Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBotswana Diam Regulatory News (BOD)

Share Price Information for Botswana Diam (BOD)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.325
Bid: 0.30
Ask: 0.35
Change: 0.00 (0.00%)
Spread: 0.05 (16.667%)
Open: 0.325
High: 0.33
Low: 0.325
Prev. Close: 0.325
BOD Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Update on Thorny River project development

4 Apr 2019 07:00

RNS Number : 0610V
Botswana Diamonds PLC
04 April 2019
 

4th April 2019

Botswana Diamonds PLC

("Botswana Diamonds" or the "Company")

 

Update on Thorny River project development

 

· Bulk sampling (mining) on track to commence in Q2 2019 subject to approvals;

· 33 drill holes completed in the current programme to define the bulk sampling plan;

· Thorny River drill plan concluded with data from a total of 77 holes drilled

· Commissioning of the diamond processing plant which will process the Thorny River kimberlite has been completed.

 

 

Botswana Diamonds ("BOD") the AIM and BSE listed explorer is pleased to announce that the intensification drilling programme has been concluded on the farms Frischgewaagt and Hartbeesfontein which form part of the Thorny River project. The purpose of this drilling programme was to enable detailed planning for a bulk sampling (mining) programme, which will commence after the necessary regulatory approvals have been received; these are expected during the course of Q2 2019.

 

This programme comprised 33 holes and 1,282 meters of drilling which, together with previous work, has resulted in a total drilled depth of 3,299 meters in five areas on the two farms whilst BOD has been active on the property. The intensification drilling programme has allowed further definition of the kimberlite blow/fissure complex and added to data already generated by gravity, magnetic, maxmin and other advanced exploration techniques.

 

A summary of all of the data is provided in the following table by area drilled:

 

 

Holes Drilled

Kimberlite Intersections

Kimberlite Strike Length (m)

Area

Number of holes (m)

Total meters

Average depth (m)

Deepest hole (m)

Shallowest Intersection (m)

Deepest Intersection (m)

Minimum Intersection (m)

Maximum Intersection (m)

1

14

527

38

73

9.3

48

0.2

4.2

720

2

15

539

38

60

9.5

36.5

0.7

4.0

1100

3

20

897

47

79

8

50

0.1

18.0

800

4

21

1033

54

123

4

102

1.0

8.0

780

5

7

303

43

67

24

61

1.3

9.0

500

Total

77

3299

54

123

4

102

0.1

18.0

3900

 

 

The map below details the target areas on the two properties. 

 

Link to Map http://www.rns-pdf.londonstockexchange.com/rns/0610V_1-2019-4-3.pdf

 

A bulk sampling target of 3.9 km of linear kimberlite fissure intersection has been identified from the results with intersections of up to 18 meters from 4 meters below surface. Areas hosting possible blows have also been identified, and these will form part of the bulk sampling (mining) area, which is adjacent to that from which a bulk sample was taken in early 2018 (which indicated diamond values of US$120 - US$220 / carat and grades of 46 - 74 carats per hundred tonnes (or in-situ value of US$55 - US$160 / tonne)).

 

Following refurbishment, wet commissioning has been concluded on a nearby kimberlite treatment facility where the bulk samples will be processed.

 

Early stage work is also progressing on potential secondary (alluvial) diamond deposits in the project area, with a number of targets being identified. The nearby and worked-out Marsfontein diamond mine was host to eluvial diamond deposits running at grades of 1,433 cpht.

 

 

This release has been approved by James Campbell, Managing Director of Botswana Diamonds plc, a qualified geologist (Pr.Sci.Nat), a Fellow of the Southern African Institute of Mining and Metallurgy, a Fellow of the Institute of Materials, Metals and Mining (UK) and with over 33-years' experience in the diamond sector. 

 

This announcement contains inside information for the purposes of Article 7 of Regulation (EU) 596/2014. The person who arranged for the release of this announcement on behalf of the Company was James Campbell, Director

 

A copy of this announcement is available on the Company's website, at www.botswanadiamonds.co.uk

ENDS

Enquiries:

Botswana Diamonds PLC John Teeling, Chairman

James Campbell, Managing Director

Jim Finn, Director

 

 

+353 1 833 2833

+27 83 457 3724

+353 1 833 2833

Beaumont Cornish - Nominated Adviser Michael Cornish

Roland Cornish

 

+44 (0) 020 7628 3396

SVS Securities Plc - Broker Tom Curran

Ben Tadd

 

+44 (0) 20 3700 0100

 

Blytheweigh - PRJulia TilleyFergus Cowan

+44 (0) 20 7138 3206

+44 (0) 207 138 3553

+44 (0) 207 138 3208

Teneo

Luke Hogg

Alan Tyrrell

 

+353 (0) 1 661 4055

+353 (0) 1 661 4055

 

Glossary

 

Kimberlite: Also called blue ground, a dark-coloured, heavy, often altered and brecciated (fragmented), intrusive igneous rock that contains diamonds in its rock matrix.

 

Kimberlite Blow: Some kimberlite dykes are observed to expand along strike into lenticular features 10-20 times the dyke width and up to 100 m in length; these are termed "blows" and may represent the lowermost portions of root zone intrusions.

 

Wet Commissioning: Means water or a solvent has been introduced into the system and sub-systems.

 

CPHT: Carats per hundred tons.

 

www.botswanadiamonds.co.uk

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLIJMRTMBBMBTL
Date   Source Headline
30th Mar 20209:00 amRNSPrice Monitoring Extension
25th Mar 202010:56 amRNSInterim Statement and Financial Results
18th Mar 20207:00 amRNSBulk sampling to commence on Marsfontein
2nd Mar 20205:01 pmRNSTotal Voting Rights
24th Feb 202012:27 pmRNSKimberlite intersected on Marsfontein
11th Feb 20201:13 pmRNSDrilling on Thorny River & Marsfontein Concessions
5th Feb 20202:51 pmRNSAppointment of Joint Broker
28th Jan 20207:00 amRNSPlacing to raise £250,000
12th Dec 201912:30 pmRNSResult of AGM
29th Nov 20194:54 pmRNSTotal Voting Rights
28th Nov 20197:00 amRNSZimbabwe Update
18th Nov 20194:49 pmRNSExercise of Warrants
15th Nov 20197:00 amRNSAnnual Results for the Year Ended 30 June 2019
12th Nov 201911:18 amRNSFirst diamonds recovered from Marsfontein Permit
28th Oct 20197:00 amRNSMarsfontein Mining Permit Granted
24th Sep 20192:05 pmRNSSecond Price Monitoring Extn
24th Sep 20192:00 pmRNSPrice Monitoring Extension
24th Sep 20197:00 amRNSMarsfontein Mining Contract Signed
12th Sep 20197:00 amRNSEnvironmental Authorisation - Marsfontein Gravels
2nd Sep 20197:00 amRNSKimberlite Pipe Potential at Thorny River
22nd Aug 20197:00 amRNSStrategic Licences Extended in Botswanan Kalahari
5th Aug 20195:04 pmRNSChange of adviser (broker)
1st Aug 20193:30 pmRNSTotal Voting Rights
18th Jul 20199:49 amRNSPlacing to raise £250,000
11th Jun 201910:30 amRNSDiamonds recovered from Thorny River Bulk Sampling
4th Apr 20197:00 amRNSUpdate on Thorny River project development
25th Mar 20197:00 amRNSInterim Results for the 6 Months Ended 31 Dec 18
28th Feb 201910:27 amRNSUpdate on Thorny River project development
18th Feb 201910:12 amRNSIntensification drilling on Thorny River
14th Feb 20192:50 pmRNSMarange Diamond Fields Grant of Right to Mine
23rd Jan 20197:00 amRNSPlacing to raise £370,000
3rd Jan 20197:00 amRNSChange of Nominated Adviser
14th Dec 20183:31 pmRNSVast Resources plc - Marange Diamond Field
14th Dec 201812:45 pmRNSBotswana Diamonds PLC - Results of AGM
28th Nov 20183:25 pmRNSHolding(s) in Company
19th Nov 20187:00 amRNSAnnual Results for the Year Ended 30 June 2018
15th Nov 20187:00 amRNSUpdate on Sunland Minerals JV
7th Nov 20187:00 amRNSAdvancements Towards Diamond Production
30th Oct 20183:33 pmRNSHolding in Company
17th Oct 20187:00 amRNSInitial assessment of the T1A Marange concession
4th Oct 20187:38 amRNSDiamond Concession Development Agreement Reached
25th Sep 20187:00 amRNSFree State Kimberlite Exploration Project Update
23rd Aug 20189:30 amRNSAccess Awarded for Diamond Concession in Zimbabwe
31st Jul 20187:00 amRNSUpdate on South African Exploration Projects
11th Jul 20189:20 amRNSKalahari Desert Exploration Update
6th Jun 20187:00 amRNSUpdate on South African Exploration Projects
1st May 20187:00 amRNSMoU for Exploitation of Diamonds in Zimbabwe
21st Mar 20187:00 amRNSInterim Results for the 6 Months Ended 31 Dec 17
13th Mar 20187:00 amRNSDrilling commenced on Ontevreden Kimberlite Pipe
15th Feb 20187:00 amRNSThorny River Project - Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.