We would love to hear your thoughts about our site and services, please take our survey here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBotswana Diam Regulatory News (BOD)

Share Price Information for Botswana Diam (BOD)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.35
Bid: 0.30
Ask: 0.40
Change: 0.00 (0.00%)
Spread: 0.10 (33.333%)
Open: 0.35
High: 0.35
Low: 0.35
Prev. Close: 0.35
BOD Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Thorny River Project - Update

15 Feb 2018 07:00

RNS Number : 9291E
Botswana Diamonds PLC
15 February 2018
 

15th February 2018

Botswana Diamonds PLC

 

("Botswana Diamonds" or the "Company")

 

Thorny River Project - Update

 

Highlights:

 

· Further analysis of the work completed to date has led to an updated estimate of the diamond value range of US$120-US$220 per carat.

· The estimated diamond grade range remains at 46-74cpht.

· The estimated volume range remains at 1.2 -2.1 million tonnes of kimberlite.

 

The Board of Botswana Diamonds (AIM: BOD) is pleased to announce that a Scoping Study has commenced to determine the potential commerciality of the Thorny River Diamond Project.

 

The study will further refine the volumes of diamonds in-situ, the grade and the value per tonne of ore. A critical aspect will be to evaluate the processing and mining options. This work is expected to take up to six months.

 

John Teeling, chairman, commented:

"We are satisfied that we now have a better understanding of the geology and metrics of the Thorny River deposit. What is emerging is a project with similar metrics to the neighbouring Klipspringer Mine. We are now undertaking a detailed study to refine our processing, geological and commercial parameters."

 

Further Detail:

The Thorny River Project is a consolidation of the Frischgewaagt, Hartbeesfontein and Doornrivier properties into a 2,771 hectare area in the Limpopo Province of South Africa. It comprises the eastern extension of the kimberlite dyke/pipe systems on which the Klipspringer & Marsfontein Mines are located, both of which have been economically mined.

 

Extensive drilling, geophysics and sampling work has been undertaken at Thorny River during the last twelve months. Initial results from this fieldwork were announced on 25th January 2018, and further analysis of these results has since been carried out.

 

Following this analysis, the results, which are based on the Company's internal models and forecasts, are summarised below:

 

· Value (updated): Modelled diamond value range of US$120 / carat - US$220 / carat.

· Value/tonne (updated): In-situ value of US$55 - US$160 / tonne.

· Volume (unchanged): Estimated 1.2 million - 2.1 million tonnes of kimberlite to a depth of 100m.

· Grade (unchanged): Modelled in-situ grade range of 46 carats per hundred tonnes (cpht) - 74cpht.

 

The above result compares favourably with the published Indicated Resource grade of the neighbouring Klipspringer Mine of 49 carats per hundred tonnes and diamond value of US$130 / carat (2010 value), and value per tonne of US$64 / tonne.

 

The Klipspringer Mine is in the process being acquired by Greenhurst Mining.

 

 

This release has been approved by James Campbell, Managing Director of Botswana Diamonds plc, a qualified geologist (Pr.Sci.Nat), a Fellow of the South African Institute of Mining and Metallurgy, a Fellow of the Institute of Materials, Minerals and Mining with over 32-years' experience in the diamond sector.

 

 

This announcement contains inside information for the purposes of Article 7 of Regulation (EU) 596/2014.

 

ENDS

 

 

Enquiries:

 

Botswana Diamonds PLC

John Teeling, Chairman

+353 1 833 2833

James Campbell, Managing Director

+27 83 457 3724

Jim Finn, Director

Northland Capital Partners Limited

David Hignell/Gerry Beaney (Corporate Finance)

+44 (0) 203 861 6625

John Howes (Broking)

SVS Securities Plc

+44 (0) 203 700 0100

Tom Curran

Ben Tadd

Blytheweigh

+44 (0) 207 138 3204

Camilla Horsfall

+44 (0) 781 784 1793

Nick Elwes

+44 (0) 783 185 1855

Teneo PSG

Luke Hogg

+353 (0) 1 661 4055

Alan Tyrrell

+353 (0) 1 661 4055

 

www.botswanadiamonds.co.uk

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
UPDBRGDDSDBBGIS
Date   Source Headline
30th Mar 20209:00 amRNSPrice Monitoring Extension
25th Mar 202010:56 amRNSInterim Statement and Financial Results
18th Mar 20207:00 amRNSBulk sampling to commence on Marsfontein
2nd Mar 20205:01 pmRNSTotal Voting Rights
24th Feb 202012:27 pmRNSKimberlite intersected on Marsfontein
11th Feb 20201:13 pmRNSDrilling on Thorny River & Marsfontein Concessions
5th Feb 20202:51 pmRNSAppointment of Joint Broker
28th Jan 20207:00 amRNSPlacing to raise £250,000
12th Dec 201912:30 pmRNSResult of AGM
29th Nov 20194:54 pmRNSTotal Voting Rights
28th Nov 20197:00 amRNSZimbabwe Update
18th Nov 20194:49 pmRNSExercise of Warrants
15th Nov 20197:00 amRNSAnnual Results for the Year Ended 30 June 2019
12th Nov 201911:18 amRNSFirst diamonds recovered from Marsfontein Permit
28th Oct 20197:00 amRNSMarsfontein Mining Permit Granted
24th Sep 20192:05 pmRNSSecond Price Monitoring Extn
24th Sep 20192:00 pmRNSPrice Monitoring Extension
24th Sep 20197:00 amRNSMarsfontein Mining Contract Signed
12th Sep 20197:00 amRNSEnvironmental Authorisation - Marsfontein Gravels
2nd Sep 20197:00 amRNSKimberlite Pipe Potential at Thorny River
22nd Aug 20197:00 amRNSStrategic Licences Extended in Botswanan Kalahari
5th Aug 20195:04 pmRNSChange of adviser (broker)
1st Aug 20193:30 pmRNSTotal Voting Rights
18th Jul 20199:49 amRNSPlacing to raise £250,000
11th Jun 201910:30 amRNSDiamonds recovered from Thorny River Bulk Sampling
4th Apr 20197:00 amRNSUpdate on Thorny River project development
25th Mar 20197:00 amRNSInterim Results for the 6 Months Ended 31 Dec 18
28th Feb 201910:27 amRNSUpdate on Thorny River project development
18th Feb 201910:12 amRNSIntensification drilling on Thorny River
14th Feb 20192:50 pmRNSMarange Diamond Fields Grant of Right to Mine
23rd Jan 20197:00 amRNSPlacing to raise £370,000
3rd Jan 20197:00 amRNSChange of Nominated Adviser
14th Dec 20183:31 pmRNSVast Resources plc - Marange Diamond Field
14th Dec 201812:45 pmRNSBotswana Diamonds PLC - Results of AGM
28th Nov 20183:25 pmRNSHolding(s) in Company
19th Nov 20187:00 amRNSAnnual Results for the Year Ended 30 June 2018
15th Nov 20187:00 amRNSUpdate on Sunland Minerals JV
7th Nov 20187:00 amRNSAdvancements Towards Diamond Production
30th Oct 20183:33 pmRNSHolding in Company
17th Oct 20187:00 amRNSInitial assessment of the T1A Marange concession
4th Oct 20187:38 amRNSDiamond Concession Development Agreement Reached
25th Sep 20187:00 amRNSFree State Kimberlite Exploration Project Update
23rd Aug 20189:30 amRNSAccess Awarded for Diamond Concession in Zimbabwe
31st Jul 20187:00 amRNSUpdate on South African Exploration Projects
11th Jul 20189:20 amRNSKalahari Desert Exploration Update
6th Jun 20187:00 amRNSUpdate on South African Exploration Projects
1st May 20187:00 amRNSMoU for Exploitation of Diamonds in Zimbabwe
21st Mar 20187:00 amRNSInterim Results for the 6 Months Ended 31 Dec 17
13th Mar 20187:00 amRNSDrilling commenced on Ontevreden Kimberlite Pipe
15th Feb 20187:00 amRNSThorny River Project - Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.