Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAnglesey Mining Regulatory News (AYM)

Share Price Information for Anglesey Mining (AYM)

Share Price is delayed by 15 minutes
Get Live Data
5.10    0.00 (0.00%)
Bid:
5.00
Ask:
5.20
Spread: 0.20 (4.00%)
Market Cap: £3.31m
AYM Live PriceLast checked at - London Stock Exchange

Intraday Anglesey Mining Share Chart

Project updates

28 Mar 2012 16:08

Anglesey Mining plc

28 March 2012

Projects Update

Parys drilling continues - now in new area

Labrador receives Houston environmental approval

Anglesey Mining plc (Anglesey) is pleased to present the following update on project activities since the last report on 15 February 2012.

Parys Mountain

The diamond drilling programme to test the continuity of the Engine Zone between a depth of 200 metres and surface has now been successfully completed. The previous programme conducted in 2007 and 2008 had determined the position of the zone between the bottom of the Morris Shaft at some 300 metres deep as far upwards as 200 metres deep.

The first stage of this year's program involved four holes totalling approximately 700 metres of drilling. The first two holes indicated the continuing upward presence of the zone in reasonable widths with significant mineralization at depths between 180 metres and 220 metres. The second two holes at shallower depths indicated continuing presence of the zone but with narrower widths.

As a result of this initial drilling a further short three hole programme was completed to follow the zone through to surface. These holes also located the zone but mineralization was fairly narrow or weakly developed.

The total program of seven holes comprised 860 metres of drilling. Samples from all seven holes have been sent for assay and results are expected within a few weeks.

Geologically it would appear that the Engine Zone is present in mineable widths from the bottom of the Morris Shaft up to around 180 metres deep but is unlikely to be easily mineable at shallower depths. The programme has therefore successfully determined the limits of the Engine Zone, and this will now be incorporated into development planning for possible mining in association with the nearby White Rock Zone.

Following a review of recent geological information and the resulting reassessment of opportunities at the Parys Mountain site, a further series of 2 or 3 holes has been planned. Drilling has commenced on the first of these holes where the target is mineralization of Engine zone type at a depth of 240 to 300 metres. The target is located below the old open pit site below and separated from all previous historical workings in the area about 900 metres away from the Morris Shaft; this area could be accessed by underground drifts from the shaft bottom.

This initial 2 to 3 hole programme is expected to be completed in around 8 weeks' time and assuming satisfactory results could be immediately extended.

Labrador Iron Mines

Today Anglesey's 26% owned associate, Labrador Iron Mines Holdings Limited (LIM), announced that it has received environmental approval and project release from the Government of Newfoundland and Labrador for its Houston iron ore mining project in Western Labrador. On 26 March 2012, the Minister of Environment and Conservation informed LIM that, in accordance with the Environmental Protection Act, the Houston 1 and 2 Deposits Mining Project is released from further environmental assessment, subject to a number of conditions.

LIM Chairman and Chief Executive Officer John Kearney commented, "Receiving Environmental approval from the Government of Newfoundland and Labrador for our Stage 2 Houston Project represents another major step in LIM's development plans. We are pleased that our efforts in planning the proper development of the Houston Project, recognizing the requirements of sound environmental management and social responsibility, and addressing the regulations and policies of the Province of Newfoundland and Labrador, have been acknowledged and accepted by this release and approval".

The Houston deposits are situated in Labrador about 15 km southeast of LIM's currently operating James Mine and Silver Yards Processing Plant and approximately 20 km from Schefferville, QuΒ©bec. The Houston deposits have a combined measured and indicated resource of 22.1 million tonnes at an average grade of 57.3% Fe.

This environmental release of the Houston Project will allow LIM to complete the applications for permits and regulatory approvals required for the construction of mine infrastructure and related facilities to enable the commencement of development and construction at the Houston deposits planned for summer of 2012.

Subject to permitting, it is expected that initial mine development at the Houston deposit, including construction of a haulage road, a railway siding and pre-stripping of the ore will commence in the summer and fall of 2012, leading to commencement of production of ore, including in-pit dry crushing and screening, in the second half of 2013.

Work at the Schefferville site has, as expected, been kept at a minimal level during the winter period. The work level will increase as the winter conditions at both Schefferville and at the port at Sept-Iles relent and activities are expected to accelerate through April and May.

During the winter the major activities have involved ensuring that infrastructure and operational equipment and services, and management and support manning have been put in place so that the target level of production of 2 million tonnes of saleable product during the current year can be readily achieved. This work specifically includes the increase and upgrading of the rail transportation facilities, the completion of the 2012 port agreements and the delivery of key components of the Phase 3 processing facilities at Silver yards and is well advanced and on schedule.

About Labrador Iron Mines Holdings Limited (LIM)

LIM is engaged in the production and development of its 100% owned Schefferville Area direct shipping iron ore (DSO) properties in the Labrador Trough of western Labrador and north-eastern Quebec. LIM commenced production from the James Mine in June 2011, following the successful construction and commissioning of the mine and Silver Yards processing plant earlier in the year, and recorded its first sales of iron ore in the fall of 2011.

LIM contemplates mining in stages. The first phase of Stage 1 comprises the James Mine and the Silver Yard processing plant which is connected by a rail spur to the main Schefferville to Sept-Iles railway. Through a phased expansion program, LIM plans to grow its iron ore production through the subsequent development of adjacent deposits. Stage 2 comprises the development of the Houston deposits which has now completed environmental assessment and is moving to the permitting, development and construction phase.

About Anglesey Mining plc

Anglesey Mining with its LSE main board listing is primarily focused on its 26% interest in Labrador Iron Mines . In addition to any new projects that may be brought forward Anglesey owns 100% of Parys Mountain in North Wales with an historical resource in excess of 7 million tonnes at over 9% combined copper, lead and zinc.

For further information, please contact:

Bill Hooley, Chief Executive +44 (0)1492 541981;

Ian Cuthbertson, Finance Director +44 (0)1248 361333;

Samantha Harrison / Klara Kaczmarek,

Ambrian Partners Limited +44 (0)2076 344700;

Emily Fenton / Jos Simson,

Tavistock Communications +44 (0)20 7920 3155 / +44 (0) 7788 554035.

XLON
Date   Source Headline
18th Jul 20124:22 pmPRNLIM participates in Multi User Port Facility
9th Jul 20121:04 pmPRNLIM - full-scale operations resume - blockade removed
4th Jul 20127:00 amPRNLIM - update on Schefferville situation
20th Jun 20124:40 pmRNSSecond Price Monitoring Extn
20th Jun 20124:35 pmRNSPrice Monitoring Extension
20th Jun 20121:06 pmPRNLIM reports 2012 year end results
14th Jun 20127:00 amPRNLIM commences exploration programme
11th Jun 20127:00 amPRNHolding(s) in Company
1st Jun 20124:40 pmRNSSecond Price Monitoring Extn
1st Jun 20124:35 pmRNSPrice Monitoring Extension
31st May 20122:09 pmPRNNew resource estimates for LIM iron
22nd May 201212:34 pmPRNLIM first iron ore shipment and sale for 2012
4th May 20124:40 pmRNSSecond Price Monitoring Extn
4th May 20124:35 pmRNSPrice Monitoring Extension
3rd May 20124:40 pmRNSSecond Price Monitoring Extn
3rd May 20124:35 pmRNSPrice Monitoring Extension
2nd May 20124:40 pmRNSSecond Price Monitoring Extn
2nd May 20124:35 pmRNSPrice Monitoring Extension
10th Apr 20123:07 pmPRNLIM starts up 2012 production season at James Mine
2nd Apr 201211:55 amPRNBlocklisting - Interim Review
28th Mar 20124:08 pmPRNProject updates
22nd Mar 20123:09 pmPRNDirector’s shareholdings; total voting rights
20th Mar 20122:47 pmPRNLIM completes C$71.6 million equity financing
15th Mar 20127:00 amPRNHolding(s) in Company
13th Mar 20128:20 amPRNHolding(s) in Company
12th Mar 20124:40 pmRNSSecond Price Monitoring Extn
12th Mar 20124:35 pmRNSPrice Monitoring Extension
2nd Mar 201211:45 amPRNHolding(s) in Company
29th Feb 20123:36 pmPRNLIM equity financing for C$71.6 million
29th Feb 20127:44 amPRNLIM announces equity financing
24th Feb 20122:24 pmPRNHolding(s) in Company
17th Feb 20127:00 amPRNLIM agreement with Uashat Mak Mani-Utenam Innu
15th Feb 201212:29 pmPRNLIM Third Quarter Financial Results and IMS
15th Feb 20127:00 amPRNLIM signs 2012 Iron Ore Sales Agreement with IOC
6th Feb 20127:00 amPRNHolding(s) in Company
20th Jan 201212:49 pmPRNHolding(s) in Company
13th Jan 20122:40 pmPRNLIM preliminary operating results for 2011
11th Jan 20127:00 amPRNDiamond drilling recommences at Parys Mountain
16th Dec 20114:40 pmRNSSecond Price Monitoring Extn
16th Dec 20114:35 pmRNSPrice Monitoring Extension
15th Dec 20114:41 pmRNSSecond Price Monitoring Extn
15th Dec 20114:35 pmRNSPrice Monitoring Extension
2nd Dec 20116:13 pmPRNHolding(s) in Company
2nd Dec 20117:00 amPRNParys exploration underway - project review continues
29th Nov 20117:00 amPRNHalf-yearly Report
18th Nov 20117:00 amPRNLIM Appoints President and COO
15th Nov 201112:05 pmPRNLIM second quarter results and second iron ore shipment
26th Oct 201112:31 pmPRNHolding(s) in Company
4th Oct 20117:00 amPRNFirst shipment of LIM iron ore sails to China
23rd Sep 20118:30 amPRNLIM reviews mine start-up at its AGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.