on the farms Frischgewaagt and Hartbeesfontein which form part of the Thorny River project. The purpose of this drilling programme was to enable detailed planning for a bulk sampling (mining) programme, which will commence after the necessary regulatory approvals have been received; these are expected during the course of Q2 2019.

 

This programme comprised 33 holes and 1,282 meters of drilling which, together with previous work, has resulted in a total drilled depth of 3,299 meters in five areas on the two farms whilst BOD has been active on the property. The intensification drilling programme has allowed further definition of the kimberlite blow/fissure complex and added to data already generated by gravity, magnetic, maxmin and other advanced exploration techniques.

 

A summary of all of the data is provided in the following table by area drilled:

 

 

Holes Drilled

Kimberlite Intersections

Kimberlite Strike Length (m)

Area

Number of holes (m)

Total meters

Average depth (m)

Deepest hole (m)

Shallowest Intersection (m)

Deepest Intersection (m)

Minimum Intersection (m)

Maximum Intersection (m)

1

14

527

38

73

9.3

48

0.2

4.2

720

2

15

539

38

60

9.5

36.5

0.7

4.0

1100

3

20

897

47

79

8

50

0.1

18.0

800

4

21

1033

54

123

4

102

1.0

8.0

780

5

7

303

43

67

24

61

1.3

9.0

500

Total

77

3299

54

123

4

102

0.1

18.0

3900

 

 

The map below details the target areas on the two properties. 

 

Link to Map http://www.rns-pdf.londonstockexchange.com/rns/0610V_1-2019-4-3.pdf

 

A bulk sampling target of 3.9 km of linear kimberlite fissure intersection has been identified from the results with intersections of up to 18 meters from 4 meters below surface. Areas hosting possible blows have also been identified, and these will form part of the bulk sampling (mining) area, which is adjacent to that from which a bulk sample was taken in early 2018 (which indicated diamond values of US$120 - US$220 / carat and grades of 46 - 74 carats per hundred tonnes (or in-situ value of US$55 - US$160 / tonne)).

 

Following refurbishment, wet commissioning has been concluded on a nearby kimberlite treatment facility where the bulk samples will be processed.

 

Early stage work is also progressing on potential secondary (alluvial) diamond deposits in the project area, with a number of targets being identified. The nearby and worked-out Marsfontein diamond mine was host to eluvial diamond deposits running at grades of 1,433 cpht.

 

 

This release has been approved by James Campbell, Managing Director of Botswana Diamonds plc, a qualified geologist (Pr.Sci.Nat), a Fellow of the Southern African Institute of Mining and Metallurgy, a Fellow of the Institute of Materials, Metals and Mining (UK) and with over 33-years' experience in the diamond sector. 

 

This announcement contains inside information for the purposes of Article 7 of Regulation (EU) 596/2014. The person who arranged for the release of this announcement on behalf of the Company was James Campbell, Director

 

A copy of this announcement is available on the Company's website, at www.botswanadiamonds.co.uk

ENDS

Enquiries:

Botswana Diamonds PLC John Teeling, Chairman

James Campbell, Managing Director

Jim Finn, Director

 

 

+353 1 833 2833

+27 83 457 3724

+353 1 833 2833

Beaumont Cornish - Nominated Adviser Michael Cornish

Roland Cornish

 

+44 (0) 020 7628 3396

SVS Securities Plc - Broker Tom Curran

Ben Tadd

 

+44 (0) 20 3700 0100

 

Blytheweigh - PRJulia TilleyFergus Cowan

+44 (0) 20 7138 3206

+44 (0) 207 138 3553

+44 (0) 207 138 3208

Teneo

Luke Hogg

Alan Tyrrell

 

+353 (0) 1 661 4055

+353 (0) 1 661 4055

 

Glossary

 

Kimberlite: Also called blue ground, a dark-coloured, heavy, often altered and brecciated (fragmented), intrusive igneous rock that contains diamonds in its rock matrix.

 

Kimberlite Blow: Some kimberlite dykes are observed to expand along strike into lenticular features 10-20 times the dyke width and up to 100 m in length; these are termed "blows" and may represent the lowermost portions of root zone intrusions.

 

Wet Commissioning: Means water or a solvent has been introduced into the system and sub-systems.

 

CPHT: Carats per hundred tons.

 

www.botswanadiamonds.co.uk

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLIJMRTMBBMBTL
Date   Source Headline
11th Apr 20247:00 amRNSSecond significant anomaly discovered in Kalahari
9th Apr 20247:00 amRNSAI to be applied to our Botswana database
25th Mar 20247:00 amRNSUnaudited Interim Statement and Financial Results
31st Jan 20247:00 amRNSGranting of Prospecting License in Eswatini
24th Jan 20241:50 pmRNSResults of Annual General Meeting
23rd Jan 20247:00 amRNSHigh Grade Anomaly Discovered Near KX36 Project
20th Dec 20237:00 amRNSAnnual Results for the Year Ended 30 June 2023
8th Dec 20237:00 amRNSFour anomalies identified close to KX36 project
27th Nov 202311:15 amRNS£380,000 Fundraising
27th Sep 20237:00 amRNSAppointment of Nominated and Financial Adviser
13th Sep 20237:00 amRNSMarsfontein Update
3rd Aug 20237:00 amRNSMarsfontein Production Update
29th Mar 20237:00 amRNSUnaudited Interim Statement and Financial Results
2nd Mar 202310:15 amRNSMarsfontein Update
20th Feb 20234:35 pmRNSPrice Monitoring Extension
3rd Feb 20234:40 pmRNSSecond Price Monitoring Extn
3rd Feb 20234:35 pmRNSPrice Monitoring Extension
2nd Feb 202311:00 amRNSTotal Voting Rights
27th Jan 20237:00 amRNSIssue of equity
19th Jan 202312:30 pmRNSUpdate on Activities & Results of AGM
8th Dec 20227:00 amRNSAnnual Results for the Year Ended 30 June 2022
21st Oct 20227:00 amRNSData licence agreement signed with Petra Diamonds
6th Oct 20224:44 pmRNSExercise of Warrants
28th Sep 20227:00 amRNSCompletion of acquisition of Thorny River Project
8th Sep 20227:00 amRNSExercise of Warrants
5th Sep 20228:33 amRNSBotswana awarded Licence over Kimberlite Cluster
4th Aug 20227:00 amRNSAdditional Kimberlite Discovered at Thorny River
20th Jul 20227:00 amRNSAcquisition of Maibwe
18th Jul 20227:00 amRNSDrilling commences on Thorny River
4th Jul 20224:43 pmRNSExercise of Warrants
19th May 20227:00 amRNSAnomalies indicative of kimberlite pipes
11th May 20227:00 amRNSGhaghoo mine update
4th May 20227:00 amRNSLargest anomaly discovery to date on Thorny River
25th Apr 20227:00 amRNSThorny River Open Pit Mining Evaluation
21st Apr 202212:21 pmRNSStandard form for notification of major holdings
31st Mar 20227:00 amRNSUnaudited Interim Statement and Financial Results
29th Mar 202211:05 amRNSSecond Price Monitoring Extn
29th Mar 202211:00 amRNSPrice Monitoring Extension
1st Feb 20227:00 amRNSUpdate on JV acquisition of Ghaghoo Diamond Mine
27th Jan 20221:12 pmRNSResults of AGM
20th Jan 20223:21 pmRNSExercise of Warrants
12th Jan 20227:00 amRNSPreliminary kimberlite assessment completed
7th Jan 20224:41 pmRNSSecond Price Monitoring Extn
7th Jan 20224:36 pmRNSPrice Monitoring Extension
4th Jan 20227:00 amRNSTotal Voting Rights
6th Dec 20217:00 amRNSAnnual Results for the Year Ended 30 June 2021
3rd Dec 202110:28 amRNSExercise of Warrants
30th Nov 202111:37 amRNSStandard form for notification of major holdings
25th Oct 20217:00 amRNSPlacing to raise £550,000
8th Oct 202111:06 amRNSSecond Price Monitoring Extn

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.