Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAnglesey Mining Regulatory News (AYM)

Share Price Information for Anglesey Mining (AYM)

Share Price is delayed by 15 minutes
Get Live Data
5.10    0.00 (0.00%)
Bid:
5.00
Ask:
5.20
Spread: 0.20 (4.00%)
Market Cap: £3.31m
AYM Live PriceLast checked at - London Stock Exchange

Intraday Anglesey Mining Share Chart

LIM completes third operating year

4 Dec 2013 11:10

ANGLESEY MINING PLC - LIM completes third operating year

ANGLESEY MINING PLC - LIM completes third operating year

PR Newswire

London, December 4

Anglesey Mining plc 4 December 2013 LSE:AYM Labrador Iron Mines completes third operating year Anglesey Mining plc ("Anglesey") is pleased to report that Labrador Iron MinesHoldings Limited ("LIM") in which Anglesey holds a 15% interest today notifiedthe successful completion of 10 shipments of iron ore totalling approximately1.7 million wet metric tonnes ("wmt") for its 2013 operating year. Ship 9, the Myrtalia, departed from the Port of Sept-Îles on November 22, 2013,carrying approximately 169,000 wmt of 58% Fe sinter product. Ship 10, theAnangel Sailor, is scheduled to depart the Port on December 2 2013, carryingapproximately 101,000 wmt of 62% lump product. With the sale of two shipments completed in November and early December, LIMhas achieved its production target of approximately 1.7 million wmt in 10cape-size shipments for 2013. Inventory of approximately 97,000 tonnes of lumpand sinter iron ore remain in the port which could not be loaded due tofreezing conditions. LIM has now concluded its third operating season, as mining, processing andrailing activities all wrapped up in November. LIM's exploration program willcontinue through the winter months with five diamond and two reversecirculation drill rigs on site. To date, LIM has drilled approximately10,000 metres ("m"), focusing mainly on the Howse, Houston and Gill Deposits.The full 14,000-m program is anticipated to be completed before year end. LIM's mining operations are seasonal, with a planned winter closure fromDecember to March. Detailed planning for the upcoming 2014 operating season isnow underway and operations will continue to be focused on its Stage 1deposits, including the James Mine and other smaller satellite deposits andstockpiles, all located within a 15-kilometre radius of the Silver Yardsprocessing plants. An assessment of the remaining life of James Mine hascommenced to evaluate the economics of extraction in 2014 of the remaining orein the bottom of the open pit and the down-dip depth extensions of some highergrade sections. LIM is also currently evaluating an interim plan to haul Houston ore to theSilver Yards process and rail loading facilities in 2014 as a first stage,lower initial capital approach for development of the Houston deposit. TheHouston and the adjacent Malcolm deposits are estimated to together contain40.6 million tonnes grading 57.6% Fe. When in full production, the HoustonProject is expected to produce about 2.5 million tonnes of iron ore annually. Development of the Houston Project is subject to the availability of financing.LIM is evaluating various financing alternatives or off-take arrangements, and/or other potential strategic options, to fund the planned first phase Houstondevelopment and related transportation expenditures. LIM is also seeking topursue strategic initiatives aimed at permanent structural reductions inoperating costs and revenue deductions. In resuming its planned seasonal mining operations in the spring of 2014, LIMwill incur regular winter stand-by costs from December 2013 to March 2014 andseasonal start-up mining, processing, rail and transportation and siteadministration expenses for the months of April and May 2014, before receipt ofpayment for its first shipment anticipated in June 2014, and will requireworking capital of approximately $20 million to $30 million to fund theseoperating expenses. LIM's full Press Release can be found on its website atwww.labradorironmines.ca. About Labrador Iron Mines Holdings Limited (LIM) Labrador Iron Mines (LIM) is Canada's newest iron ore producer with a portfolioof direct shipping (DSO) iron ore operations and projects located in theprolific Labrador Trough. Initial production commenced at the James Mine andSilver Yards plant in June 2011 and through to the end of its third operatingyear, LIM has sold 3.8 million wet tonnes in 23 shipments of iron ore into theChinese spot market. About Anglesey Mining plc Anglesey holds 15.3% of Toronto-listed Labrador Iron Mines Holdings Limitedwhich is producing high grade hematite from a number of direct shipping ironore deposits in western Labrador and north-eastern Quebec. Anglesey is also carrying out exploration and development work at its 100%owned Parys Mountain zinc-copper-lead deposit in North Wales, UK where a JORCCode-compliant resource of 2.1mt at 6.9% combined base metals in the indicatedcategory and 4.1mt at 5.0% combined in the inferred category was published inNovember 2012. For further information, please contact: Bill Hooley, Chief Executive +44 (0)1492 541981; Danesh Varma, Finance Director +44 (0)207 6539881; Samantha Harrison: RFC Ambrian +44 (0)20 3440 6800;

Emily Fenton/Jos Simson: Tavistock Communications +44 (0)20 7920 3155.

Date   Source Headline
13th Sep 20117:00 amPRNLIM added to S & P / TSX smallcap index
8th Sep 20119:11 amPRNResult of AGM
6th Sep 201111:00 amPRNLIM production update - second ore train operating
25th Aug 20111:42 pmPRNAnnual Report and Accounts
19th Aug 20113:00 pmPRNInterim Management Statement & LIM update
19th Aug 20112:12 pmPRNInterim Management Statement
15th Aug 201112:09 pmPRNLIM signs iron ore sales agreement
28th Jul 20117:00 amPRNFinal Results
5th Jul 201112:16 pmPRNTransfer of part of director's shareholding
30th Jun 201112:12 pmPRNLIM operations update & annual financial results
7th Jun 20112:42 pmPRNLIM agreement with Innu Matimekush
27th May 20111:23 pmPRNLIM mining & plant commissioning underway
19th May 20111:17 pmPRNChange of Adviser - Ambrian appointed as broker
28th Apr 20111:13 pmPRNLIM rail agreement with Genesee
27th Apr 20117:08 amPRNLIM equity financing C$110m completed
21st Apr 20112:30 pmPRNHolding(s) in Company
5th Apr 20115:03 pmPRNLIM equity financing of C$110 million
5th Apr 20113:56 pmPRNIssue of equity & director's share dealing
5th Apr 20112:55 pmPRNApplication for Block Listing
5th Apr 201110:02 amPRNEquity financing for Labrador Iron
29th Mar 201112:15 pmPRNLIM's Houston deposit shows increased resources
18th Mar 20117:00 amPRNLIM technical report on iron ore projects
10th Mar 201112:26 pmPRNLIM Signs Rail Transportation Agreement
4th Mar 20115:14 pmPRNNew resource estimate at LIM's Denault deposit
25th Feb 20117:00 amPRNLIM Railway Agreement
18th Feb 20115:02 pmPRNInterim Management Statement
15th Feb 20113:52 pmPRN3rd Quarter Results for LIM and outlook
11th Feb 20113:05 pmPRNDrilling Report - LIM’s Houston Deposits
10th Jan 20118:01 amPRNIssue of Equity - share placing
21st Dec 20102:06 pmPRNLIM’s Mine Construction Nearing Completion
20th Dec 201012:11 pmPRNLIM signs Agreement with Uashaunnuat Innu
26th Nov 20107:00 amPRNHalf-Yearly Report
26th Nov 20107:00 amPRNHalf-Yearly Report
15th Nov 201011:23 amPRNHalf-yearly Report LIM
22nd Oct 201012:25 pmPRNLIM on Target to Complete Plant Construction by Year End
24th Sep 20103:42 pmPRNResult of AGM and Total Voting Rights
20th Sep 20104:23 pmPRNHolding(s) in Company
16th Sep 20107:00 amPRNTrading Statement - Labrador AGM
14th Sep 20103:00 pmPRNTrading Statement - Labrador Iron Operations Approved
10th Sep 20107:00 amPRNTrading Statement - Agreement with Naskapi Nation
3rd Sep 201010:00 amPRNTrading Statement - Labrador barriers to be removed
27th Aug 201011:53 amPRNInterim Management Statement
16th Aug 201012:05 pmPRNTrading Statement - Labrador Q1 results and update
29th Jul 20107:00 amPRNon Labrador Iron operations
22nd Jul 20101:32 pmPRNFinal Results
12th May 20094:41 pmRNSSecond Price Monitoring Extn
12th May 20094:35 pmRNSPrice Monitoring Extension
7th Nov 20077:01 amRNSNotice of AGM and EGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.