We would love to hear your thoughts about our site and services, please take our survey here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAnglesey Mining Regulatory News (AYM)

Share Price Information for Anglesey Mining (AYM)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.40
Bid: 1.30
Ask: 1.50
Change: 0.00 (0.00%)
Spread: 0.20 (15.385%)
Open: 1.40
High: 1.40
Low: 1.40
Prev. Close: 1.40
AYM Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Grängesberg Iron Ore Pre-Feasibility Study Commenced

9 Dec 2021 07:00

ANGLESEY MINING PLC - Grängesberg Iron Ore Pre-Feasibility Study Commenced

ANGLESEY MINING PLC - Grängesberg Iron Ore Pre-Feasibility Study Commenced

PR Newswire

London, December 8

Trading Symbol

LSE: AYM

9 December 2021

Anglesey Mining plc

(“Anglesey” or “the Company”)

Grängesberg Iron Ore Pre-Feasibility Study Commenced

Anglesey Mining plc (LSE:AYM), the UK minerals development company, is pleased to provide the following update on the Grängesberg Iron Ore Project in Sweden.

Highlights

Anglesey recently engaged Micon International to undertake an update on the 2012 Pre-Feasibility Study (PFS) to investigate the re-opening of the Grängesberg Iron Ore Project During the life of the original operation, Grängesberg produced 180Mt of iron ore. Prior to closure in 1989, when the iron ore price was trading around US$30/t, the Grängesberg mine was the third largest iron ore mine in Sweden and employed over 1,500 people. The Swedish Mining Inspectorate granted a mining for the project concession in 2013, which is valid for a minimum of 25 years. The current work programme is intended to provide an update on the PFS completed in 2012, which demonstrated an extremely robust development option based on the following parameters: Annual production of 5.3Mtpa of ore, producing 2.5Mtpa of >68% Fe concentrate, with a mine life of 16-years Probable reserves of 84Mt at 37.2% Fe derived from 148Mt of Indicated and Inferred resources

Jo Battershill, Chief Executive of Anglesey Mining, commented: “The Grängesberg mine provides significant exposure to iron ore for Anglesey Mining. The project has all the attributes of a globally significant iron ore deposit. It has a large resource, the ability to produce a high-grade iron ore concentrate and is situated adjacent to existing rail infrastructure with a direct link to the port of Oxelösund on the Baltic Sea.

The worldwide movement towards decarbonisation is resulting in manufacturers seeking to minimise their carbon footprint. The production of a >68% Fe concentrate in Europe will afford local steelmakers the opportunity to shorten their supply chains and lower overall emissions. The commissioning of the HYBRIT fossil fuel free steel plant in Sweden already demonstrates the huge progress being made with regard to ‘green steel’ in the European region. Additionally, we note with interest the recent media reports suggesting the new Prime Minister of Sweden sees the need for more mines in the country.

There are a number of companies listed on the London, Toronto and Nordic exchanges with directly comparable projects that clearly demonstrate the potential upside to Anglesey Mining shareholders. The completion of the updated PFS will be an important step towards unlocking the value of this deposit. We very much look forward to sharing the results of this study with the market in the new year.”

Grängesberg Iron Ore Project – Updated Pre-Feasibility Study

Anglesey owns a 20% stake in the Grängesberg Iron Ore Project, located 230km northwest of Stockholm in Sweden. The Company has recently appointed Micon International to commence an update of the original PFS for Grängesberg, completed in 2012. The results of the updated PFS will be important in guiding the Anglesey Board in the options to bring the Grangesberg Mine to production and on its Right of First Refusal over an additional 50.1% of the project.

The Grängesberg project is a substantial iron ore asset located in a very favourable jurisdiction and, prior to its closure in 1989, the mine produced around 180Mt of iron ore. Remaining resources were estimated at 148Mt at 41.3% Fe in an NI 43-101 Technical Report completed by Roscoe Postle Associates Inc in 2014.

ResourceTonnesFe
Category(Mt)(%)
GrängesbergIndicated115.240.2
Inferred33.145.1
Total148.341.3

Diamond drilling has confirmed that the mineralisation at Grängesberg remains of mineable widths at a depth of 1,200m below surface. Historical geophysical work suggests the orebody may be open down to a depth of 1,700m.

The Pre-Feasibility Study completed in 2012 demonstrated a probable reserve of 84Mt, which at a proposed mining rate of 5.3Mtpa, generated a mine life of more than 16-years. Historical production demonstrated that beneficiation of the ore produces a very high-grade concentrate (>68% Fe).

About Anglesey Mining plcAnglesey Mining is listed on the London Stock Exchange and currently has 248,070,732 ordinary shares on issue.

Anglesey is developing its 100% owned Parys Mountain copper-zinc-lead deposit in North Wales, UK with a 2020 reported resource of 5.2 million tonnes at 4.3% combined base metals in the Indicated category and 11.7 million tonnes at 2.8% combined base metals in the Inferred category. 

Anglesey holds an almost 20% interest, and management rights to the Grangesberg Iron project in Sweden, together with a right of first refusal to increase its interest by a further 50.1%. Anglesey also holds 12% of Labrador Iron Mines Holdings Limited which holds direct shipping iron ore deposits in Labrador and Quebec.

 

For further information, please contact:

Jo Battershill, Chief Executive +44 (0)7540 366000

John Kearney, Chairman + 1 416 362 6686

LEI: 213800X8BO8EK2B4HQ71

Date   Source Headline
24th Aug 202011:55 amPRNPlacing for £200,000 and issue of warrants
20th Apr 20204:36 pmRNSPrice Monitoring Extension
20th Apr 20202:06 pmRNSSecond Price Monitoring Extn
20th Apr 20202:00 pmRNSPrice Monitoring Extension
20th Apr 202011:06 amRNSSecond Price Monitoring Extn
20th Apr 202011:00 amRNSPrice Monitoring Extension
13th Dec 20197:00 amPRNHalf-year Report 30 September 2019
5th Sep 20194:53 pmPRNResults of AGM voting / Total Voting Rights
5th Sep 201911:00 amPRNAGM Statement / Retirement of Director
31st Jul 20197:00 amPRNAnnual Report and Notice of AGM 2019
17th May 20198:23 amPRNPlacing completed - Shares Admitted to Listing
29th Apr 20197:00 amPRNPlacing of new shares for £0.2 million
22nd Jan 20197:00 amPRNUpdate on Parys Mountain Optimisation Study
30th Nov 20187:00 amPRNInterim report for the six months to 30 September 2018
26th Nov 20184:40 pmRNSSecond Price Monitoring Extn
26th Nov 20184:35 pmRNSPrice Monitoring Extension
26th Nov 20187:00 amPRNOptimisation Study on Parys Mountain Mine Project
21st Sep 201810:10 amPRNResults of AGM voting / Total voting rights
31st Jul 20184:31 pmPRNFinal Results for year ended 31 March 2018
1st Jun 201811:05 amRNSSecond Price Monitoring Extn
1st Jun 201811:00 amRNSPrice Monitoring Extension
30th Nov 20177:00 amPRNHalf-year Report 30 Sept 17
8th Sep 20177:00 amPRNParys Mountain Project Update
4th Sep 20177:01 amPRNResult of AGM / Total voting rights
31st Jul 20177:00 amPRNAnnual Report and Notice of AGM
24th Jul 20177:00 amPRNPositive Results of Scoping Study
3rd Jul 20177:59 amPRNParys Mountain Scoping Study Progress Update
12th May 20177:00 amPRNParys Mountain Scoping Study Update
20th Mar 20177:00 amPRNPlacing of New Shares for £0.225 million
16th Dec 201612:18 pmPRNLIMH Plan of Arrangement, Placing of New Anglesey Shares
30th Nov 20167:00 amPRNPlacing of New Shares for £0.3 million
30th Nov 20167:00 amPRNPlacing of New Shares for £0.3 million
18th Nov 201611:08 amPRNHalf-year Report
16th Nov 20167:00 amPRNMarket Activity
12th Oct 20169:46 amPRNReport on Payments to Governments
29th Sep 20167:00 amPRNAGM -Chairman's remarks -Voting -Grant of share options
29th Jul 20169:00 amPRNRetirement of Director
26th Jul 20167:00 amPRNAnnual Financial Report announcement
18th Mar 20164:41 pmRNSSecond Price Monitoring Extn
18th Mar 20164:36 pmRNSPrice Monitoring Extension
14th Jan 20164:40 pmRNSSecond Price Monitoring Extn
14th Jan 20164:35 pmRNSPrice Monitoring Extension
27th Nov 20157:00 amPRNHalf-yearly Report & Interim Management Statement
24th Nov 20157:00 amPRNAppointment of Broker
29th Sep 20159:47 amPRNVoting at AGM 2015
31st Jul 20153:42 pmPRNFinal Results and annual report
26th Nov 20147:00 amPRNHalf-yearly Report
7th Oct 201410:23 amPRNBlocklisting - Interim Review
1st Oct 201410:45 amPRNResult of AGM
29th Sep 201410:00 amPRNGrangesberg NI 43-101 Resource Estimate

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.