Ben Richardson, CEO at SulNOx, confident they can cost-effectively decarbonise commercial shipping. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBotswana Diam Regulatory News (BOD)

Share Price Information for Botswana Diam (BOD)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.35
Bid: 0.30
Ask: 0.40
Change: 0.00 (0.00%)
Spread: 0.10 (33.333%)
Open: 0.35
High: 0.35
Low: 0.35
Prev. Close: 0.35
BOD Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Thorny River Project - Update

15 Feb 2018 07:00

RNS Number : 9291E
Botswana Diamonds PLC
15 February 2018
 

15th February 2018

Botswana Diamonds PLC

 

("Botswana Diamonds" or the "Company")

 

Thorny River Project - Update

 

Highlights:

 

· Further analysis of the work completed to date has led to an updated estimate of the diamond value range of US$120-US$220 per carat.

· The estimated diamond grade range remains at 46-74cpht.

· The estimated volume range remains at 1.2 -2.1 million tonnes of kimberlite.

 

The Board of Botswana Diamonds (AIM: BOD) is pleased to announce that a Scoping Study has commenced to determine the potential commerciality of the Thorny River Diamond Project.

 

The study will further refine the volumes of diamonds in-situ, the grade and the value per tonne of ore. A critical aspect will be to evaluate the processing and mining options. This work is expected to take up to six months.

 

John Teeling, chairman, commented:

"We are satisfied that we now have a better understanding of the geology and metrics of the Thorny River deposit. What is emerging is a project with similar metrics to the neighbouring Klipspringer Mine. We are now undertaking a detailed study to refine our processing, geological and commercial parameters."

 

Further Detail:

The Thorny River Project is a consolidation of the Frischgewaagt, Hartbeesfontein and Doornrivier properties into a 2,771 hectare area in the Limpopo Province of South Africa. It comprises the eastern extension of the kimberlite dyke/pipe systems on which the Klipspringer & Marsfontein Mines are located, both of which have been economically mined.

 

Extensive drilling, geophysics and sampling work has been undertaken at Thorny River during the last twelve months. Initial results from this fieldwork were announced on 25th January 2018, and further analysis of these results has since been carried out.

 

Following this analysis, the results, which are based on the Company's internal models and forecasts, are summarised below:

 

· Value (updated): Modelled diamond value range of US$120 / carat - US$220 / carat.

· Value/tonne (updated): In-situ value of US$55 - US$160 / tonne.

· Volume (unchanged): Estimated 1.2 million - 2.1 million tonnes of kimberlite to a depth of 100m.

· Grade (unchanged): Modelled in-situ grade range of 46 carats per hundred tonnes (cpht) - 74cpht.

 

The above result compares favourably with the published Indicated Resource grade of the neighbouring Klipspringer Mine of 49 carats per hundred tonnes and diamond value of US$130 / carat (2010 value), and value per tonne of US$64 / tonne.

 

The Klipspringer Mine is in the process being acquired by Greenhurst Mining.

 

 

This release has been approved by James Campbell, Managing Director of Botswana Diamonds plc, a qualified geologist (Pr.Sci.Nat), a Fellow of the South African Institute of Mining and Metallurgy, a Fellow of the Institute of Materials, Minerals and Mining with over 32-years' experience in the diamond sector.

 

 

This announcement contains inside information for the purposes of Article 7 of Regulation (EU) 596/2014.

 

ENDS

 

 

Enquiries:

 

Botswana Diamonds PLC

John Teeling, Chairman

+353 1 833 2833

James Campbell, Managing Director

+27 83 457 3724

Jim Finn, Director

Northland Capital Partners Limited

David Hignell/Gerry Beaney (Corporate Finance)

+44 (0) 203 861 6625

John Howes (Broking)

SVS Securities Plc

+44 (0) 203 700 0100

Tom Curran

Ben Tadd

Blytheweigh

+44 (0) 207 138 3204

Camilla Horsfall

+44 (0) 781 784 1793

Nick Elwes

+44 (0) 783 185 1855

Teneo PSG

Luke Hogg

+353 (0) 1 661 4055

Alan Tyrrell

+353 (0) 1 661 4055

 

www.botswanadiamonds.co.uk

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
UPDBRGDDSDBBGIS
Date   Source Headline
14th Feb 20187:00 amRNSPlacing to raise £500,000
13th Feb 20189:56 amRNSBotswana Exploration Programme Starts
25th Jan 20189:05 amRNSSecond Price Monitoring Extn
25th Jan 20189:00 amRNSPrice Monitoring Extension
25th Jan 20187:00 amRNSThorny River Project - Grade & Volume update
20th Dec 20172:05 pmRNSExercise of Warrants
30th Nov 20171:54 pmRNSResults of AGM
17th Nov 20177:00 amRNSFree State Project - Update
26th Oct 20177:00 amRNSPreliminary Results for the Year Ended 30 June 17
24th Oct 20177:00 amRNSFree State Project - Eight Kimberlites Discovered
4th Oct 20173:59 pmRNSThorny River - Additional Holes to be Drilled
29th Sep 20177:00 amRNSUpdate on New Kimberlite Discovery
12th Sep 20177:00 amRNSVutomi Joint Venture - Exploration Update
3rd Aug 20177:15 amRNS£868,000 Fundraising Update
3rd Aug 20177:00 amRNS£868,000 Fundraising
17th Jul 20179:39 amRNSNew Licence Acquired on the Vutomi Joint Venture
14th Jul 20177:00 amRNSKimberlite Discovered on Vutomi Licence
11th Jul 20177:00 amRNSUpdate on the Vutomi Joint Venture in South Africa
13th Jun 201711:51 amRNSDiamond grade estimated to be between 20-270 cpht
11th May 201712:26 pmRNSExercise of Warrants
25th Apr 20177:00 amRNSNew Prospecting Applications approved in Botswana
6th Apr 20177:00 amRNSFirst Drilling Completed at Vutomi Project
3rd Apr 20173:06 pmRNSIssue of Shares to Vutomi
27th Mar 20177:00 amRNSInterim Results
13th Mar 20172:55 pmRNSExercise of Warrants
27th Feb 20177:00 amRNSPlacing to Fund Drilling
6th Feb 20177:00 amRNSVutomi Option & Earn-In Agreement
15th Dec 201610:51 amRNSResult of AGM
1st Dec 20167:00 amRNSJames Campbell appointed Managing Director
18th Nov 20167:00 amRNSPreliminary Results for Year Ended 30 June 2016
15th Nov 20167:00 amRNSDrilling and Analysis Update on Orapa and Gope
25th Oct 201611:06 amRNSUpdate on PL 260 in Orapa
20th Oct 20167:00 amRNSKalahari Desert Drilling Starts
18th Oct 20167:00 amRNSDrilling on AK 22 Commences
9th Sep 20167:00 amRNSExploration Update for Alrosa Joint Venture
28th Jun 201610:20 amRNSExercise of Warrants
15th Jun 20165:37 pmRNSExercise of Warrants
9th May 201612:19 pmRNSUpdate - Maibwe Diamonds (Brightstone)
6th May 20167:00 amRNSPlacing to raise £500,000
21st Apr 201611:03 amRNSUpdate on Exploration in Botswana
6th Apr 201611:06 amRNSDrill Programme Begins
24th Mar 20167:00 amRNSInterim Results
23rd Mar 20167:00 amRNSExploration Begins in Orapa
2nd Mar 20167:00 amRNSBotswana Exploration Programme for 2016
5th Jan 20163:36 pmRNSTotal Voting Rights
22nd Dec 20154:22 pmRNSFundraising and Capital Reorganisation
18th Dec 20151:17 pmRNSResult of AGM
18th Dec 20157:00 amRNSFundraising
19th Nov 20157:00 amRNSPreliminary Results for Year Ended 30 June 2015
9th Oct 20157:00 amRNSNew Prospecting Licence awarded in Orapa

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.