Stephan Bernstein, CEO of GreenRoc, details the PFS results for the new graphite processing plant. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAnglesey Mining Regulatory News (AYM)

Share Price Information for Anglesey Mining (AYM)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.40
Bid: 1.30
Ask: 1.50
Change: 0.00 (0.00%)
Spread: 0.20 (15.385%)
Open: 1.50
High: 1.52
Low: 1.40
Prev. Close: 1.40
AYM Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

LIM starts up 2012 production season at James Mine

10 Apr 2012 15:07

Anglesey Mining plc

10 April 2012

LIM starts up 2012 production season at James Mine

First trainshipments to Portof Sept Iles

Anglesey Mining's 26% owned associate Labrador Iron Mines Holdings Limited reports that its 2012 mining season commenced at the James Mine on April 2, 2012 and full scale mining operations are now underway.

On April 4, 2012 the first loaded iron ore train departed Silver Yards for the Port of Sept-Iles travelling over the TSH and QNS&L railways.

Mining Commenced at James Mine

Ore mining operations at James Mine commenced on April 2, 2012 and will continue throughout 2012, with planned total ore mined of between 2.5 to 3.0 million tonnes, together with approximately 3.5 million tonnes of waste.

It is expected that mining operations at the James North and James South deposits will continue for the season until November at a planned mining rate of approximately 15,000 tonnes of ore per day, using conventional open-pit mining methods and, where necessary employing standard drilling and blasting practices.

As in 2011, iron ore mined from the James Mine will be classed into two types, direct rail (DRO) and plant feed, with the plant producing both lump ore and sinter fine, resulting in the production of three saleable iron ore products, direct rail, lump and sinter, (collectively DSO).

The Silver Yards processing plant is expected to re-start for the season in early May 2012. The planned annual seasonal processing schedule will cover a period of seven months, or approximately 210 days, from May to November, depending on weather conditions.

Procurement and construction are well advanced for the Phase 3 expansion of the Silver Yards processing plant, designed to increase production capacity to about 2 million tonnes per year. It is expected that the planned plant expansion will be in place by mid 2012. This expansion is intended to increase plant throughput to 12,000 tonnes per day and improve weight recovery to above 75%.

LIM expects that between 1.8 and 2.0 million tonnes (DMT) of ore, including material from stockpiles, will be treated in the Silver Yards plant in 2012 which is expected to yield between 1.25 and 1.5 million tonnes (DMT) of saleable product. In addition, it is expected that between 500,000 and 750,000 tonnes of direct rail ore from both 2011 stockpiles and from 2012 mining operations will also be available for shipment in 2012, for a total 2012 saleable production target of approximately 2.0 million tonnes (DMT) of iron ore.

Expanded train service started April 4, 2012

The first ore train of the 2012 season, loaded with direct rail ore, departed Silver Yards for Sept-Iles on April 4, 2012. This first train represents the planned early start to the 2012 season compared to last year, when the first train ran on June 30, 2011. During 2011, LIM operated one train throughout the summer and added a second train in September. LIM has commenced the 2012 railing season with three trains, and expects to add a fourth train by early summer.

To enable increased railing capacity in 2012, LIM has introduced two additional trains, for a total of four trains consisting of 120 railcars each. To achieve this, and to provide an adequate allowance for repairs, LIM plans to have 555 railcars in service during 2012. Included in this figure are 400 railcars purchased in 2011, of which only 260 were in service in 2011, 10 leased railcars, and 145 used railcars that were recently purchased earlier in 2012 and are expected to be in operation by early summer 2012. LIM has established its Centre Ferro railcar maintenance and repair facility in Sept-Iles which is now operating on a full time basis to maintain LIM's enlarged fleet of railcars.

2012 Sales of Iron Ore

In February, 2012, LIM entered into an agreement with the Iron Ore Company of Canada ("IOC") for the sale of all of LIM's 2012 iron ore production. Under the 2012 confidential sales contract with IOC, the iron ore will be sold by IOC's marketing organization on the spot market for delivery to Asian markets.

IOC is Canada's largest iron ore producer from its mines located in Western Labrador and is a leading global supplier of iron ore pellets and concentrates. IOC's major shareholder and operator is the international mining group Rio Tinto which has activities in more than 40 countries throughout the world. IOC owns 100% of the Quebec North Shore and Labrador ("QNS&L") railway and, at the port of Sept-Iles, owns established storage and ore handling facilities, including its ship dock capable of taking ocean going vessels up to 240,000 (dwt) tonnes. LIM's iron ore sales agreement with IOC for 2012 enables utilization of Cape Size Ocean going ships, where current freight rates are lower than the alternative Panamax vessels.

About Labrador Iron Mines Holdings Limited (LIM)

LIM is engaged in the production and development of its 100% owned Schefferville Area direct shipping iron ore (DSO) properties in the Labrador Trough of western Labrador and north-eastern Quebec. The properties are part of the historic Schefferville area iron ore district where mining of adjacent deposits was previously carried out by the Iron Ore Company of Canada from 1954 to 1982.

LIM commenced production from the James Mine in June 2011, following the successful construction and commissioning of the mine and Silver Yards processing plant earlier in the year, and recorded its first sales of iron ore in the fall of 2011.

LIM contemplates mining in stages. The first phase of Stage 1 comprises the James Mine and the Silver Yard processing plant which is connected by a rail spur to the main Schefferville to Sept-Iles railway. Through a phased expansion program, LIM plans to grow its iron ore production through the subsequent development of adjacent deposits.

Stage 2 comprises the development of the Houston deposits, which has now completed environmental assessment and is moving to the permitting, development and construction phase.

About Anglesey Mining plc

Anglesey holds 26% of Toronto-listed Labrador Iron Mines Holdings Limited which is now producing iron ore from its James deposit, one of LIM's twenty direct shipping iron ore deposits in western Labrador and north-eastern Quebec. Development of other deposits is underway and production of the high grade hematite iron ore is targeted to grow from 2Mt in 2012 to 5Mt in 2015.

Anglesey is also carrying out development and exploration work at its 100% owned Parys Mountain zinc-copper-lead deposit in North Wales, UK where there is estimated to be a total historical resource in excess of 7 million tonnes at over 9% combined copper, lead and zinc.

For further information, please contact:

Bill Hooley, Chief Executive +44 (0)1492 541981;

Ian Cuthbertson, Finance Director +44 (0)1248 361333;

Samantha Harrison / Klara Kaczmarek,

Ambrian Partners Limited +44 (0)2076 344700;

Emily Fenton / Jos Simson,

Tavistock Communications +44 (0)20 7920 3155 / +44 (0) 7788 554035.

XLON
Date   Source Headline
18th Apr 202411:25 amPRNBlocklisting - Interim Review
18th Apr 20247:00 amPRNAppointment of new CEO
13th Mar 20247:00 amPRNFurther drilling results confirm scale of Northern Copper Zone at Parys Mountain
20th Feb 20247:00 amPRNNorthern Copper Zone Drilling Update - Broad Zone of Sulphides Intersected in Hole NCZ002
19th Jan 20247:00 amPRNParys Mountain drilling returns strong assays including 22.0m at 3.7% CuEq
19th Dec 202312:01 pmPRNHalf-year Report
13th Dec 20238:45 amPRNParys Mountain - Northern Copper Zone Drilling Update
7th Dec 202310:54 amPRNHolding(s) in Company
7th Dec 202310:52 amPRNHolding(s) in Company
5th Dec 20237:00 amPRNParys Mountain - Northern Copper Zone Drilling Update
4th Dec 20237:00 amPRNParys Mountain - Positive Preliminary Results from Metallurgical Testwork
29th Nov 20237:00 amPRNHolding(s) in Company
14th Nov 20237:00 amPRNDirectorate Change
27th Oct 20233:21 pmPRNResult of AGM
26th Oct 20239:48 amPRNParys Mountain - Exploration and Drilling Update
5th Oct 20237:00 amRNSResignation of Chief Executive Officer
2nd Oct 20239:00 amPRNBlocklisting - Interim Review
25th Sep 20237:00 amPRNAnnual Financial Report
23rd Aug 20239:28 amPRNNotification of Major Holding(s)
3rd Aug 202310:29 amPRNHolding(s) in Company
3rd Aug 20237:00 amPRNParys Mountain - Exploration and Drilling Update
25th Jul 202312:44 pmPRNResult of Placing
25th Jul 20237:00 amPRNProposed Placing to raise approximately £0.5m
28th Jun 202311:42 amPRNHolding(s) in Company
5th Jun 20231:30 pmRNSHolding(s) in Company
24th May 20237:00 amRNSHolding(s) in Company
28th Mar 20232:05 pmRNSSecond Price Monitoring Extn
28th Mar 20232:00 pmRNSPrice Monitoring Extension
10th Jan 202311:05 amRNSSecond Price Monitoring Extn
10th Jan 202311:00 amRNSPrice Monitoring Extension
10th Jan 20239:05 amRNSSecond Price Monitoring Extn
10th Jan 20239:00 amRNSPrice Monitoring Extension
6th Jan 20234:40 pmRNSSecond Price Monitoring Extn
6th Jan 20234:35 pmRNSPrice Monitoring Extension
6th Jan 20232:05 pmRNSSecond Price Monitoring Extn
6th Jan 20232:00 pmRNSPrice Monitoring Extension
6th Jan 202311:05 amRNSSecond Price Monitoring Extn
6th Jan 202311:00 amRNSPrice Monitoring Extension
13th Dec 20224:35 pmRNSPrice Monitoring Extension
22nd Aug 20222:05 pmRNSSecond Price Monitoring Extn
22nd Aug 20222:00 pmRNSPrice Monitoring Extension
8th Jun 20227:00 amRNSDeath of Bill Hooley - Deputy Chairman & Director
17th May 20224:41 pmRNSSecond Price Monitoring Extn
17th May 20224:36 pmRNSPrice Monitoring Extension
17th May 20227:00 amRNSResult of Placing and Subscription
16th May 20225:15 pmRNSProposed Placing and Subscription
13th Apr 20227:00 amPRNDirector/PDMR Shareholding
8th Apr 20228:00 amRNSRemoval- ANGLESEY MINING PLC
8th Apr 20227:00 amPRNAnglesey Mining - Admission to AIM
5th Apr 20225:30 pmRNSAnglesey Mining PLC

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.